Evidence Guide: ICTNPL404 - Evaluate the planning requirements for provisioning a telecommunications building facility

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTNPL404 - Evaluate the planning requirements for provisioning a telecommunications building facility

What evidence can you provide to prove your understanding of each of the following citeria?

Scope the project

  1. Prepare for given work according to relevant legislation, codes, regulations and standards including work health and safety (WHS) processes and procedures
  2. Obtain building plans and specifications from planning section
  3. Determine type of facility and building services required to house telecommunications network equipment and plant to efficiently support the network
  4. Determine the purpose of the main areas or rooms in the network building and note special requirements to support safe operation of the facility
  5. Verify who is responsible for planning, provisioning, maintaining and operation of a facility
Prepare for given work according to relevant legislation, codes, regulations and standards including work health and safety (WHS) processes and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain building plans and specifications from planning section

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine type of facility and building services required to house telecommunications network equipment and plant to efficiently support the network

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the purpose of the main areas or rooms in the network building and note special requirements to support safe operation of the facility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify who is responsible for planning, provisioning, maintaining and operation of a facility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate power requirements

  1. Assess how functions of the main power and building services support network equipment and the impact if building services are not provided correctly or fail
  2. Produce a schematic diagram of the relationship of electrical components in an end-to-end power and building services system
  3. Assess different types of power sources likely to supply network equipment and determine benefits or deficiencies
  4. Determine how resiliency is built into provisioning of a reliable power supply and how different levels of reliability can be achieved
  5. Evaluate the impact of energy use and energy loads in the facility and determine how energy use can be minimised
Assess how functions of the main power and building services support network equipment and the impact if building services are not provided correctly or fail

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce a schematic diagram of the relationship of electrical components in an end-to-end power and building services system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess different types of power sources likely to supply network equipment and determine benefits or deficiencies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine how resiliency is built into provisioning of a reliable power supply and how different levels of reliability can be achieved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate the impact of energy use and energy loads in the facility and determine how energy use can be minimised

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate requirements of air conditioning services

  1. Assess the main types of air conditioning components or plant available and their suitability to building requirements, and draw a schematic diagram of proposed layout
  2. Determine how different equipment rack heat dissipation and size of a load can affect cooling needs
  3. Evaluate how deployment of network equipment and other supporting infrastructure can affect performance and loading of the installed air conditioner
Assess the main types of air conditioning components or plant available and their suitability to building requirements, and draw a schematic diagram of proposed layout

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine how different equipment rack heat dissipation and size of a load can affect cooling needs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate how deployment of network equipment and other supporting infrastructure can affect performance and loading of the installed air conditioner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate requirements of fire safety services

  1. Assess type, functions and components of fire service protection systems for fire and smoke required in a network facility for the safety and protection of people and assets
  2. Use the building plan to locate fire systems to be deployed to comply with fire regulations
  3. Evaluate effect equipment deployments may have on fire services and its ability to protect the site and maintain regulatory obligations
Assess type, functions and components of fire service protection systems for fire and smoke required in a network facility for the safety and protection of people and assets

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use the building plan to locate fire systems to be deployed to comply with fire regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate effect equipment deployments may have on fire services and its ability to protect the site and maintain regulatory obligations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate requirements of alarm systems

  1. Determine alarm requirements from the building plan and specifications
  2. Assess if basic monitoring is to be used with system or plant interrogation capabilities to produce an integrated alarm system for the facility
  3. Determine where alarm systems are monitored and actioned and the personnel responsible
  4. Evaluate what systems are used to connect power and building services output alarms, and the software requirements needed to allow interrogation
Determine alarm requirements from the building plan and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess if basic monitoring is to be used with system or plant interrogation capabilities to produce an integrated alarm system for the facility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine where alarm systems are monitored and actioned and the personnel responsible

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate what systems are used to connect power and building services output alarms, and the software requirements needed to allow interrogation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce evaluation document

  1. Assess requirements for each building service needed to support the facility, allowing for projection of future network growth and building expansion
  2. Produce an evaluation document on planning requirements for proposed provisioning including identified services to support the building facility
Assess requirements for each building service needed to support the facility, allowing for projection of future network growth and building expansion

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce an evaluation document on planning requirements for proposed provisioning including identified services to support the building facility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Scope the project

1.1 Prepare for given work according to relevant legislation, codes, regulations and standards including work health and safety (WHS) processes and procedures

1.2 Obtain building plans and specifications from planning section

1.3 Determine type of facility and building services required to house telecommunications network equipment and plant to efficiently support the network

1.4 Determine the purpose of the main areas or rooms in the network building and note special requirements to support safe operation of the facility

1.5 Verify who is responsible for planning, provisioning, maintaining and operation of a facility

2. Evaluate power requirements

2.1 Assess how functions of the main power and building services support network equipment and the impact if building services are not provided correctly or fail

