The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Set up and adjust units
|
|
Job specifications are obtained and read and tools and transfer segments are available for set up Completed |
Evidence:
|
Draw rollers and nip rollers and transfer segments are positioned correctly and pressures calibrated with timing set Completed |
Evidence:
|
Gears are changed and correctly set up Completed |
Evidence:
|
Knife assembly for guillotining and serration measurements are set and accurate timing assigned Completed |
Evidence:
|
Pre-creaser blades are positioned in relation to one another and angular timing fixed Completed |
Evidence:
|
Centre grippers are correct in size, pressures and positioning Completed |
Evidence:
|
Vacuum holes are correctly positioned and opening cylinder is set up and timed Completed |
Evidence:
|
Bottom forming guides and bottom paste unit are set up Completed |
Evidence:
|
Bottom closing and patch units are calibrated Completed |
Evidence:
|
Delivery chute and bag counter are prepared and ready Completed |
Evidence:
|
Set up in-line units
|
|
Correct perforation unit or perforation impression roller is set up Completed |
Evidence:
|
Pick-up rollers are installed and pressure and time are fixed Completed |
Evidence:
|
Tucking position, timing and depth are correctly set Completed |
Evidence:
|
Glue patch applicator or glue impression roller is set up according to job specifications Completed |
Evidence:
|
Press roller is positioned and pressured and timing is programmed Completed |
Evidence:
|
Doctor blades and hot melt unit are set up Completed |
Evidence:
|
Timing between all units is checked for conformance with job specifications Completed |
Evidence:
|
Gears are changed according to job specifications Completed |
Evidence:
|
The settings and tensions of the raw material unwind and brake assembly are correct according to job specifications Completed |
Evidence:
|
Check availability of materials
|
|
Cut tubes are available and stacked ready Completed |
Evidence:
|
Adhesives are appropriate for the substrate, the application process and the machine Completed |
Evidence:
|
Correct procedures for the control of materials are followed Completed |
Evidence:
|
Check set up
|
|
Work area is safe and ready for production according to safety requirements Completed |
Evidence:
|
All details required for the job are checked again and confirmed against job specifications Completed |
Evidence:
|
Settings are checked against specifications before production is commenced Completed |
Evidence:
|
Machine is stepped to ensure the scores and folds are in the correct position and paper tension is corrected/adjusted Completed |
Evidence:
|