Evidence Guide: ICTCBL334 - Install underground enclosures and conduit

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL334 - Install underground enclosures and conduit

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for installation of underground enclosure and conduit

  1. Obtain construction design plan from appropriate personnel and determine and obtain type of underground enclosure specified
  2. Arrange access to site according to required enterprise procedure
  3. Inform appropriate personnel of existing and potential worksite hazards
  4. Verify location of proposed installation according to appropriate plans obtained from authorised personnel
  5. Obtain information about location of other services from relevant authorities
  6. Organise plant, tools and equipment for given work and safe work practice
  7. Place recognised barriers during construction according to safety and enterprise requirements
Obtain construction design plan from appropriate personnel and determine and obtain type of underground enclosure specified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange access to site according to required enterprise procedure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inform appropriate personnel of existing and potential worksite hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify location of proposed installation according to appropriate plans obtained from authorised personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain information about location of other services from relevant authorities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise plant, tools and equipment for given work and safe work practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place recognised barriers during construction according to safety and enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install enclosure and conduit

  1. Excavate site, maintaining stability and allowing ease of access
  2. Install enclosure or pit according to design specifications, and work health and safety (WHS) and environmental requirements
  3. Install conduit according to specifications and manufacturer requirements, ensuring internal surfaces are free from impediments and sharp edges for cable hauling
  4. Seal conduit entry into enclosure against foreign matter
  5. Install cable support structure and access facilities in pits according to specifications
Excavate site, maintaining stability and allowing ease of access

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install enclosure or pit according to design specifications, and work health and safety (WHS) and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install conduit according to specifications and manufacturer requirements, ensuring internal surfaces are free from impediments and sharp edges for cable hauling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Seal conduit entry into enclosure against foreign matter

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install cable support structure and access facilities in pits according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore site and complete documentation

  1. Complete backfill safely using suitable soil and materials that ensure conduit protection
  2. Recover obsolete materials and equipment and return to appropriate point for disposal
  3. Restore site according to requirements of enterprise or approving authority and customer satisfaction
  4. Complete reports on installation and design amendments accurately and file promptly according to enterprise requirements
  5. Notify appropriate personnel of job completion and obtain sign-off
Complete backfill safely using suitable soil and materials that ensure conduit protection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recover obsolete materials and equipment and return to appropriate point for disposal

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore site according to requirements of enterprise or approving authority and customer satisfaction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete reports on installation and design amendments accurately and file promptly according to enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of job completion and obtain sign-off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge