Evidence Guide: ICTPMG504 - Prepare project specifications

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTPMG504 - Prepare project specifications

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for project estimate

  1. Analyse project design obtained from appropriate personnel to determine project requirements according to project plan
  2. Verify project requirements with clients and project team
  3. Ascertain impact of time restraints on estimate
  4. Analyse impact of relevant legislation, codes, regulations and standards on planning processes
  5. Establish availability of all appropriate data and documentation to allow for completion of work
Analyse project design obtained from appropriate personnel to determine project requirements according to project plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify project requirements with clients and project team

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ascertain impact of time restraints on estimate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse impact of relevant legislation, codes, regulations and standards on planning processes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish availability of all appropriate data and documentation to allow for completion of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate resource requirements

  1. Conduct site inspection to verify design details and project context
  2. Produce estimate of type, quantity and schedule of resources required for project from project plans
  3. Prioritise sequence of work appropriate to enterprise needs
  4. Calculate contractor and employee labour hours required according to project requirements, industrial awards and enterprise policies
  5. Record estimates of materials, equipment and labour hours according to enterprise guidelines
Conduct site inspection to verify design details and project context

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce estimate of type, quantity and schedule of resources required for project from project plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prioritise sequence of work appropriate to enterprise needs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calculate contractor and employee labour hours required according to project requirements, industrial awards and enterprise policies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record estimates of materials, equipment and labour hours according to enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calculate costing details

  1. Estimate amount and type of resources required for successful completion of project, including risk management and contingencies
  2. Calculate costs for resources from current information, following standard costing procedures
  3. Produce detailed record of all required resources and costing details for project specifications
Estimate amount and type of resources required for successful completion of project, including risk management and contingencies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calculate costs for resources from current information, following standard costing procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce detailed record of all required resources and costing details for project specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare detailed project plan

  1. Prepare detailed plan, including specifications for materials, equipment, resources, locations and network routes
  2. Forward plan and specifications to appropriate personnel for project implementation
Prepare detailed plan, including specifications for materials, equipment, resources, locations and network routes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Forward plan and specifications to appropriate personnel for project implementation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for project estimate

1.1 Analyse project design obtained from appropriate personnel to determine project requirements according to project plan

1.2 Verify project requirements with clients and project team

1.3 Ascertain impact of time restraints on estimate

1.4 Analyse impact of relevant legislation, codes, regulations and standards on planning processes

1.5 Establish availability of all appropriate data and documentation to allow for completion of work

2. Estimate resource requirements

2.1 Conduct site inspection to verify design details and project context

2.2 Produce estimate of type, quantity and schedule of resources required for project from project plans

2.3 Prioritise sequence of work appropriate to enterprise needs

2.4 Calculate contractor and employee labour hours required according to project requirements, industrial awards and enterprise policies

2.5 Record estimates of materials, equipment and labour hours according to enterprise guidelines

3. Calculate costing details

3.1 Estimate amount and type of resources required for successful completion of project, including risk management and contingencies

3.2 Calculate costs for resources from current information, following standard costing procedures

3.3 Produce detailed record of all required resources and costing details for project specifications

4. Prepare detailed project plan

4.1 Prepare detailed plan, including specifications for materials, equipment, resources, locations and network routes

4.2 Forward plan and specifications to appropriate personnel for project implementation

Required Skills and Knowledge

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for project estimate

1.1 Analyse project design obtained from appropriate personnel to determine project requirements according to project plan

1.2 Verify project requirements with clients and project team

1.3 Ascertain impact of time restraints on estimate

1.4 Analyse impact of relevant legislation, codes, regulations and standards on planning processes

1.5 Establish availability of all appropriate data and documentation to allow for completion of work

2. Estimate resource requirements

2.1 Conduct site inspection to verify design details and project context

2.2 Produce estimate of type, quantity and schedule of resources required for project from project plans

2.3 Prioritise sequence of work appropriate to enterprise needs

2.4 Calculate contractor and employee labour hours required according to project requirements, industrial awards and enterprise policies

2.5 Record estimates of materials, equipment and labour hours according to enterprise guidelines

3. Calculate costing details

3.1 Estimate amount and type of resources required for successful completion of project, including risk management and contingencies

3.2 Calculate costs for resources from current information, following standard costing procedures

3.3 Produce detailed record of all required resources and costing details for project specifications

4. Prepare detailed project plan

4.1 Prepare detailed plan, including specifications for materials, equipment, resources, locations and network routes

4.2 Forward plan and specifications to appropriate personnel for project implementation

Evidence of the ability to:

analyse project design to determine specification options

prepare estimates and calculate the cost of resources for a telecommunications project

prepare detailed project plan, including specifications for resources and network routes.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

explain common client telecommunications applications and related equipment

describe cost effective solutions employed in planning

describe and apply drafting techniques

explain the workplace and industry environment

describe the impact of legislative and environmental impacts, including options for green information and communications technology (ICT) installations

identify and evaluate the benefits of different network and transmission equipment

identify and evaluate the benefits of different network topologies and interface and interconnect solutions

identify the possible implications for a planned design on health and safety

identify and describe various warranty information and contractor work guarantees.