Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTPMG502 - Develop customer premises equipment installation project plans

What evidence can you provide to prove your understanding of each of the following citeria?

Assess project requirements

  1. Discuss and clarify project deliverables with customer using available documentation
  2. Determine the type of CPE installation project proposed
  3. Evaluate access, work health and safety (WHS) and environmental issues and include in job specification
  4. Quantify and source equipment required
  5. Estimate costs using organisational costing guidelines
Discuss and clarify project deliverables with customer using available documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the type of CPE installation project proposed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate access, work health and safety (WHS) and environmental issues and include in job specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quantify and source equipment required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate costs using organisational costing guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare detailed system design and configuration

  1. Capture data necessary to project design brief
  2. Negotiate system specifications based on project requirements with customer and sales staff
  3. Translate available data into detailed system design and configuration
  4. Verify deliverables with customer
Capture data necessary to project design brief

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Negotiate system specifications based on project requirements with customer and sales staff

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Translate available data into detailed system design and configuration

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify deliverables with customer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Detail project and quality plans

  1. Develop project plan to meet customer’s needs with detailed task list, resource needs and timeframes
  2. Develop contingency plans to meet problems that may arise
  3. Produce a quality plan, incorporating process flow charts
  4. Verify plans with customer and appropriate personnel
Develop project plan to meet customer’s needs with detailed task list, resource needs and timeframes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop contingency plans to meet problems that may arise

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce a quality plan, incorporating process flow charts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify plans with customer and appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Assess project requirements

1.1 Discuss and clarify project deliverables with customer using available documentation

1.2 Determine the type of CPE installation project proposed

1.3 Evaluate access, work health and safety (WHS) and environmental issues and include in job specification

1.4 Quantify and source equipment required

1.5 Estimate costs using organisational costing guidelines

2. Prepare detailed system design and configuration

2.1 Capture data necessary to project design brief

2.2 Negotiate system specifications based on project requirements with customer and sales staff

2.3 Translate available data into detailed system design and configuration

2.4 Verify deliverables with customer

3. Detail project and quality plans

3.1 Develop project plan to meet customer’s needs with detailed task list, resource needs and timeframes

3.2 Develop contingency plans to meet problems that may arise

3.3 Produce a quality plan, incorporating process flow charts

3.4 Verify plans with customer and appropriate personnel

Required Skills and Knowledge

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Assess project requirements

1.1 Discuss and clarify project deliverables with customer using available documentation

1.2 Determine the type of CPE installation project proposed

1.3 Evaluate access, work health and safety (WHS) and environmental issues and include in job specification

1.4 Quantify and source equipment required

1.5 Estimate costs using organisational costing guidelines

2. Prepare detailed system design and configuration

2.1 Capture data necessary to project design brief

2.2 Negotiate system specifications based on project requirements with customer and sales staff

2.3 Translate available data into detailed system design and configuration

2.4 Verify deliverables with customer

3. Detail project and quality plans

3.1 Develop project plan to meet customer’s needs with detailed task list, resource needs and timeframes

3.2 Develop contingency plans to meet problems that may arise

3.3 Produce a quality plan, incorporating process flow charts

3.4 Verify plans with customer and appropriate personnel

Evidence of the ability to:

assess the equipment and performance requirements for a project on customer premises

prepare detailed system design and configuration to customer requirements

develop project and quality plans for the installation.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify and discuss the advantages of cabling types, structures and connectors

describe the common customer telecommunications applications and related equipment

explain the key advantages of connections to carrier infrastructure or equipment

identify and summarise the current legislation relating to installation of telecommunications equipment and connection to carrier services

explain environmental impacts, including options for green information and communications technology (ICT) installations

identify and determine cost-effective solutions in installations, including the advantages of leasing and purchasing

describe the attributes of network and transmission equipment

explain network topologies, interface and interconnect solutions

explain work health and safety (WHS) requirements for installations in terms of:

electrical safety

materials handling

physical hazards

confined spaces

heights

lifting

calculate the power requirements for the installation plan

describe typical performance parameters and typical faults that may be encountered in customer equipment and related connection and transmission media

identify warranty information for equipment supplies and contractor work guarantees.