The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for FTTx planning tasks
|
|
Obtain relevant legislation, codes, regulations and standards for compliance when conducting work Completed |
Evidence:
|
Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements Completed |
Evidence:
|
Notify appropriate personnel of identified safety hazards at the worksite Completed |
Evidence:
|
Obtain tools and safety equipment and material to perform tasks safely and efficiently Completed |
Evidence:
|
Select and use required protective equipment and make site safe and secure for installation work Completed |
Evidence:
|
Identify and select plant and machinery for installation work activities Completed |
Evidence:
|
Plan FTTx activities and develop specifications
|
|
Follow work health and safety (WHS) and environmental requirements for given work and identify and avoid other services Completed |
Evidence:
|
Inspect proposed cable route visually according to cable plan and identify barriers to the cable installation Completed |
Evidence:
|
Modify cable plan, if required, and notify appropriate personnel Completed |
Evidence:
|
Prepare installation activities for FTTx provisioning according to project plan Completed |
Evidence:
|
Prepare installation specifications according to safe work practices and manufacturer’s instructions to include optical fibre cable size, distribution area (DA), distribution joint including lead-in multiport serving area (DLMSA), enclosures, location of optical network terminations (ONT), location and type of fibre distribution hub (FDH) and optical splitter provisioning Completed |
Evidence:
|
Verify cable length from customer access network fibre centre to end-user ONT is within 20 km operating limit Completed |
Evidence:
|
Consult with appropriate personnel to confirm project scope, installation requirements and installation specifications according to project plan Completed |
Evidence:
|
Complete documentation and obtain sign-off
|
|
Complete and present updated planning activities documentation to authorised personnel Completed |
Evidence:
|
Complete and provide updated specification documentation to vendors for supply of material and resources Completed |
Evidence:
|
Submit documentation to appropriate person for approval and sign-off Completed |
Evidence:
|