NTISthis.com

Evidence Guide: ICTCBL320 - Jumper metallic conductor cable in the access network

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL320 - Jumper metallic conductor cable in the access network

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare cabinet and termination frame for jumpering

  1. Arrange access according to customer and individual worksite requirements
  2. Set up work site to ensure public safety and to comply with utility provider, local, state and commonwealth requirements
  3. Inspect site to develop work health and safety (WHS) plan and notify appropriate personnel of identified safety hazards
  4. Prepare for cable jumpering work observing client practices, cable type, termination systems, earthing and protection and relevant legislative requirements
  5. Select correct jumpering activities for installation according to client practices
  6. Identify remote power feeding services that operate at above telecommunications network voltage (TNV) and special services that terminate in the cabinet of housing
  7. Take necessary precautions to work safely with network voltages and minimise service disruption to special services
  8. Remove all contaminants from worksite that may adversely affect jumpering and prepare worksite to ensure adequate visibility to minimise errors and reduce eye strain
  9. Plan block locations following client practices within the frame and allow for capacity to expand jumpering where possible
Arrange access according to customer and individual worksite requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up work site to ensure public safety and to comply with utility provider, local, state and commonwealth requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect site to develop work health and safety (WHS) plan and notify appropriate personnel of identified safety hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for cable jumpering work observing client practices, cable type, termination systems, earthing and protection and relevant legislative requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select correct jumpering activities for installation according to client practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify remote power feeding services that operate at above telecommunications network voltage (TNV) and special services that terminate in the cabinet of housing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take necessary precautions to work safely with network voltages and minimise service disruption to special services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove all contaminants from worksite that may adversely affect jumpering and prepare worksite to ensure adequate visibility to minimise errors and reduce eye strain

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan block locations following client practices within the frame and allow for capacity to expand jumpering where possible

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jumper terminal blocks on frame

  1. Install terminating modules to frame according to manufacturer’s specifications
  2. Set up jumpering reel near source terminal block and draw jumper through frame
  3. Terminate jumper to block and return, cut and terminate source end of jumper
  4. Identify and label jumpers according to client practices
  5. Install over-voltage protection devices to all cables with metallic component where required
  6. Earth cable shield to manufacturer’s specifications and industry standards
Install terminating modules to frame according to manufacturer’s specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up jumpering reel near source terminal block and draw jumper through frame

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate jumper to block and return, cut and terminate source end of jumper

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and label jumpers according to client practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install over-voltage protection devices to all cables with metallic component where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Earth cable shield to manufacturer’s specifications and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test jumpering and seal closure

  1. Conduct visual inspection to confirm that jumper is not kinked or jammed
  2. Test termination to satisfy performance specifications and record results if required
  3. Close housing, seal and re-pressurise where necessary
Conduct visual inspection to confirm that jumper is not kinked or jammed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test termination to satisfy performance specifications and record results if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Close housing, seal and re-pressurise where necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete records and restore site

  1. Update records and plans accurately with cabling details according to industry codes of practice and current Australian standards
  2. Remove installation waste and debris from worksite and dispose of according to environmental requirements to maintain safe worksite conditions
  3. Notify appropriate personnel about completion of job and obtain sign off
Update records and plans accurately with cabling details according to industry codes of practice and current Australian standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove installation waste and debris from worksite and dispose of according to environmental requirements to maintain safe worksite conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel about completion of job and obtain sign off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare cabinet and termination frame for jumpering

1.1 Arrange access according to customer and individual worksite requirements

1.2 Set up work site to ensure public safety and to comply with utility provider, local, state and commonwealth requirements

1.3 Inspect site to develop work health and safety (WHS) plan and notify appropriate personnel of identified safety hazards

1.4 Prepare for cable jumpering work observing client practices, cable type, termination systems, earthing and protection and relevant legislative requirements

1.5 Select correct jumpering activities for installation according to client practices

1.6 Identify remote power feeding services that operate at above telecommunications network voltage (TNV) and special services that terminate in the cabinet of housing

1.7 Take necessary precautions to work safely with network voltages and minimise service disruption to special services

1.8 Remove all contaminants from worksite that may adversely affect jumpering and prepare worksite to ensure adequate visibility to minimise errors and reduce eye strain

1.9 Plan block locations following client practices within the frame and allow for capacity to expand jumpering where possible

2. Jumper terminal blocks on frame

2.1 Install terminating modules to frame according to manufacturer’s specifications

2.2 Set up jumpering reel near source terminal block and draw jumper through frame

2.3 Terminate jumper to block and return, cut and terminate source end of jumper

2.4 Identify and label jumpers according to client practices

2.5 Install over-voltage protection devices to all cables with metallic component where required

2.6 Earth cable shield to manufacturer’s specifications and industry standards

3. Test jumpering and seal closure

3.1 Conduct visual inspection to confirm that jumper is not kinked or jammed

3.2 Test termination to satisfy performance specifications and record results if required

3.3 Close housing, seal and re-pressurise where necessary

4. Complete records and restore site

4.1 Update records and plans accurately with cabling details according to industry codes of practice and current Australian standards

4.2 Remove installation waste and debris from worksite and dispose of according to environmental requirements to maintain safe worksite conditions

4.3 Notify appropriate personnel about completion of job and obtain sign off

Required Skills and Knowledge

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare cabinet and termination frame for jumpering

1.1 Arrange access according to customer and individual worksite requirements

1.2 Set up work site to ensure public safety and to comply with utility provider, local, state and commonwealth requirements

1.3 Inspect site to develop work health and safety (WHS) plan and notify appropriate personnel of identified safety hazards

1.4 Prepare for cable jumpering work observing client practices, cable type, termination systems, earthing and protection and relevant legislative requirements

1.5 Select correct jumpering activities for installation according to client practices

1.6 Identify remote power feeding services that operate at above telecommunications network voltage (TNV) and special services that terminate in the cabinet of housing

1.7 Take necessary precautions to work safely with network voltages and minimise service disruption to special services

1.8 Remove all contaminants from worksite that may adversely affect jumpering and prepare worksite to ensure adequate visibility to minimise errors and reduce eye strain

1.9 Plan block locations following client practices within the frame and allow for capacity to expand jumpering where possible

2. Jumper terminal blocks on frame

2.1 Install terminating modules to frame according to manufacturer’s specifications

2.2 Set up jumpering reel near source terminal block and draw jumper through frame

2.3 Terminate jumper to block and return, cut and terminate source end of jumper

2.4 Identify and label jumpers according to client practices

2.5 Install over-voltage protection devices to all cables with metallic component where required

2.6 Earth cable shield to manufacturer’s specifications and industry standards

3. Test jumpering and seal closure

3.1 Conduct visual inspection to confirm that jumper is not kinked or jammed

3.2 Test termination to satisfy performance specifications and record results if required

3.3 Close housing, seal and re-pressurise where necessary

4. Complete records and restore site

4.1 Update records and plans accurately with cabling details according to industry codes of practice and current Australian standards

4.2 Remove installation waste and debris from worksite and dispose of according to environmental requirements to maintain safe worksite conditions

4.3 Notify appropriate personnel about completion of job and obtain sign off

Evidence of the ability to:

plan and prepare for jumpering activity including:

arranging safe access to site

identifying special services and remote power feeds a

following appropriate procedures

carry out jumpering activity including:

populate terminal frames with new terminal blocks where necessary

running jumpers through frame and terminate jumper to terminal blocks

using correct methods to terminate a range of jumpers

conducting tests and interpreting cable test results for several different types of lead-in faults

interpreting and applying relevant legislative requirements

finalise jumpering activity including:

updating records and plans to show cable locations

restoring site to required condition

obtaining final sign off.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

list the termination tools required for the work activity and explain how to operate them according to safety and manufacturer's guidelines

describe the features and operating requirements of testing equipment

describe the process used to install and maintain cabling products according to manufacturer's guidelines

outline legislation, codes of practice and other formal agreements that impact on the work activity

describe specific work health and safety requirements relating to the activity and site conditions

explain termination methods and performance requirements for jumpering activity

describe typical issues and challenges that occur on site and how to address them.