The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan installation of a complex digital reception system
|
|
Notify customer to arrange access to site and identify customer equipment Completed |
Evidence:
|
Select type of complex digital systems and consequent constraints on installation according to customer specifications Completed |
Evidence:
|
Complete a job safety analysis (JSA) identifying work health and safety (WHS) issues Completed |
Evidence:
|
Prepare for installation according to relevant legislation, codes, regulations and standards Completed |
Evidence:
|
Verify design requirements are suitable for site application and required system performance Completed |
Evidence:
|
Assemble complex digital reception system
|
|
Select and obtain materials, tools and equipment for installation Completed |
Evidence:
|
Select suitable headend location and cable access Completed |
Evidence:
|
Build headend according to design requirements and manufacturer’s specifications Completed |
Evidence:
|
Configure headend and distribution devices to operate according to design and manufacturer’s specifications Completed |
Evidence:
|
Run cables along identified routes Completed |
Evidence:
|
Terminate cables according to both design and manufacturer’s specifications Completed |
Evidence:
|
Test and commission system
|
|
Conduct performance test operation of headend and distribution devices Completed |
Evidence:
|
Activate system and conduct signal measurement using test equipment Completed |
Evidence:
|
Record and analyse initial test results for quality of service according to design specifications Completed |
Evidence:
|
Rectify identified faults and adjust system to optimal operation Completed |
Evidence:
|
Conduct final signal measurement using test equipment to optimise performance Completed |
Evidence:
|
Update design plans to ‘as built’ status Completed |
Evidence:
|
Complete administrative tasks
|
|
Record final commissioning test results and settings in line with client requirements Completed |
Evidence:
|
Complete appropriate records and test results, and store according to policy Completed |
Evidence:
|
Complete all financial and other documentation Completed |
Evidence:
|
Hand over to customer and obtain sign off Completed |
Evidence:
|