The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for WiMAX equipment installation
|
|
Arrange access to site according to required procedure Completed |
Evidence:
|
Verify customer requirements, type of WiMAX CPE equipment and location of proposed installation according to plans obtained from authorised personnel Completed |
Evidence:
|
Prepare tools, equipment and CPE required for installation Completed |
Evidence:
|
Install outdoor unit and antenna
|
|
Make worksite safe by identifying existing and potential hazards Completed |
Evidence:
|
Comply with relevant legislation, codes, regulations and standards, work health and safety (WHS) and environmental requirements Completed |
Evidence:
|
Mount outdoor unit according to manufacturer’s specifications and enterprise plans Completed |
Evidence:
|
Connect outdoor unit to indoor unit using specified cable Completed |
Evidence:
|
Position antenna towards distant WiMAX base station for preliminary orientation Completed |
Evidence:
|
Align unit for maximum signal strength using received signal strength indication (RSSI) display Completed |
Evidence:
|
Record installation and alignment details Completed |
Evidence:
|
Connect indoor unit and accessories to customer equipment Completed |
Evidence:
|
Test performance of installation
|
|
Test WiMAX CPE according to manufacturer’s procedures Completed |
Evidence:
|
Check operating environment does not degrade test results Completed |
Evidence:
|
Evaluate test results to verify operational performance with customer Completed |
Evidence:
|
Restore site and complete documentation
|
|
Restore worksite to customer’s satisfaction Completed |
Evidence:
|
Complete reports on installation Completed |
Evidence:
|
Notify customer and obtain sign off Completed |
Evidence:
|