The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Analyse specialised optical device and prepare for integration in the network
|
|
Obtain relevant legislation, codes, regulations and standards and follow work health and safety (WHS) and environmental requirements for the project work Completed |
Evidence:
|
Work safely according to relevant safety legislation and company work practices, identifying hazards and using personal protective equipment Completed |
Evidence:
|
Obtain plans and drawings of existing optical network from appropriate person and review potential locations for suitability of integrating additional hardware Completed |
Evidence:
|
Analyse and evaluate a range of integration options using device specifications which satisfy the customer’s network requirements Completed |
Evidence:
|
Prepare and submit the business case for adopting recommended integration solution Completed |
Evidence:
|
Prepare design plan with interconnection details to existing system and installation options and seek approval to proceed from customer Completed |
Evidence:
|
Undertake an impact risk assessment of the hardware integration with the network operations centre (NOC) and prepare for contingencies using contingency plan Completed |
Evidence:
|
Integrate specialised optical device in the network
|
|
Install and integrate specialised optical devices into existing network according to design plan Completed |
Evidence:
|
Test the network and evaluate results to verify optical network performance with integrated specialised optical devices in operation Completed |
Evidence:
|
Document integration of the specialised optical device in dense wavelength division multiplexing (DWDM) network
|
|
Produce an updated design plan and submit to customer with copies filed for later reference according to organisation’s policies Completed |
Evidence:
|
Prepare an evaluation report on network performance with specialised optical devices with recommendations for future enhancements Completed |
Evidence:
|
Notify NOC of job completion and obtain sign-off from appropriate person Completed |
Evidence:
|