The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Scope the project
|
|
Prepare for given work according to relevant legislation, codes, regulations and standards including work health and safety (WHS) processes and procedures Completed |
Evidence:
|
Obtain building plans and specifications from planning section Completed |
Evidence:
|
Determine type of facility and building services required to house telecommunications network equipment and plant to efficiently support the network Completed |
Evidence:
|
Determine the purpose of the main areas or rooms in the network building and note special requirements to support safe operation of the facility Completed |
Evidence:
|
Verify who is responsible for planning, provisioning, maintaining and operation of a facility Completed |
Evidence:
|
Evaluate power requirements
|
|
Assess how functions of the main power and building services support network equipment and the impact if building services are not provided correctly or fail Completed |
Evidence:
|
Produce a schematic diagram of the relationship of electrical components in an end-to-end power and building services system Completed |
Evidence:
|
Assess different types of power sources likely to supply network equipment and determine benefits or deficiencies Completed |
Evidence:
|
Determine how resiliency is built into provisioning of a reliable power supply and how different levels of reliability can be achieved Completed |
Evidence:
|
Evaluate the impact of energy use and energy loads in the facility and determine how energy use can be minimised Completed |
Evidence:
|
Evaluate requirements of air conditioning services
|
|
Assess the main types of air conditioning components or plant available and their suitability to building requirements, and draw a schematic diagram of proposed layout Completed |
Evidence:
|
Determine how different equipment rack heat dissipation and size of a load can affect cooling needs Completed |
Evidence:
|
Evaluate how deployment of network equipment and other supporting infrastructure can affect performance and loading of the installed air conditioner Completed |
Evidence:
|
Evaluate requirements of fire safety services
|
|
Assess type, functions and components of fire service protection systems for fire and smoke required in a network facility for the safety and protection of people and assets Completed |
Evidence:
|
Use the building plan to locate fire systems to be deployed to comply with fire regulations Completed |
Evidence:
|
Evaluate effect equipment deployments may have on fire services and its ability to protect the site and maintain regulatory obligations Completed |
Evidence:
|
Evaluate requirements of alarm systems
|
|
Determine alarm requirements from the building plan and specifications Completed |
Evidence:
|
Assess if basic monitoring is to be used with system or plant interrogation capabilities to produce an integrated alarm system for the facility Completed |
Evidence:
|
Determine where alarm systems are monitored and actioned and the personnel responsible Completed |
Evidence:
|
Evaluate what systems are used to connect power and building services output alarms, and the software requirements needed to allow interrogation Completed |
Evidence:
|
Produce evaluation document
|
|
Assess requirements for each building service needed to support the facility, allowing for projection of future network growth and building expansion Completed |
Evidence:
|
Produce an evaluation document on planning requirements for proposed provisioning including identified services to support the building facility Completed |
Evidence:
|