NTISthis.com

Evidence Guide: ICTNPL504 - Develop planning strategies for building environment design

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTNPL504 - Develop planning strategies for building environment design

What evidence can you provide to prove your understanding of each of the following citeria?

Evaluate building environment requirements

  1. Utilise network equipment deployment plans to convert network equipment specifications into building requirements data
  2. Determine planned and forecast network equipment deployment locations and quantities to prioritise tasks
  3. Formulate justification to proceed by analysing business requirements and benefits to the business
  4. Analyse current building capacities or capabilities against planned deployment data to determine building environment shortfalls or additional needs
  5. Determine minimum needs required to address identified building services shortfalls, upgrades or changes
  6. Identify relevant standards, business and regulatory requirements that are essential for building plan compliance
Utilise network equipment deployment plans to convert network equipment specifications into building requirements data

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine planned and forecast network equipment deployment locations and quantities to prioritise tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Formulate justification to proceed by analysing business requirements and benefits to the business

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse current building capacities or capabilities against planned deployment data to determine building environment shortfalls or additional needs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine minimum needs required to address identified building services shortfalls, upgrades or changes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify relevant standards, business and regulatory requirements that are essential for building plan compliance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope building design requirements

  1. Quantify building requirements from known needs to determine if any standard deliverables can be used
  2. Assess if requirements can be met using new or alternative solutions
  3. Provide estimated costs and schedule to determine a planning solution
  4. Prepare a scoping document and supporting documentation with recommendations that complies with deployment standards and regulatory requirements
Quantify building requirements from known needs to determine if any standard deliverables can be used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess if requirements can be met using new or alternative solutions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide estimated costs and schedule to determine a planning solution

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare a scoping document and supporting documentation with recommendations that complies with deployment standards and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce project brief

  1. Prepare a project scope in required briefing format to present to the design section
  2. Plan project delivery to meet any business timing and funding constraints
  3. Produce building planning specifications with approvals and present to the building design section to be used for detailed design or construction specifications
Prepare a project scope in required briefing format to present to the design section

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan project delivery to meet any business timing and funding constraints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce building planning specifications with approvals and present to the building design section to be used for detailed design or construction specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Evaluate building environment requirements

1.1 Utilise network equipment deployment plans to convert network equipment specifications into building requirements data

1.2 Determine planned and forecast network equipment deployment locations and quantities to prioritise tasks

1.3 Formulate justification to proceed by analysing business requirements and benefits to the business

1.4 Analyse current building capacities or capabilities against planned deployment data to determine building environment shortfalls or additional needs

1.5 Determine minimum needs required to address identified building services shortfalls, upgrades or changes

1.6 Identify relevant standards, business and regulatory requirements that are essential for building plan compliance

2. Scope building design requirements

2.1 Quantify building requirements from known needs to determine if any standard deliverables can be used

2.2 Assess if requirements can be met using new or alternative solutions

2.3 Provide estimated costs and schedule to determine a planning solution

2.4 Prepare a scoping document and supporting documentation with recommendations that complies with deployment standards and regulatory requirements

3. Produce project brief

3.1 Prepare a project scope in required briefing format to present to the design section

3.2 Plan project delivery to meet any business timing and funding constraints

3.3 Produce building planning specifications with approvals and present to the building design section to be used for detailed design or construction specifications

Required Skills and Knowledge

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Evaluate building environment requirements

1.1 Utilise network equipment deployment plans to convert network equipment specifications into building requirements data

1.2 Determine planned and forecast network equipment deployment locations and quantities to prioritise tasks

1.3 Formulate justification to proceed by analysing business requirements and benefits to the business

1.4 Analyse current building capacities or capabilities against planned deployment data to determine building environment shortfalls or additional needs

1.5 Determine minimum needs required to address identified building services shortfalls, upgrades or changes

1.6 Identify relevant standards, business and regulatory requirements that are essential for building plan compliance

2. Scope building design requirements

2.1 Quantify building requirements from known needs to determine if any standard deliverables can be used

2.2 Assess if requirements can be met using new or alternative solutions

2.3 Provide estimated costs and schedule to determine a planning solution

2.4 Prepare a scoping document and supporting documentation with recommendations that complies with deployment standards and regulatory requirements

3. Produce project brief

3.1 Prepare a project scope in required briefing format to present to the design section

3.2 Plan project delivery to meet any business timing and funding constraints

3.3 Produce building planning specifications with approvals and present to the building design section to be used for detailed design or construction specifications

Evidence of ability to:

assess building environment requirements to provide network capability for current and forecast demand including consideration of merging technological development and product implementation

prepare and present a detailed scoping document with solutions, costing and project scheduling recommendations

meet forecast network capability needs and regulatory requirements.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify and discuss capability and limitations of the various network technologies to meet present and future needs

describe different costing and funding models

outline the process to review limits of a building’s facilities and services

identify network equipment requirements and use to derive building’s specifications

identify network building design

identify and apply relevant regulations and standards

discuss typical problems and challenges that describe the limitations of the various building projects work

identify ways to remain abreast of current building requirements to meet future service obligations.