NTISthis.com

Evidence Guide: ICTPMG201 - Prepare site for support installation

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTPMG201 - Prepare site for support installation

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for installation

  1. Confirm location of proposed installation is according to installation plan and relevant legislation, codes, regulations and standards
  2. Recognise and report hazards
  3. Obtain approvals and authorisations for work, and carry at all times during works
  4. Inform landowner or tenant of imminent works
  5. Locate adjoining services according to enterprise guidelines and work health and safety (WHS) practices
  6. Clear site of vegetation and debris according to work specifications and any relevant approvals
Confirm location of proposed installation is according to installation plan and relevant legislation, codes, regulations and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recognise and report hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain approvals and authorisations for work, and carry at all times during works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inform landowner or tenant of imminent works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate adjoining services according to enterprise guidelines and work health and safety (WHS) practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear site of vegetation and debris according to work specifications and any relevant approvals

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate site

  1. Place pegs for proposed installation according to enterprise guidelines and site plans
  2. Excavate using appropriate equipment for size of excavation and location of works, according to enterprise guidelines
  3. Conduct levelling of site within tolerance specified in installation plan
  4. Employ WHS practices and personal protective equipment, where appropriate, in manner intended by manufacturer
Place pegs for proposed installation according to enterprise guidelines and site plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate using appropriate equipment for size of excavation and location of works, according to enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct levelling of site within tolerance specified in installation plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Employ WHS practices and personal protective equipment, where appropriate, in manner intended by manufacturer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete administration

  1. Note approved alterations on original plan and design using appropriate symbols, and return plan to originator
  2. Complete and sign reports according to enterprise policy where required
  3. Inform landowner or tenant of construction completion and expected next steps according to enterprise guidelines
Note approved alterations on original plan and design using appropriate symbols, and return plan to originator

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and sign reports according to enterprise policy where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inform landowner or tenant of construction completion and expected next steps according to enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for installation

1.1 Confirm location of proposed installation is according to installation plan and relevant legislation, codes, regulations and standards

1.2 Recognise and report hazards

1.3 Obtain approvals and authorisations for work, and carry at all times during works

1.4 Inform landowner or tenant of imminent works

1.5 Locate adjoining services according to enterprise guidelines and work health and safety (WHS) practices

1.6 Clear site of vegetation and debris according to work specifications and any relevant approvals

2. Excavate site

2.1 Place pegs for proposed installation according to enterprise guidelines and site plans

2.2 Excavate using appropriate equipment for size of excavation and location of works, according to enterprise guidelines

2.3 Conduct levelling of site within tolerance specified in installation plan

2.4 Employ WHS practices and personal protective equipment, where appropriate, in manner intended by manufacturer

3. Complete administration

3.1 Note approved alterations on original plan and design using appropriate symbols, and return plan to originator

3.2 Complete and sign reports according to enterprise policy where required

3.3 Inform landowner or tenant of construction completion and expected next steps according to enterprise guidelines

Required Skills and Knowledge

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for installation

1.1 Confirm location of proposed installation is according to installation plan and relevant legislation, codes, regulations and standards

1.2 Recognise and report hazards

1.3 Obtain approvals and authorisations for work, and carry at all times during works

1.4 Inform landowner or tenant of imminent works

1.5 Locate adjoining services according to enterprise guidelines and work health and safety (WHS) practices

1.6 Clear site of vegetation and debris according to work specifications and any relevant approvals

2. Excavate site

2.1 Place pegs for proposed installation according to enterprise guidelines and site plans

2.2 Excavate using appropriate equipment for size of excavation and location of works, according to enterprise guidelines

2.3 Conduct levelling of site within tolerance specified in installation plan

2.4 Employ WHS practices and personal protective equipment, where appropriate, in manner intended by manufacturer

3. Complete administration

3.1 Note approved alterations on original plan and design using appropriate symbols, and return plan to originator

3.2 Complete and sign reports according to enterprise policy where required

3.3 Inform landowner or tenant of construction completion and expected next steps according to enterprise guidelines

Evidence of the ability to:

prepare and clear site for installation

measure and peg out excavation location and levels

safely excavate site

obtain sign off, complete reports and record variations to plans.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify construction methods and performance requirements

outline the features and operating requirements of construction equipment

identify legislation, codes of practice and other formal agreements that impact on the work activity

identify manufacturer requirements for safe operation of equipment

identify specific work health and safety (WHS) requirements relating to the activity and site conditions

describe the levelling and measuring procedures for marking out an excavation

identify and describe the operation of tools and equipment suitable for site preparation and excavation

explain typical issues and challenges that occur on site

discuss the communications strategies required when dealing with landowners and tenants.