NTISthis.com

Evidence Guide: ICTCBL213 - Construct underground telecommunications infrastructure

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL213 - Construct underground telecommunications infrastructure

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to construct underground work

  1. Obtain construction design plan from appropriate personnel to scope work and arrange for site access
  2. Notify appropriate personnel of identified safety hazards and other services
  3. Obtain plant, tools and safety equipment to perform tasks safely and efficiently
  4. Determine type of underground enclosure specified in construction design plan required for project
Obtain construction design plan from appropriate personnel to scope work and arrange for site access

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of identified safety hazards and other services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain plant, tools and safety equipment to perform tasks safely and efficiently

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine type of underground enclosure specified in construction design plan required for project

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install enclosure

  1. Use tools according to enterprise guidelines and work health and safety (WHS) regulations
  2. Place foundation of suitable material to provide safe and stable footing prior to installing underground enclosure in excavation
  3. Place recognised barrier over construction where enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities
  4. Install earth mat facility under enclosure where specified and required by enterprise
  5. Install enclosure specified in construction design plan to manufacturer’s specifications using specified materials
Use tools according to enterprise guidelines and work health and safety (WHS) regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place foundation of suitable material to provide safe and stable footing prior to installing underground enclosure in excavation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place recognised barrier over construction where enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install earth mat facility under enclosure where specified and required by enterprise

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install enclosure specified in construction design plan to manufacturer’s specifications using specified materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install connecting pipe works

  1. Install conduit in trench to enterprise specifications
  2. Connect conduit to enclosure according to manufacturer’s specifications and industry practice
Install conduit in trench to enterprise specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect conduit to enclosure according to manufacturer’s specifications and industry practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete project

  1. Complete reports according to enterprise policy and record alterations to plans using appropriate symbols
  2. Recover obsolete materials and equipment, and return to appropriate point for disposal
  3. Restore site according to requirements of enterprise or approving authority and to client satisfaction
  4. Notify appropriate personnel of job completion and obtain sign off
Complete reports according to enterprise policy and record alterations to plans using appropriate symbols

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recover obsolete materials and equipment, and return to appropriate point for disposal

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore site according to requirements of enterprise or approving authority and to client satisfaction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of job completion and obtain sign off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to construct underground work

1.1 Obtain construction design plan from appropriate personnel to scope work and arrange for site access

1.2 Notify appropriate personnel of identified safety hazards and other services

1.3 Obtain plant, tools and safety equipment to perform tasks safely and efficiently

1.4 Determine type of underground enclosure specified in construction design plan required for project

2. Install enclosure

2.1 Use tools according to enterprise guidelines and work health and safety (WHS) regulations

2.2 Place foundation of suitable material to provide safe and stable footing prior to installing underground enclosure in excavation

2.3 Place recognised barrier over construction where enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities

2.4 Install earth mat facility under enclosure where specified and required by enterprise

2.5 Install enclosure specified in construction design plan to manufacturer’s specifications using specified materials

3. Install connecting pipe works

3.1 Install conduit in trench to enterprise specifications

3.2 Connect conduit to enclosure according to manufacturer’s specifications and industry practice

4. Complete project

4.1 Complete reports according to enterprise policy and record alterations to plans using appropriate symbols

4.2 Recover obsolete materials and equipment, and return to appropriate point for disposal

4.3 Restore site according to requirements of enterprise or approving authority and to client satisfaction

4.4 Notify appropriate personnel of job completion and obtain sign off

Required Skills and Knowledge

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to construct underground work

1.1 Obtain construction design plan from appropriate personnel to scope work and arrange for site access

1.2 Notify appropriate personnel of identified safety hazards and other services

1.3 Obtain plant, tools and safety equipment to perform tasks safely and efficiently

1.4 Determine type of underground enclosure specified in construction design plan required for project

2. Install enclosure

2.1 Use tools according to enterprise guidelines and work health and safety (WHS) regulations

2.2 Place foundation of suitable material to provide safe and stable footing prior to installing underground enclosure in excavation

2.3 Place recognised barrier over construction where enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities

2.4 Install earth mat facility under enclosure where specified and required by enterprise

2.5 Install enclosure specified in construction design plan to manufacturer’s specifications using specified materials

3. Install connecting pipe works

3.1 Install conduit in trench to enterprise specifications

3.2 Connect conduit to enclosure according to manufacturer’s specifications and industry practice

4. Complete project

4.1 Complete reports according to enterprise policy and record alterations to plans using appropriate symbols

4.2 Recover obsolete materials and equipment, and return to appropriate point for disposal

4.3 Restore site according to requirements of enterprise or approving authority and to client satisfaction

4.4 Notify appropriate personnel of job completion and obtain sign off

Evidence of the ability to:

interpret and apply design plans and prepare for construction

install enclosures including pipe, pit and prefabricated manhole

construct in two different soil types: sand, rock, soil or combination soil types

shore an excavation site to meet enterprise and regulatory requirements

demonstrate use of specialised hand or power tools and equipment normally used for excavation, pipe, conduit installation and site restoration safely

complete the works and documentation

apply related work health and safety (WHS) requirements and work practices associated with excavation, enclosure installation and site restoration.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

describe the following elements of civil construction:

construction plant, tools and equipment operation

enclosure construction methods

foundations

plans

identify legislation, codes of practice and other formal agreements that impact on the work activity

identify the manufacturer’s requirements for safe operation of equipment

identify specific WHS requirements relating to the activity and site conditions

identify typical issues and challenges that occur on site.