Evidence Guide: ICTCBL309 - Construct aerial cable supports

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL309 - Construct aerial cable supports

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare site for installation

  1. Prepare for given work according to relevant legislation, codes, regulations and standards
  2. Arrange access to site according to required procedure
  3. Verify aerial cable support installation requirementsaccording to appropriate plans and recognise constraints
  4. Obtain information on location of other services from relevant authorities
  5. Inform appropriate personnel of existing and potential hazards on worksite
  6. Assess support structure as safe for normal working conditions
  7. Set up cable support installation equipment according to manufacturer’s requirements and enterprise guidelines
Prepare for given work according to relevant legislation, codes, regulations and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange access to site according to required procedure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify aerial cable support installation requirementsaccording to appropriate plans and recognise constraints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain information on location of other services from relevant authorities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inform appropriate personnel of existing and potential hazards on worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess support structure as safe for normal working conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up cable support installation equipment according to manufacturer’s requirements and enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install aerial support structures

  1. Select type of aerial cable support for catenary wire or integrated bearer installation
  2. Use basic rigging procedures, methods and equipment for working safely at heights
  3. Erect barriers according to safety requirements
  4. Construct support foundations to specifications and provide for safe and secure operation of support structure
  5. Install aerial cable supports securely following work health and safety (WHS) and environmental requirements according to plan and manufacturer’s specifications
Select type of aerial cable support for catenary wire or integrated bearer installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use basic rigging procedures, methods and equipment for working safely at heights

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect barriers according to safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct support foundations to specifications and provide for safe and secure operation of support structure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install aerial cable supports securely following work health and safety (WHS) and environmental requirements according to plan and manufacturer’s specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore site and complete documentation

  1. Reinstate site to identified requirements
  2. Complete reports on installation and design amendments and file according to enterprise requirements
  3. Notify client and obtain sign off
Reinstate site to identified requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete reports on installation and design amendments and file according to enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify client and obtain sign off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare site for installation

1.1 Prepare for given work according to relevant legislation, codes, regulations and standards

1.2 Arrange access to site according to required procedure

1.3 Verify aerial cable support installation requirementsaccording to appropriate plans and recognise constraints

1.4 Obtain information on location of other services from relevant authorities

1.5 Inform appropriate personnel of existing and potential hazards on worksite

1.6 Assess support structure as safe for normal working conditions

1.7 Set up cable support installation equipment according to manufacturer’s requirements and enterprise guidelines

2. Install aerial support structures

2.1 Select type of aerial cable support for catenary wire or integrated bearer installation

2.2 Use basic rigging procedures, methods and equipment for working safely at heights

2.3 Erect barriers according to safety requirements

2.4 Construct support foundations to specifications and provide for safe and secure operation of support structure

2.5 Install aerial cable supports securely following work health and safety (WHS) and environmental requirements according to plan and manufacturer’s specifications

3. Restore site and complete documentation

3.1 Reinstate site to identified requirements

3.2 Complete reports on installation and design amendments and file according to enterprise requirements

3.3 Notify client and obtain sign off

Required Skills and Knowledge

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare site for installation

1.1 Prepare for given work according to relevant legislation, codes, regulations and standards

1.2 Arrange access to site according to required procedure

1.3 Verify aerial cable support installation requirementsaccording to appropriate plans and recognise constraints

1.4 Obtain information on location of other services from relevant authorities

1.5 Inform appropriate personnel of existing and potential hazards on worksite

1.6 Assess support structure as safe for normal working conditions

1.7 Set up cable support installation equipment according to manufacturer’s requirements and enterprise guidelines

2. Install aerial support structures

2.1 Select type of aerial cable support for catenary wire or integrated bearer installation

2.2 Use basic rigging procedures, methods and equipment for working safely at heights

2.3 Erect barriers according to safety requirements

2.4 Construct support foundations to specifications and provide for safe and secure operation of support structure

2.5 Install aerial cable supports securely following work health and safety (WHS) and environmental requirements according to plan and manufacturer’s specifications

3. Restore site and complete documentation

3.1 Reinstate site to identified requirements

3.2 Complete reports on installation and design amendments and file according to enterprise requirements

3.3 Notify client and obtain sign off

Evidence of the ability to:

prepare site for aerial cable support construction, ensuring all relevant authorities have been notified and approvals obtained prior to commencement

install aerial support structures using pole and wall supports, applying all related health and safety requirements and work practices

use rigging procedures, methods and equipment for working safely at heights

restore site and complete documentation.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

describe the Australian Communications and Media Authority (ACMA) regulation requirements for Telecommunications Cabling Provider Rules as they apply to aerial cabling

recognise the features and operating requirements of cable supports and installation equipment

outline the legislation, codes of practice and other formal agreements that impact on aerial cable supports

outline the requirements for safe operation of equipment

describe the safety precautions required when working at heights

specify other health and safety requirements relating to the activity and site conditions

identify typical issues and challenges that occur on the work site.