Evidence Guide: ICTOPN401 - Install and test a dense wavelength division multiplexing system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTOPN401 - Install and test a dense wavelength division multiplexing system

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install DWDM units

  1. Determine number of racks and DWDM units at each site by referring to installation documents
  2. Determine DWDM unit and equipment positions within the individual racks
  3. Assemble equipment racks according to safe industry practice and manufacturer’s instructions
  4. Select tools and equipment
  5. Prepare patch panels with connectors according to installation plan
Determine number of racks and DWDM units at each site by referring to installation documents

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine DWDM unit and equipment positions within the individual racks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble equipment racks according to safe industry practice and manufacturer’s instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare patch panels with connectors according to installation plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install DWDM units and associated cabling

  1. Install DWDM unit in the designated rack position to maintain the planned link budget margin
  2. Install patch panels and ancillary equipment and connections into equipment rack in preparation for commissioning procedures
  3. Insert circuit cards into specified slot locations in readiness for commissioning procedures, but do not seat cards into backplane nor lock into position at this stage
  4. Connect optical fibre cables between circuit cards, optical multiplexers, adjoining DWDM units and patch panels according to manufacturer’s specifications
Install DWDM unit in the designated rack position to maintain the planned link budget margin

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install patch panels and ancillary equipment and connections into equipment rack in preparation for commissioning procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Insert circuit cards into specified slot locations in readiness for commissioning procedures, but do not seat cards into backplane nor lock into position at this stage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect optical fibre cables between circuit cards, optical multiplexers, adjoining DWDM units and patch panels according to manufacturer’s specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test power connections and complete installation report

  1. Measure main and redundant power supplies to verify correct polarity of ground and power connections
  2. Rectify any identified power wiring fault if applicable
  3. Confirm cooling fans, panel lights, indicator lights and alarms behave according to manufacturer’s prescribed specifications when power is applied
  4. Complete installation report and reinstate site
Measure main and redundant power supplies to verify correct polarity of ground and power connections

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify any identified power wiring fault if applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm cooling fans, panel lights, indicator lights and alarms behave according to manufacturer’s prescribed specifications when power is applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation report and reinstate site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to install DWDM units

1.1 Determine number of racks and DWDM units at each site by referring to installation documents

1.2 Determine DWDM unit and equipment positions within the individual racks

1.3 Assemble equipment racks according to safe industry practice and manufacturer’s instructions

1.4 Select tools and equipment

1.5 Prepare patch panels with connectors according to installation plan

2. Install DWDM units and associated cabling

2.1 Install DWDM unit in the designated rack position to maintain the planned link budget margin

2.2 Install patch panels and ancillary equipment and connections into equipment rack in preparation for commissioning procedures

2.3 Insert circuit cards into specified slot locations in readiness for commissioning procedures, but do not seat cards into backplane nor lock into position at this stage

2.4 Connect optical fibre cables between circuit cards, optical multiplexers, adjoining DWDM units and patch panels according to manufacturer’s specifications

3. Test power connections and complete installation report

3.1 Measure main and redundant power supplies to verify correct polarity of ground and power connections

3.2 Rectify any identified power wiring fault if applicable

3.3 Confirm cooling fans, panel lights, indicator lights and alarms behave according to manufacturer’s prescribed specifications when power is applied

3.4 Complete installation report and reinstate site

Required Skills and Knowledge

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to install DWDM units

1.1 Determine number of racks and DWDM units at each site by referring to installation documents

1.2 Determine DWDM unit and equipment positions within the individual racks

1.3 Assemble equipment racks according to safe industry practice and manufacturer’s instructions

1.4 Select tools and equipment

1.5 Prepare patch panels with connectors according to installation plan

2. Install DWDM units and associated cabling

2.1 Install DWDM unit in the designated rack position to maintain the planned link budget margin

2.2 Install patch panels and ancillary equipment and connections into equipment rack in preparation for commissioning procedures

2.3 Insert circuit cards into specified slot locations in readiness for commissioning procedures, but do not seat cards into backplane nor lock into position at this stage

2.4 Connect optical fibre cables between circuit cards, optical multiplexers, adjoining DWDM units and patch panels according to manufacturer’s specifications

3. Test power connections and complete installation report

3.1 Measure main and redundant power supplies to verify correct polarity of ground and power connections

3.2 Rectify any identified power wiring fault if applicable

3.3 Confirm cooling fans, panel lights, indicator lights and alarms behave according to manufacturer’s prescribed specifications when power is applied

3.4 Complete installation report and reinstate site

Evidence of ability to:

determine the dense wavelength division multiplexing (DWDM) requirements for a site

install a DWDM system and associated cabling according to plans and specifications

test installation for operation, power and ground connections

analyse test results and rectify faults

complete and submit an installation report.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

explain DWDM principles of operation

outline managing risk of electrostatic discharge

outline optical fibre connector types and characteristics

summarise optical fibre types and characteristics

outline specific workplace health and safety requirements that impact the safe measurement and inspection of optical connectors and optical power from laser transmission systems.