NTISthis.com

Evidence Guide: ICPSP215C - Prepare screen

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICPSP215C - Prepare screen

What evidence can you provide to prove your understanding of each of the following citeria?

Select the frame

  1. Frame is selected according to job specifications
  2. Quality, type and finish of frame are specified
Frame is selected according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality, type and finish of frame are specified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare the frame

  1. Frame surface is appropriately prepared free of imperfections to receive the mesh
  2. Tools and equipment used in frame preparation are suitable to achieve the standard indicated in job specifications
Frame surface is appropriately prepared free of imperfections to receive the mesh

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment used in frame preparation are suitable to achieve the standard indicated in job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select the mesh

  1. Required mesh type is selected according to job specifications
  2. Imperfections and flaws are identified and appropriate remedial action is taken
  3. Mesh is measured and cut from bulk supply to meet screen specifications with minimum wastage
Required mesh type is selected according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Imperfections and flaws are identified and appropriate remedial action is taken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mesh is measured and cut from bulk supply to meet screen specifications with minimum wastage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stretch and fix mesh

  1. Mesh is positioned in tensioning equipment at the correct angle according to job specifications
  2. Tension is set and applied according to job specifications
  3. Tension is checked according to manufacturer's/supplier's specifications
  4. Mesh is pre-stretched prior to fixing and mesh is fixed to frame according to frame construction requirements
  5. Chemicals are mixed for application according to manufacturer's specifications
  6. Screen is removed from apparatus after appropriate curing
Mesh is positioned in tensioning equipment at the correct angle according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tension is set and applied according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tension is checked according to manufacturer's/supplier's specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mesh is pre-stretched prior to fixing and mesh is fixed to frame according to frame construction requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Chemicals are mixed for application according to manufacturer's specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Screen is removed from apparatus after appropriate curing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Convert mesh

  1. Chemicals are selected for the conversion of the mesh according to manufacturer's/supplier's specifications
  2. Chemicals are applied to effect conversion according to manufacturer's/supplier's specifications and to OHS requirements
Chemicals are selected for the conversion of the mesh according to manufacturer's/supplier's specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Chemicals are applied to effect conversion according to manufacturer's/supplier's specifications and to OHS requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store screen

  1. Screens are identified and labelled
  2. Screens are stored in a safe, clean and dry environment in subdued light
Screens are identified and labelled

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Screens are stored in a safe, clean and dry environment in subdued light

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the following is essential:

correctly prepare screens for screen printing according to job specifications

demonstrate an ability to find and use information relevant to the task from a variety of information sources

select TWO different frames types, either fixed or microchase, stretch and fix mesh as appropriate and prepare screen for stencil application, according to manufacturer's and job specifications, enterprise procedures and the listed Performance Criteria

evidence for assessment may be gathered from assessment of the unit of competency alone or through an integrated assessment activity.

Context of and specific resources for assessment

Assessment must ensure:

assessment may take place on the job, off the job or a combination of both of theses. Off the job assessment must be undertaken in a closely simulated workplace environment.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.

Required Skills and Knowledge

Required skills

OHS in relation to operating machinery such as safely switching off machinery before cleaning is started

communication of ideas and information by labelling screens

collecting, analysing and organising information by checking mesh tension for conformance to job specifications

planning and organising activities by preparing the frame prior to using the mesh

teamwork when maintaining the production process in association with fellow workers

mathematical ideas and techniques by measuring and cutting mesh from bulk supplies

problem-solving skills by identifying flaws in the mesh and taking appropriate remedial action

use of technology by using the tools required to fix the mesh

Required knowledge

OHS standards

personal protective equipment required when preparing frame surface, screen adhesive and chemical conversion and using equipment for the surface preparation

selecting and preparing the frame

purpose a frame is used

tools that you use for preparing the frame surface

observations in order to achieve a good surface for mesh adhesion

choosing and stretching the mesh

mesh types

frame size and mesh cutting

flaws or imperfections that may be found in screen mesh

measuring tension and fixing the mesh

position that is the mesh placed before tensioning

methods of pre-stretching the mesh prior to securing it

tension measurement

various methods of fixing mesh to frame

pre-tensioning techniques used

converting and storing the screen

methods of converting the screen mesh chemically

method of converting the screen mesh mechanically

method that you use to identify the mesh on this screen

ideal conditions for storing screens

manuals, safety and other documentation that are relevant to this task and where they are kept and information that is included in these documents

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Frame type may include:

frame types commonly used within the industry relative to industry sectors.

Quality standards may include:

should meet client requirements and enterprise and industry standards.

Type of mesh may include:

screen mesh thread counts, thread thickness, colours and weaves commonly used in the industry sectors.

Tension measurement may include:

different tension measurement techniques commonly used in the industry sector.

Fixing method may include:

fixing methods commonly used in the industry sector.

Degree of autonomy may include:

working to defined procedures in consultation with others to ensure production requirements are met.

Enterprise procedures may include:

tasks must be performed according to workplace and OHS procedures.