NTISthis.com

Evidence Guide: ICPSCP337 - Prepare stencil using photographic capillary method

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICPSCP337 - Prepare stencil using photographic capillary method

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare work area

  1. Work area is made clean and functional prior to commencement of work
  2. Equipment is inspected to ensure it is functional and, where necessary, appropriate remedial action is taken prior to commencement of work
  3. Chemicals are prepared, if necessary, according to work health and safety (WHS) requirements and manufacturer or supplier specifications
Work area is made clean and functional prior to commencement of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is inspected to ensure it is functional and, where necessary, appropriate remedial action is taken prior to commencement of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Chemicals are prepared, if necessary, according to work health and safety (WHS) requirements and manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare screen

  1. Screen is selected according to job specifications
  2. Chemicals are applied and removed according to WHS requirements and manufacturer or supplier specifications
Screen is selected according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Chemicals are applied and removed according to WHS requirements and manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and process capillary film

  1. Capillary film is selected according to requirements for ink type, print resolution, substrate and machine type with minimisation of waste
  2. Capillary film is cut to size according to WHS requirements and manufacturer or supplier specifications with minimisation of waste
  3. Capillary film is mounted on screen according to manufacturer or supplier specifications
  4. Screen is dried according to manufacturer or supplier specifications and enterprise procedures
  5. Backing sheet is removed according to manufacturer or supplier specifications
Capillary film is selected according to requirements for ink type, print resolution, substrate and machine type with minimisation of waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Capillary film is cut to size according to WHS requirements and manufacturer or supplier specifications with minimisation of waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Capillary film is mounted on screen according to manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Screen is dried according to manufacturer or supplier specifications and enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backing sheet is removed according to manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process material

  1. Screen is placed in vacuum frame with positive positioned according to manufacturer or supplier specifications and job specifications
  2. Exposure is calculated and stencil exposed according to manufacturer or supplier specifications
  3. Light source is positioned according to manufacturer or supplier specifications
  4. Exposed screen is removed from vacuum frame according to WHS requirements and manufacturer or supplier specifications
  5. Exposed screen is washed out according to WHS requirements and manufacturer or supplier specifications
Screen is placed in vacuum frame with positive positioned according to manufacturer or supplier specifications and job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Exposure is calculated and stencil exposed according to manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Light source is positioned according to manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Exposed screen is removed from vacuum frame according to WHS requirements and manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Exposed screen is washed out according to WHS requirements and manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dry stencil

  1. Processed stencil is dried according to manufacturer or supplier specifications
  2. Backing sheet is carefully removed and stencil checked for full adhesion
Processed stencil is dried according to manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backing sheet is carefully removed and stencil checked for full adhesion

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Block out screen

  1. Stencil is inspected for flaws, scum and orientation
  2. Non-image areas of prepared screen are blocked out with filler suitable for ink type and according to job specifications
  3. Pinholes are spotted out with suitable filler and faulty or damaged images are retouched and taped according to ink type and job specifications
Stencil is inspected for flaws, scum and orientation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Non-image areas of prepared screen are blocked out with filler suitable for ink type and according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pinholes are spotted out with suitable filler and faulty or damaged images are retouched and taped according to ink type and job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store screen

  1. Prepared screen is labelled according to enterprise specifications
  2. Prepared screen is stored in clean, dry environment according to manufacturer or supplier specifications
Prepared screen is labelled according to enterprise specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepared screen is stored in clean, dry environment according to manufacturer or supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 Prepare work area

1.1 Work area is made clean and functional prior to commencement of work

1.2 Equipment is inspected to ensure it is functional and, where necessary, appropriate remedial action is taken prior to commencement of work

1.3 Chemicals are prepared, if necessary, according to work health and safety (WHS) requirements and manufacturer or supplier specifications

2 Prepare screen

2.1 Screen is selected according to job specifications

2.2 Chemicals are applied and removed according to WHS requirements and manufacturer or supplier specifications

3 Select and process capillary film

3.1 Capillary film is selected according to requirements for ink type, print resolution, substrate and machine type with minimisation of waste

3.2 Capillary film is cut to size according to WHS requirements and manufacturer or supplier specifications with minimisation of waste

3.3 Capillary film is mounted on screen according to manufacturer or supplier specifications

3.4 Screen is dried according to manufacturer or supplier specifications and enterprise procedures

3.5 Backing sheet is removed according to manufacturer or supplier specifications

4 Process material

4.1 Screen is placed in vacuum frame with positive positioned according to manufacturer or supplier specifications and job specifications

