Evidence Guide: ICTNPL405 - Develop provisioning of telecommunications building works project

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTNPL405 - Develop provisioning of telecommunications building works project

What evidence can you provide to prove your understanding of each of the following citeria?

Scope the project

  1. Prepare for given work according to relevant legislation, codes, regulations and standards, including work health and safety (WHS) processes and procedures
  2. Determine the main role power and building services perform in a network facility and note their effect on network reliability and performance
  3. Assess the provisioning process required to identify, plan and implement power and building services for equipment deployment plans
Prepare for given work according to relevant legislation, codes, regulations and standards, including work health and safety (WHS) processes and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the main role power and building services perform in a network facility and note their effect on network reliability and performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess the provisioning process required to identify, plan and implement power and building services for equipment deployment plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess equipment and infrastructure deployments

  1. Evaluate available capacity from power and cooling plant to support the effect on floor loading, power and heat load from equipment deployments
  2. Determine different levels of reliability performance standards applicable to specific equipment deployment needs
  3. Develop a process to plan or implement a power and building services upgrade compatible to the network equipment requirements
  4. Assess options available to manage capacity growth in a facility and the effect of potential single points of failure in an end-to-end power and building services system
Evaluate available capacity from power and cooling plant to support the effect on floor loading, power and heat load from equipment deployments

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine different levels of reliability performance standards applicable to specific equipment deployment needs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop a process to plan or implement a power and building services upgrade compatible to the network equipment requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess options available to manage capacity growth in a facility and the effect of potential single points of failure in an end-to-end power and building services system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop building works programs

  1. Develop short- and long-term works programs for building projects that include minor upgrades to large installations
  2. Determine triggers that may require a power and building services capacity or reliability upgrade
  3. Prioritise projects based on customer demand and business needs
Develop short- and long-term works programs for building projects that include minor upgrades to large installations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine triggers that may require a power and building services capacity or reliability upgrade

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prioritise projects based on customer demand and business needs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess provisioning of building services

  1. Assess the possible effect on current and future use of a building or space when provisioning power and building services
  2. Produce cost estimates including constraints for provisioning of a power and building services upgrade
Assess the possible effect on current and future use of a building or space when provisioning power and building services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce cost estimates including constraints for provisioning of a power and building services upgrade

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Scope the project

1.1 Prepare for given work according to relevant legislation, codes, regulations and standards, including work health and safety (WHS) processes and procedures

1.2 Determine the main role power and building services perform in a network facility and note their effect on network reliability and performance

1.3 Assess the provisioning process required to identify, plan and implement power and building services for equipment deployment plans

2. Assess equipment and infrastructure deployments

2.1 Evaluate available capacity from power and cooling plant to support the effect on floor loading, power and heat load from equipment deployments

2.2 Determine different levels of reliability performance standards applicable to specific equipment deployment needs

2.3 Develop a process to plan or implement a power and building services upgrade compatible to the network equipment requirements

2.4 Assess options available to manage capacity growth in a facility and the effect of potential single points of failure in an end-to-end power and building services system

3. Develop building works programs

3.1 Develop short- and long-term works programs for building projects that include minor upgrades to large installations

3.2 Determine triggers that may require a power and building services capacity or reliability upgrade

3.3 Prioritise projects based on customer demand and business needs

4. Assess provisioning of building services

4.1 Assess the possible effect on current and future use of a building or space when provisioning power and building services

4.2 Produce cost estimates including constraints for provisioning of a power and building services upgrade

Required Skills and Knowledge

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Scope the project

1.1 Prepare for given work according to relevant legislation, codes, regulations and standards, including work health and safety (WHS) processes and procedures

1.2 Determine the main role power and building services perform in a network facility and note their effect on network reliability and performance

1.3 Assess the provisioning process required to identify, plan and implement power and building services for equipment deployment plans

2. Assess equipment and infrastructure deployments

2.1 Evaluate available capacity from power and cooling plant to support the effect on floor loading, power and heat load from equipment deployments

2.2 Determine different levels of reliability performance standards applicable to specific equipment deployment needs

2.3 Develop a process to plan or implement a power and building services upgrade compatible to the network equipment requirements

2.4 Assess options available to manage capacity growth in a facility and the effect of potential single points of failure in an end-to-end power and building services system

3. Develop building works programs

3.1 Develop short- and long-term works programs for building projects that include minor upgrades to large installations

3.2 Determine triggers that may require a power and building services capacity or reliability upgrade

3.3 Prioritise projects based on customer demand and business needs

4. Assess provisioning of building services

4.1 Assess the possible effect on current and future use of a building or space when provisioning power and building services

4.2 Produce cost estimates including constraints for provisioning of a power and building services upgrade

Evidence of ability to:

assess capacity and suitability of available power and building services for telecommunications building works

develop a process to implement a power and building services upgrade

develop short- and long-term works projects for equipment and infrastructure deployments

produce accurate cost estimates for provisioning.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

describe the process to assess capacity and suitability of available power and building services

outline the following features of a building works project:

correlation between building service systems to network equipment requirements

different levels of reliability performance standards, applicable to specific equipment deployment needs

information required to assess effect on floor loading, power and heat load from equipment deployments

main regulatory standards

role of power and building services, capacity and standards

establish the source of budget cost estimates

define the specific short and long term works programs

identify typical issues and challenges that occur in telecommunications building service systems and how these may be addressed

outline the process for power and building services upgrades.