Evidence Guide: ICTOPN504 - Test and commission a dense wavelength division multiplexing transmission system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTOPN504 - Test and commission a dense wavelength division multiplexing transmission system

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to commission DWDM transmission system

  1. Implement hazard risk control measures
  2. Review system specifications and technical data by identifying system operating parameters
  3. Obtain and check tools and test equipment needed for the work
  4. Verify all necessary equipment is installed, and circuit cards and filler cards are correctly located and seated
  5. Check interconnecting fibres to optical multiplexers and shelves are intact and correctly routed
  6. Establish communication between computer and DWDM shelf
  7. Upload latest software release to each DWDM shelf in the network
Implement hazard risk control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review system specifications and technical data by identifying system operating parameters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and check tools and test equipment needed for the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify all necessary equipment is installed, and circuit cards and filler cards are correctly located and seated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check interconnecting fibres to optical multiplexers and shelves are intact and correctly routed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish communication between computer and DWDM shelf

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Upload latest software release to each DWDM shelf in the network

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission DWDM transmission system

  1. Connect an optical test set and a physical optical loopback to the system, and select protocol compatible with DWDM hardware
  2. Check connection status and that test set data is passing correctly
  3. Monitor quality of received signal by setting performance monitoring (PM) features and retrieve PM counts
  4. Verify no errors are counted by the test set during a long term stability test while customer input signal is set to the worst case (minimum) power level
  5. Verify no alarms are generated during long term stability test period
  6. Dispose of antistatic packaging to minimise environmental impact
Connect an optical test set and a physical optical loopback to the system, and select protocol compatible with DWDM hardware

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check connection status and that test set data is passing correctly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor quality of received signal by setting performance monitoring (PM) features and retrieve PM counts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify no errors are counted by the test set during a long term stability test while customer input signal is set to the worst case (minimum) power level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify no alarms are generated during long term stability test period

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dispose of antistatic packaging to minimise environmental impact

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete test and commissioning documentation

  1. Finalise documentation on commissioning test results
  2. Present results to appropriate person according to established procedures
Finalise documentation on commissioning test results

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Present results to appropriate person according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to commission DWDM transmission system

1.1 Implement hazard risk control measures

1.2 Review system specifications and technical data by identifying system operating parameters

1.3 Obtain and check tools and test equipment needed for the work

1.4 Verify all necessary equipment is installed, and circuit cards and filler cards are correctly located and seated

1.5 Check interconnecting fibres to optical multiplexers and shelves are intact and correctly routed

1.6 Establish communication between computer and DWDM shelf

1.7 Upload latest software release to each DWDM shelf in the network

2. Commission DWDM transmission system

2.1 Connect an optical test set and a physical optical loopback to the system, and select protocol compatible with DWDM hardware

2.2 Check connection status and that test set data is passing correctly

2.3 Monitor quality of received signal by setting performance monitoring (PM) features and retrieve PM counts

2.4 Verify no errors are counted by the test set during a long term stability test while customer input signal is set to the worst case (minimum) power level

2.5 Verify no alarms are generated during long term stability test period

2.6 Dispose of antistatic packaging to minimise environmental impact

3. Complete test and commissioning documentation

3.1 Finalise documentation on commissioning test results

3.2 Present results to appropriate person according to established procedures

Required Skills and Knowledge

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to commission DWDM transmission system

1.1 Implement hazard risk control measures

1.2 Review system specifications and technical data by identifying system operating parameters

1.3 Obtain and check tools and test equipment needed for the work

1.4 Verify all necessary equipment is installed, and circuit cards and filler cards are correctly located and seated

1.5 Check interconnecting fibres to optical multiplexers and shelves are intact and correctly routed

1.6 Establish communication between computer and DWDM shelf

1.7 Upload latest software release to each DWDM shelf in the network

2. Commission DWDM transmission system

2.1 Connect an optical test set and a physical optical loopback to the system, and select protocol compatible with DWDM hardware

2.2 Check connection status and that test set data is passing correctly

2.3 Monitor quality of received signal by setting performance monitoring (PM) features and retrieve PM counts

2.4 Verify no errors are counted by the test set during a long term stability test while customer input signal is set to the worst case (minimum) power level

2.5 Verify no alarms are generated during long term stability test period

2.6 Dispose of antistatic packaging to minimise environmental impact

3. Complete test and commissioning documentation

3.1 Finalise documentation on commissioning test results

3.2 Present results to appropriate person according to established procedures

Evidence of ability to:

plan and coordinate commissioning

test and commission dense wavelength division multiplexing (DWDM) transmission system

complete commissioning documentation.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

explain possible causes of alarms in long term stability test

summarise principles of operation of DWDM

explain standard electrostatic discharge precautions

outline features and operating requirements of test equipment including:

a hand-held optical power meter

a transmission test set

an optical spectrum analyser

describe functions of an optical add drop multiplexer

explain how to set up the following:

internet protocol (IP) addressing

subnet mask

dynamic host configuration protocol (DHCP)

default gateway

summarise the International Telecommunications Union (ITU) wavelength grid for DWDM

identify optical fibre connector types and characteristics

identify optical fibre types and characteristics

explain path protection and protection switching

summarise physical optical loopbacks and software loopbacks

describe protocols used on optical DWDM systems

summarise ring topologies and linear network topologies

outline specific health and safety requirements that impact the safe inspection of optical connectors and the safe measurement of optical power from laser transmission systems.