2.2 Produce a schematic diagram of the relationship of electrical components in an end-to-end power and building services system

2.3 Assess different types of power sources likely to supply network equipment and determine benefits or deficiencies

2.4 Determine how resiliency is built into provisioning of a reliable power supply and how different levels of reliability can be achieved

2.5 Evaluate the impact of energy use and energy loads in the facility and determine how energy use can be minimised

3. Evaluate requirements of air conditioning services

3.1 Assess the main types of air conditioning components or plant available and their suitability to building requirements, and draw a schematic diagram of proposed layout

3.2 Determine how different equipment rack heat dissipation and size of a load can affect cooling needs

3.3 Evaluate how deployment of network equipment and other supporting infrastructure can affect performance and loading of the installed air conditioner

4. Evaluate requirements of fire safety services

4.1 Assess type, functions and components of fire service protection systems for fire and smoke required in a network facility for the safety and protection of people and assets

4.2 Use the building plan to locate fire systems to be deployed to comply with fire regulations

4.3 Evaluate effect equipment deployments may have on fire services and its ability to protect the site and maintain regulatory obligations

5. Evaluate requirements of alarm systems

5.1 Determine alarm requirements from the building plan and specifications

5.2 Assess if basic monitoring is to be used with system or plant interrogation capabilities to produce an integrated alarm system for the facility

5.3 Determine where alarm systems are monitored and actioned and the personnel responsible

5.4 Evaluate what systems are used to connect power and building services output alarms, and the software requirements needed to allow interrogation

6. Produce evaluation document

6.1 Assess requirements for each building service needed to support the facility, allowing for projection of future network growth and building expansion

6.2 Produce an evaluation document on planning requirements for proposed provisioning including identified services to support the building facility

Required Skills and Knowledge

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Scope the project

1.1 Prepare for given work according to relevant legislation, codes, regulations and standards including work health and safety (WHS) processes and procedures

1.2 Obtain building plans and specifications from planning section

1.3 Determine type of facility and building services required to house telecommunications network equipment and plant to efficiently support the network

1.4 Determine the purpose of the main areas or rooms in the network building and note special requirements to support safe operation of the facility

1.5 Verify who is responsible for planning, provisioning, maintaining and operation of a facility

2. Evaluate power requirements

2.1 Assess how functions of the main power and building services support network equipment and the impact if building services are not provided correctly or fail

2.2 Produce a schematic diagram of the relationship of electrical components in an end-to-end power and building services system

2.3 Assess different types of power sources likely to supply network equipment and determine benefits or deficiencies

2.4 Determine how resiliency is built into provisioning of a reliable power supply and how different levels of reliability can be achieved

2.5 Evaluate the impact of energy use and energy loads in the facility and determine how energy use can be minimised

3. Evaluate requirements of air conditioning services

3.1 Assess the main types of air conditioning components or plant available and their suitability to building requirements, and draw a schematic diagram of proposed layout

3.2 Determine how different equipment rack heat dissipation and size of a load can affect cooling needs

3.3 Evaluate how deployment of network equipment and other supporting infrastructure can affect performance and loading of the installed air conditioner

4. Evaluate requirements of fire safety services

4.1 Assess type, functions and components of fire service protection systems for fire and smoke required in a network facility for the safety and protection of people and assets

4.2 Use the building plan to locate fire systems to be deployed to comply with fire regulations

4.3 Evaluate effect equipment deployments may have on fire services and its ability to protect the site and maintain regulatory obligations

5. Evaluate requirements of alarm systems

5.1 Determine alarm requirements from the building plan and specifications

5.2 Assess if basic monitoring is to be used with system or plant interrogation capabilities to produce an integrated alarm system for the facility

5.3 Determine where alarm systems are monitored and actioned and the personnel responsible

5.4 Evaluate what systems are used to connect power and building services output alarms, and the software requirements needed to allow interrogation

6. Produce evaluation document

6.1 Assess requirements for each building service needed to support the facility, allowing for projection of future network growth and building expansion

6.2 Produce an evaluation document on planning requirements for proposed provisioning including identified services to support the building facility

Evidence of ability to:

evaluate facilities used for housing network equipment and how they may be used for provisioning

produce documentation that correctly associates responsibilities to planning, provisioning, maintenance and operation of a building facility

evaluate planning requirements for telecommunications building facilities

determine equipment for air conditioning systems and power supplies into building facilities

determine requirements for energy use, alarm and fire safety services.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline these aspects of network planning:

alarm monitoring and hierarchy of responsibility

capacity of air conditioning system on a given load

different building services supported at a network site

describe basic monitoring and plant interrogation capabilities

outline complexities of various levels of alarm as applied to building facilities

identify general types of facilities within building housing network equipment

outline services and equipment, including:

types of air conditioning

types of fire safety services

types of power sources

equipment deployments on fire safety services

main energy loads associated in a facility

identify regulatory obligations in relation to fire safety services

identify software systems needed to allow alarm interrogation (outputs).