The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for jointing
|
|
Use safety equipment to protect self and public in accordance with enterprise guidelines and occupational health and safety practices Completed |
Evidence:
|
Read and interpret installation plan and physical conditions at site to determine layout of job Completed |
Evidence:
|
Copy of records is obtained, where appropriate Completed |
Evidence:
|
Locate and identify adjoining services in accordance with enterprise guidelines and occupational health and safety practices Completed |
Evidence:
|
Test for presence of dangerous gases in accordance with enterprise guidelines Completed |
Evidence:
|
Approved alterations to the design are undertaken in accordance with enterprise guidelines Completed |
Evidence:
|
Verify coaxial cable placement
|
|
Cable segregation is maintained to industry standard requirements Completed |
Evidence:
|
Protect integrity of the coaxial shield cable to ensure no loss of continuity Completed |
Evidence:
|
Minimum bend radius in not exceeded in accordance with manufacturer's specifications Completed |
Evidence:
|
Cable is placed in position with sufficient slack to allow termination Completed |
Evidence:
|
Cable placement follows installation designs and specifications accurately Completed |
Evidence:
|
Cable is installed in a safe manner without damage to cable or customer's premises Completed |
Evidence:
|
Cable lengths do not exceed manufacturer's or design specifications to maintain radio frequency signal strength Completed |
Evidence:
|
Secure coaxial cable
|
|
Locate securing hardware to reduce the cumulative effect on cable wave shape properties Completed |
Evidence:
|
Cable ties and brackets are flexible and do not damage cable during securing or while in use Completed |
Evidence:
|
Joint coaxial cable
|
|
Strip coaxial cable in accordance with specifications to required length using appropriate tool Completed |
Evidence:
|
Select appropriate kit to match the type of coaxial cable in use Completed |
Evidence:
|
Jointing method is in accordance with manufacturer's recommendations Completed |
Evidence:
|
Jointing fitting retains the segregation of conductor and shield Completed |
Evidence:
|
All joints are sealed in accordance with manufacturer's specifications Completed |
Evidence:
|
Terminate coaxial cable
|
|
Strip coaxial cable in accordance with specifications to required length using appropriate tool Completed |
Evidence:
|
Select connectors to match the type of coaxial cable in use Completed |
Evidence:
|
Terminating method is in accordance with manufacturer's recommendations Completed |
Evidence:
|
Connector fitting retains the segregation of conductor and shield Completed |
Evidence:
|
Connectors are terminated to torque as recommended by manufacturer's to ensure no radio frequency leakage can occur Completed |
Evidence:
|
Gauge tests are carried out to connector mating specifications Completed |
Evidence:
|
The termination maintains a continuous ground Completed |
Evidence:
|
All terminations are waterproof where appropriate to minimise risk of damage to termination and cable function Completed |
Evidence:
|
Complete splicing operation
|
|
Place cables in enclosure and lay up in accordance with manufacturer's instructions and enterprise guidelines Completed |
Evidence:
|
Other cables are tidy and no safety hazards are evident Completed |
Evidence:
|
Other services are in place in accordance with enterprise guidelines Completed |
Evidence:
|
Waste and debris are removed from worksite and disposed of in accordance with environmental requirements and to maintain safe worksite conditions Completed |
Evidence:
|
Site is reinstated and tools and materials are stored in accordance with enterprise guidelines Completed |
Evidence:
|
Complete installation administration
|
|
Complete reports in accordance with enterprise policy Completed |
Evidence:
|
Note alterations to plans using appropriate symbols Completed |
Evidence:
|