The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install DWDM units
|
|
Determine the number of racks and DWDM units at each site by referring to installation documents Completed |
Evidence:
|
Determine the DWDM unit and equipment positions within the individual racks Completed |
Evidence:
|
Assemble equipment racks according to safe industry practice and manufacturer’s instructions Completed |
Evidence:
|
Select tools and equipment Completed |
Evidence:
|
Prepare patch panels with connectors according to installation plan Completed |
Evidence:
|
Install DWDM units and associated cabling
|
|
Install DWDM unit in the designated rack position in order to maintain the planned link budget margin Completed |
Evidence:
|
Install patch panels and ancillary equipment and connections into equipment rack in preparation for commissioning procedures Completed |
Evidence:
|
Insert circuit cards into specified slot locations in readiness for commissioning procedures, but do not seat cards into backplane nor lock into position at this stage Completed |
Evidence:
|
Connect optical fibre cables between circuit cards, optical multiplexers, adjoining DWDM units and patch panels according to manufacturer’s specifications Completed |
Evidence:
|
Test power connections and complete the installation report
|
|
Measure the main and redundant power supplies to verify the correct polarity of the ground and power connections Completed |
Evidence:
|
Rectify any identified power wiring fault if applicable Completed |
Evidence:
|
Confirm that cooling fans, panel lights, indicator lights and alarms behave according to the manufacturer’s prescribed specifications when power is applied Completed |
Evidence:
|
Complete the installation report and reinstate site Completed |
Evidence:
|