NTISthis.com

Evidence Guide: ICPSU357C - Apply quick changeover procedures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICPSU357C - Apply quick changeover procedures

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for changeover

  1. Timing of changeover is determined according to production schedule
  2. All required tools/parts/materials are obtained for changeover
  3. Process and tools/parts/materials are organised ready for changeover
  4. Liaison with relevant people is conducted for quick changeover
Timing of changeover is determined according to production schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All required tools/parts/materials are obtained for changeover

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process and tools/parts/materials are organised ready for changeover

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison with relevant people is conducted for quick changeover

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make quick changeover

  1. Quick changeover is planned according to quick changeover principles
  2. Changeover is completed according to enterprise procedures
  3. Output is checked to meet specifications
  4. Any steps which cause a problem are noted and changes recommended to problematic steps
Quick changeover is planned according to quick changeover principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Changeover is completed according to enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Output is checked to meet specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Any steps which cause a problem are noted and changes recommended to problematic steps

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Improve OHS

  1. Hazards in all steps/actions are identified
  2. Risks from each hazard are determined
  3. Actions which may be performed in a more ergonomic manner are identified
  4. Changes are recommended to improve OHS
Hazards in all steps/actions are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risks from each hazard are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Actions which may be performed in a more ergonomic manner are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Changes are recommended to improve OHS

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to:

routine positive participation in quick changeover procedures

assessment will need to occur in an organisation using quick changeover or a suitable simulation in say a workshop.

Context of and specific resources for assessment

Assessment must ensure:

assessment may take place on the job, off the job or a combination of these. Off the job assessment must be undertaken in a closely simulated workplace environment

machinery for changeover.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.

Required Skills and Knowledge

Required skills

OHS in relation to operating machinery such as safely switching off machinery before cleaning is started

communication of ideas and information by liaising with relevant staff to facilitate changeover

collecting, analysing and organising information by determining whenchangeover will be required according to production schedule

planning and organising activities by planning a quick changeover according to quick changeover principles

teamwork when working with others to affect a quick changeover

mathematical ideas and techniques by checking output to ensure that it meets specifications

problem-solving skills by identifying actions which may be performed in a more ergonomic manner

use of technology by using required tools/parts/materials for changeover

Required knowledge

principles of quick changeover

relevant procedures

purposes/requirements of changeover

methods of recommending changes

quality requirements for products

minimisation of changeover scrap

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Changeover may include:

an exchange of dies/tools (traditional), or a change between batches, or it may be any quantum equipment/process change to produce a different product eg plate changeover, stock change producing only the one product or simultaneous range of products. This is not applicable to a maintenance/PVI shutdown as experienced by continuous process manufacturers.

Procedures may include:

procedures includes all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, oral, computer-based or in some other form.

SMED may include:

changeover is sometimes referred to as SMED which is a more extreme form where SMED is an abbreviation for Single Minute Exchange of Die; literally, changing a die on a forming or stamping machine in a minute or less; broadly, the ability to perform any set up activity in a minute or less of machine or process downtime. The key to doing this is frequently the capability to convert internal set up time to external set up time. Variations on SMED include:

single-digit set up performing a set up activity in a single-digit number of minutes, ie fewer than ten

OTED: One touch exchange of die; literally, changing a die with one physical motion such as pushing a button; broadly, an extremely simple procedure for performing a set up activity.

Set up time may include:

set up time - work required to change over a machine or process from one item or operation to the next item or operation. It can be divided into two types:

internal set up work that can be done only when the machine or process is not actively engaged in production; OR

external set up work that can be done concurrently with the machine or process performing production duties.