Evidence Guide: ICTCBL312 - Cutover new systems and equipment on customer premises

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL312 - Cutover new systems and equipment on customer premises

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare system and equipment cutover

  1. Obtain relevant legislation, codes, regulations and standards
  2. Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements
  3. Notify appropriate personnel of identified safety hazards at worksite
  4. Determine cable route and type of cable and equipment from project plan, and identify and avoid other services
  5. Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently
  6. Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval
  7. Notify customer and network carrier of proposed cutover details and arrange for customer representation
Obtain relevant legislation, codes, regulations and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of identified safety hazards at worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine cable route and type of cable and equipment from project plan, and identify and avoid other services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify customer and network carrier of proposed cutover details and arrange for customer representation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cutover system or equipment into service

  1. Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work
  2. Test all cable connections, equipment and facilities as instructed in technical manuals and specifications
  3. Evaluate test results to ensure proper system operation and performance, and rectify if required
Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test all cable connections, equipment and facilities as instructed in technical manuals and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate test results to ensure proper system operation and performance, and rectify if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete project documentation

  1. Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements
  2. Recover obsolete materials and equipment, and return to appropriate point for disposal
  3. Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction
  4. Notify appropriate personnel of job completion and obtain sign off
Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recover obsolete materials and equipment, and return to appropriate point for disposal

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of job completion and obtain sign off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare system and equipment cutover

1.1 Obtain relevant legislation, codes, regulations and standards

1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

1.3 Notify appropriate personnel of identified safety hazards at worksite

1.4 Determine cable route and type of cable and equipment from project plan, and identify and avoid other services

1.5 Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently

1.6 Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval

1.7 Notify customer and network carrier of proposed cutover details and arrange for customer representation

2. Cutover system or equipment into service

2.1 Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work

2.2 Test all cable connections, equipment and facilities as instructed in technical manuals and specifications

2.3 Evaluate test results to ensure proper system operation and performance, and rectify if required

3. Complete project documentation

3.1 Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements

3.2 Recover obsolete materials and equipment, and return to appropriate point for disposal

3.3 Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction

3.4 Notify appropriate personnel of job completion and obtain sign off

Required Skills and Knowledge

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare system and equipment cutover

1.1 Obtain relevant legislation, codes, regulations and standards

1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

1.3 Notify appropriate personnel of identified safety hazards at worksite

1.4 Determine cable route and type of cable and equipment from project plan, and identify and avoid other services

1.5 Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently

1.6 Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval

1.7 Notify customer and network carrier of proposed cutover details and arrange for customer representation

2. Cutover system or equipment into service

2.1 Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work

2.2 Test all cable connections, equipment and facilities as instructed in technical manuals and specifications

2.3 Evaluate test results to ensure proper system operation and performance, and rectify if required

3. Complete project documentation

3.1 Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements

3.2 Recover obsolete materials and equipment, and return to appropriate point for disposal

3.3 Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction

3.4 Notify appropriate personnel of job completion and obtain sign off

Evidence of the ability to:

read and interpret plans and specifications

develop and implement a cutover work plan

install customer premises equipment

configure and test systems and equipment

apply relevant regulations and standards.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify and select cabling types, connectors and cabling structures

describe the legislation, codes of practice and other formal agreements that impact on the work activity

describe the manufacturer’s requirements for safe operation of equipment

explain the equipment requiring cutover at the customer's premises

specify the health and safety requirements relating to the activity and site conditions

identify and select the test methods and performance requirements

describe the features and operating requirements of test equipment for cutover

identify typical issues and challenges that occur on the worksite.