NTISthis.com

Evidence Guide: ICPCF209C - Set up and operate in-line mail machine

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICPCF209C - Set up and operate in-line mail machine

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for job

  1. Job specifications are read and interpreted from job documentation or process control system
  2. Job is signed off by printers and ready for mailing procedures
  3. Mailing procedures are identified from job specifications
  4. The materials are checked and in correct order for the job and all sheets are in the correct position for bar code scanning if required
  5. All tracks and conveyor belts are clean and clear
  6. Work area is safe and ready for production according to safety requirements
Job specifications are read and interpreted from job documentation or process control system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job is signed off by printers and ready for mailing procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mailing procedures are identified from job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The materials are checked and in correct order for the job and all sheets are in the correct position for bar code scanning if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All tracks and conveyor belts are clean and clear

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is safe and ready for production according to safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up job

  1. The mail type is identified from job specifications
  2. Number and type of inserts are identified
  3. Job specifications are entered into console
  4. Settings are checked against job specifications before production is commenced
The mail type is identified from job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Number and type of inserts are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job specifications are entered into console

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Settings are checked against job specifications before production is commenced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor operation

  1. Machine is jogged to ensure correct positioning and hopper feed operation
  2. All sections of the machine are monitored to ensure optimum operation
  3. Envelopes are manipulated and fanned to ensure they move efficiently through the machine
  4. Folds, inserts and envelopes are continuously monitored for defects and defects are put aside for remake
  5. Materials are checked and hoppers reloaded as required
  6. Adjustments are made when the quality standards are not met
  7. Sequence is monitored according to job specifications
  8. The number of spoils are documented according to enterprise procedures
Machine is jogged to ensure correct positioning and hopper feed operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All sections of the machine are monitored to ensure optimum operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Envelopes are manipulated and fanned to ensure they move efficiently through the machine

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Folds, inserts and envelopes are continuously monitored for defects and defects are put aside for remake

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials are checked and hoppers reloaded as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustments are made when the quality standards are not met

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence is monitored according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The number of spoils are documented according to enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and rectify problems

  1. Sequence or inserter errors are identified and bar codes checked and changes entered into console, if required
  2. Tracks, conveyors and sensors are cleaned and cleared if lags and jams occur
  3. Any machine consumables needing replacement are replaced or adjusted with a minimum of downtime
  4. Faulty performance of equipment is identified and reported according to enterprise procedures
  5. Wastage is monitored, kept to a minimum and correctly disposed of according to enterprise quality standards
Sequence or inserter errors are identified and bar codes checked and changes entered into console, if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tracks, conveyors and sensors are cleaned and cleared if lags and jams occur

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Any machine consumables needing replacement are replaced or adjusted with a minimum of downtime

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faulty performance of equipment is identified and reported according to enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wastage is monitored, kept to a minimum and correctly disposed of according to enterprise quality standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pack envelopes

  1. Completed envelopes are unloaded and checked for quality
  2. Completed packages are packed into labelled trays and Australia Post labels are affixed according to job specifications
  3. Sequence numbers and postcodes are in correct pre-sort order ensuring job continuity
  4. The job is reconciled and documented and the supervisor is notified if the job does not reconcile
  5. The machine is cleared and stock put away
Completed envelopes are unloaded and checked for quality

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completed packages are packed into labelled trays and Australia Post labels are affixed according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence numbers and postcodes are in correct pre-sort order ensuring job continuity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The job is reconciled and documented and the supervisor is notified if the job does not reconcile

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The machine is cleared and stock put away

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the following is essential:

safely set up, operate and monitor an in-line mail machine and rectify any faults with productions. This will be done with minimum downtime

demonstrate all safety devices on the machine

the individual will set up and complete a job that includes multiple inserts and rectify any routine production problems that occur, with minimum downtime

evidence for assessment may be gathered from assessment of the unit of competency alone or through an integrated assessment activity.

Context of and specific resources for assessment

Assessment must ensure:

assessment may take place on the job, off the job or a combination of these

off the job assessment must be undertaken in a closely simulated workplace environment

access to an in-line cut sheet form feeder, folder and inserter.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct questioning/observation combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:

ICPSU243C Reconcile process outputs.

Required Skills and Knowledge

Required skills

using technology such as computers and in-line mail machines

OHS in relation to operating machinery

literacy skills to read job specifications and document results of job reconciliation

basic numeracy skills to reconcile mail

planning and organising by ensuring that materials are in the correct order and position prior to production

teamwork by maintaining the production process in association with others

problem solving by identifying and rectifying faults in the operation of the machine

Required knowledge

waste disposal procedures

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Mailingprocedures may include:

job could be mailed or returned to client.

Materials may include:

printed multiple or single inserts and envelopes, water for gluing.

Mail type may include:

full rate

national pre-sort

DPID.

Machine may include:

intelligent in-line cut sheet form feeder, folder and inserter.

Sections may include:

hoppers

folders

inserters

accumulator

sealers

exit conveyors.

Machinery consumables may include:

stacker wheels, belts, suckers, gripper arms, water brush, OMR readers, bar code readers, adjustments to a double detector.