4.2 Exposure is calculated and stencil exposed according to manufacturer or supplier specifications

4.3 Light source is positioned according to manufacturer or supplier specifications

4.4 Exposed screen is removed from vacuum frame according to WHS requirements and manufacturer or supplier specifications

4.5 Exposed screen is washed out according to WHS requirements and manufacturer or supplier specifications

5 Dry stencil

5.1 Processed stencil is dried according to manufacturer or supplier specifications

5.2 Backing sheet is carefully removed and stencil checked for full adhesion

6 Block out screen

6.1 Stencil is inspected for flaws, scum and orientation

6.2 Non-image areas of prepared screen are blocked out with filler suitable for ink type and according to job specifications

6.3 Pinholes are spotted out with suitable filler and faulty or damaged images are retouched and taped according to ink type and job specifications

7 Store screen

7.1 Prepared screen is labelled according to enterprise specifications

7.2 Prepared screen is stored in clean, dry environment according to manufacturer or supplier specifications

Required Skills and Knowledge

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 Prepare work area

1.1 Work area is made clean and functional prior to commencement of work

1.2 Equipment is inspected to ensure it is functional and, where necessary, appropriate remedial action is taken prior to commencement of work

1.3 Chemicals are prepared, if necessary, according to work health and safety (WHS) requirements and manufacturer or supplier specifications

2 Prepare screen

2.1 Screen is selected according to job specifications

2.2 Chemicals are applied and removed according to WHS requirements and manufacturer or supplier specifications

3 Select and process capillary film

3.1 Capillary film is selected according to requirements for ink type, print resolution, substrate and machine type with minimisation of waste

3.2 Capillary film is cut to size according to WHS requirements and manufacturer or supplier specifications with minimisation of waste

3.3 Capillary film is mounted on screen according to manufacturer or supplier specifications

3.4 Screen is dried according to manufacturer or supplier specifications and enterprise procedures

3.5 Backing sheet is removed according to manufacturer or supplier specifications

4 Process material

4.1 Screen is placed in vacuum frame with positive positioned according to manufacturer or supplier specifications and job specifications

4.2 Exposure is calculated and stencil exposed according to manufacturer or supplier specifications

4.3 Light source is positioned according to manufacturer or supplier specifications

4.4 Exposed screen is removed from vacuum frame according to WHS requirements and manufacturer or supplier specifications

4.5 Exposed screen is washed out according to WHS requirements and manufacturer or supplier specifications

5 Dry stencil

5.1 Processed stencil is dried according to manufacturer or supplier specifications

5.2 Backing sheet is carefully removed and stencil checked for full adhesion

6 Block out screen

6.1 Stencil is inspected for flaws, scum and orientation

6.2 Non-image areas of prepared screen are blocked out with filler suitable for ink type and according to job specifications

6.3 Pinholes are spotted out with suitable filler and faulty or damaged images are retouched and taped according to ink type and job specifications

7 Store screen

7.1 Prepared screen is labelled according to enterprise specifications

7.2 Prepared screen is stored in clean, dry environment according to manufacturer or supplier specifications

Evidence of the ability to:

correctly prepare TWO different direct screens using automatic coating equipment and expose, wash and dry the screen according to all manufacturer, job, enterprise and workplace safety requirements.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline work health and safety (WHS) requirements when degreasing screens

identify the significance of the mesh count and the selection of mesh count for the application of a capillary stencil

discuss the impact of correct tension on the screen

identify the chemicals that are used for degreasing screens

outline the maintenance procedures that are employed for equipment in the stencil preparation area

describe the peculiarities of photographic capillary stencils and the selection process

identify pollution and environmental concerns to be addressed when working with capillary films

identify wetting agents that are used to facilitate the application of the film to the screen

outline problems that are caused by dust on the surface of the mesh

discuss the importance of the position of film on the screen, the problems that can occur from poor or incorrect mounting techniques and how they can be rectified

outline WHS concerns related to exposing stencils

describe the correct drying distance and drying time, how these are calculated and the effects of incorrect drying temperatures

discuss the need to dry film under safelight conditions and the function and use of a light integrator

outline the removal of the backing sheet

describe the effect that the position, angle and distance of the light source has on the exposure process

outline the effect that temperature, pressure and time taken has on the washing out process

describe the importance of blotting up excess water from the stencil to prevent scum and streaking

outline how to determine when a stencil is dry

explain how the ink and stencil types affect the blockout

outline preventive measures that can be taken to prevent pinholes, and the importance of taping the edge of the frame

describe how a screen can be identified at a later date

identify maintenance that should be carried out on exposing, washing and drying equipment

identify required manuals, safety and other documentation and briefly outline the relevant information in each source.