NTISthis.com

Evidence Guide: ICPPRN211 - Mount and proof flexographic plates for basic printing

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICPPRN211 - Mount and proof flexographic plates for basic printing

What evidence can you provide to prove your understanding of each of the following citeria?

Confirm routine job specifications

  1. Job requirements are read and interpreted from job documentation or production control system
  2. Set up is carried out correctly in minimum time with minimum wastage
  3. Prior inspections are completed and signed off
Job requirements are read and interpreted from job documentation or production control system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up is carried out correctly in minimum time with minimum wastage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prior inspections are completed and signed off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare flexographic plates

  1. Plate height and relief are measured
  2. Plates are trimmed and prepared according to mounting system requirements
  3. Mounting adhesive is selected to achieve correct pitch circle diameter (PCD) of specified plate cylinders and gears
Plate height and relief are measured

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plates are trimmed and prepared according to mounting system requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mounting adhesive is selected to achieve correct pitch circle diameter (PCD) of specified plate cylinders and gears

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare plate cylinders

  1. Plate cylinders/seamless sleeves are selected, cleaned and prepared
  2. Sleeves and correct gears on mandrels are selected, cleaned, prepared and mounted to meet routine job specifications
  3. Total indicated run-out (TIR) is checked as within specified tolerances on plate cylinders
  4. Selected mounting adhesive is applied to plate cylinders
Plate cylinders/seamless sleeves are selected, cleaned and prepared

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sleeves and correct gears on mandrels are selected, cleaned, prepared and mounted to meet routine job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Total indicated run-out (TIR) is checked as within specified tolerances on plate cylinders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Selected mounting adhesive is applied to plate cylinders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mount and proof flexographic plates on mounting/proofing machine

  1. Plates are prepared and mounted on cylinders using pin mount or microdot systems or sleeves according to chart number/print direction
  2. Plate mounting sheet is prepared to meet routine job specifications
  3. Plates are mounted to position on plate mounting sheet or camera targets
  4. Plate mounting sheet is installed and tensioned onto plate cylinder to specified chart number/print direction
  5. Plates are proofed and each plate cylinder is checked for register
  6. Flexographic plates are trimmed and taped down according to printing press requirements
Plates are prepared and mounted on cylinders using pin mount or microdot systems or sleeves according to chart number/print direction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plate mounting sheet is prepared to meet routine job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plates are mounted to position on plate mounting sheet or camera targets

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plate mounting sheet is installed and tensioned onto plate cylinder to specified chart number/print direction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plates are proofed and each plate cylinder is checked for register

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Flexographic plates are trimmed and taped down according to printing press requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Confirm routine job specifications

1.1 Job requirements are read and interpreted from job documentation or production control system

1.2 Set up is carried out correctly in minimum time with minimum wastage

1.3 Prior inspections are completed and signed off

2. Prepare flexographic plates

2.1 Plate height and relief are measured

2.2 Plates are trimmed and prepared according to mounting system requirements

2.3 Mounting adhesive is selected to achieve correct pitch circle diameter (PCD) of specified plate cylinders and gears

3. Prepare plate cylinders

3.1 Plate cylinders/seamless sleeves are selected, cleaned and prepared

3.2 Sleeves and correct gears on mandrels are selected, cleaned, prepared and mounted to meet routine job specifications

3.3 Total indicated run-out (TIR) is checked as within specified tolerances on plate cylinders

3.4 Selected mounting adhesive is applied to plate cylinders

4. Mount and proof flexographic plates on mounting/proofing machine

4.1 Plates are prepared and mounted on cylinders using pin mount or microdot systems or sleeves according to chart number/print direction

4.2 Plate mounting sheet is prepared to meet routine job specifications

4.3 Plates are mounted to position on plate mounting sheet or camera targets

4.4 Plate mounting sheet is installed and tensioned onto plate cylinder to specified chart number/print direction

4.5 Plates are proofed and each plate cylinder is checked for register

4.6 Flexographic plates are trimmed and taped down according to printing press requirements

Required Skills and Knowledge

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Confirm routine job specifications

1.1 Job requirements are read and interpreted from job documentation or production control system

1.2 Set up is carried out correctly in minimum time with minimum wastage

1.3 Prior inspections are completed and signed off

2. Prepare flexographic plates

2.1 Plate height and relief are measured

2.2 Plates are trimmed and prepared according to mounting system requirements

2.3 Mounting adhesive is selected to achieve correct pitch circle diameter (PCD) of specified plate cylinders and gears

3. Prepare plate cylinders

3.1 Plate cylinders/seamless sleeves are selected, cleaned and prepared

3.2 Sleeves and correct gears on mandrels are selected, cleaned, prepared and mounted to meet routine job specifications

3.3 Total indicated run-out (TIR) is checked as within specified tolerances on plate cylinders

3.4 Selected mounting adhesive is applied to plate cylinders

4. Mount and proof flexographic plates on mounting/proofing machine

4.1 Plates are prepared and mounted on cylinders using pin mount or microdot systems or sleeves according to chart number/print direction

4.2 Plate mounting sheet is prepared to meet routine job specifications

4.3 Plates are mounted to position on plate mounting sheet or camera targets

4.4 Plate mounting sheet is installed and tensioned onto plate cylinder to specified chart number/print direction

4.5 Plates are proofed and each plate cylinder is checked for register

4.6 Flexographic plates are trimmed and taped down according to printing press requirements

Evidence of the ability to:

prepare flexographic plates and plate cylinders on TWO occasions for basic jobs and mount these according to the selected mounting system (as specified on job documentation or production control system) according to enterprise procedures (mounting can be on either proofing machine or printing press)

proof plates and check plate cylinder registration of the flexographic plates mounted on the proofing machine for this purpose on TWO occasions for basic jobs

find and use information relevant to the task from a variety of information sources

safely operate tools and machinery (such as safely switching off machinery before cleaning is started and using of any cleaning chemicals safely).

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

determine job requirements

identify vital information on the job ticket

list checks to be done prior to set up (availability of materials etc.)

identify flexographic printing plates and mounting systems

identify health and safety concerns for safely mounting and proofing plates

identify how to ensure the correct plates for the job is chosen

describe when cushion type mounting material is used

identify how to handle plates when mounting to avoid damage to plates

list options to seal edges of plates when mounting

explain importance of measuring plate height

identify TIR (total indicated run-out) effect on press performance

define and describe procedure for V-block mounting

proofing and adjustment

identify quality control measurements to apply to the proof to test against known standards

identify checks to be made on initial print prior to running

identify how to minimise registration errors

Information sources

identify relevant information sources (including machine manuals, safety documentation and other information) relevant to this task and their location and the information included in them.