Evidence Guide: ICTTC066D - Joint and terminate coaxial cable

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTTC066D - Joint and terminate coaxial cable

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for jointing

  1. Use safety equipment to protect self and public in accordance with enterprise guidelines and occupational health and safety practices
  2. Read and interpret installation plan and physical conditions at site to determine layout of job
  3. Copy of records is obtained, where appropriate
  4. Locate and identify adjoining services in accordance with enterprise guidelines and occupational health and safety practices
  5. Test for presence of dangerous gases in accordance with enterprise guidelines
  6. Approved alterations to the design are undertaken in accordance with enterprise guidelines
Use safety equipment to protect self and public in accordance with enterprise guidelines and occupational health and safety practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Read and interpret installation plan and physical conditions at site to determine layout of job

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Copy of records is obtained, where appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate and identify adjoining services in accordance with enterprise guidelines and occupational health and safety practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test for presence of dangerous gases in accordance with enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved alterations to the design are undertaken in accordance with enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify coaxial cable placement

  1. Cable segregation is maintained to industry standard requirements
  2. Protect integrity of the coaxial shield cable to ensure no loss of continuity
  3. Minimum bend radius in not exceeded in accordance with manufacturer's specifications
  4. Cable is placed in position with sufficient slack to allow termination
  5. Cable placement follows installation designs and specifications accurately
  6. Cable is installed in a safe manner without damage to cable or customer's premises
  7. Cable lengths do not exceed manufacturer's or design specifications to maintain radio frequency signal strength
Cable segregation is maintained to industry standard requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protect integrity of the coaxial shield cable to ensure no loss of continuity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Minimum bend radius in not exceeded in accordance with manufacturer's specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable is placed in position with sufficient slack to allow termination

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable placement follows installation designs and specifications accurately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable is installed in a safe manner without damage to cable or customer's premises

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable lengths do not exceed manufacturer's or design specifications to maintain radio frequency signal strength

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Secure coaxial cable

  1. Locate securing hardware to reduce the cumulative effect on cable wave shape properties
  2. Cable ties and brackets are flexible and do not damage cable during securing or while in use
Locate securing hardware to reduce the cumulative effect on cable wave shape properties

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable ties and brackets are flexible and do not damage cable during securing or while in use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Joint coaxial cable

  1. Strip coaxial cable in accordance with specifications to required length using appropriate tool
  2. Select appropriate kit to match the type of coaxial cable in use
  3. Jointing method is in accordance with manufacturer's recommendations
  4. Jointing fitting retains the segregation of conductor and shield
  5. All joints are sealed in accordance with manufacturer's specifications
Strip coaxial cable in accordance with specifications to required length using appropriate tool

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select appropriate kit to match the type of coaxial cable in use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jointing method is in accordance with manufacturer's recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jointing fitting retains the segregation of conductor and shield

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All joints are sealed in accordance with manufacturer's specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate coaxial cable

  1. Strip coaxial cable in accordance with specifications to required length using appropriate tool
  2. Select connectors to match the type of coaxial cable in use
  3. Terminating method is in accordance with manufacturer's recommendations
  4. Connector fitting retains the segregation of conductor and shield
  5. Connectors are terminated to torque as recommended by manufacturer's to ensure no radio frequency leakage can occur
  6. Gauge tests are carried out to connector mating specifications
  7. The termination maintains a continuous ground
  8. All terminations are waterproof where appropriate to minimise risk of damage to termination and cable function
Strip coaxial cable in accordance with specifications to required length using appropriate tool

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select connectors to match the type of coaxial cable in use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminating method is in accordance with manufacturer's recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connector fitting retains the segregation of conductor and shield

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connectors are terminated to torque as recommended by manufacturer's to ensure no radio frequency leakage can occur

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gauge tests are carried out to connector mating specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The termination maintains a continuous ground

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All terminations are waterproof where appropriate to minimise risk of damage to termination and cable function

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete splicing operation

  1. Place cables in enclosure and lay up in accordance with manufacturer's instructions and enterprise guidelines
  2. Other cables are tidy and no safety hazards are evident
  3. Other services are in place in accordance with enterprise guidelines
  4. Waste and debris are removed from worksite and disposed of in accordance with environmental requirements and to maintain safe worksite conditions
  5. Site is reinstated and tools and materials are stored in accordance with enterprise guidelines
Place cables in enclosure and lay up in accordance with manufacturer's instructions and enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Other cables are tidy and no safety hazards are evident

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Other services are in place in accordance with enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waste and debris are removed from worksite and disposed of in accordance with environmental requirements and to maintain safe worksite conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is reinstated and tools and materials are stored in accordance with enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation administration

  1. Complete reports in accordance with enterprise policy
  2. Note alterations to plans using appropriate symbols
Complete reports in accordance with enterprise policy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Note alterations to plans using appropriate symbols

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the following is essential:

Obtain information from plans and documents.

Notify relevant authorities and obtain approvals prior to commencement.

Jointing of cable including:

Placement of cable supports

Bending of cable within specified tolerances

Kit selection

Retention of segregation of conductor and shield

Either aerial or underground work

Termination of cable including:

Stripping to specified length

Connector selection

Retention of segregation of conductor and shield

Termination to torque

Conduct of gauge tests

Maintenance of continuous ground

Waterproofing of termination

Safe use of any specialised hand or power tools and/or equipment and application of all related OHS requirements and work practices.

Conduct of signal strength tests and interpretation of results.

Communication of jointing details with customers and work associates.

Context of and specific resources for assessment

Assessment must ensure:

A workplace conducting the operations covered by this competency unit, equipment and resources relevant to the context of the work (See Range Statement) and support from a competent supervisor or mentor.

OR

A simulated environment with similar provisions which conforms to the Assessment Guidelines.

Guidance information for assessment

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess underpinning knowledge.

Required Skills and Knowledge

Required skills

Select from the following list to suit the learning and assessment context

Codes refer to the Skills and Knowledge Register in Volume 3 of this Training Package that has detailed content guidelines for each code outlined.

CA360 Coaxial Cabling

CI310 Communication 3

EL310 AC/DC Theory 3

MA210 Basic Telecommunications Mathematics

OH310 Occupational Health and Safety 3

PS310 Plans and Specifications 3

PS320 Basic Building Trades 3

RE235 Regulations for CAN

RE310 Working on Non-enterprise Land 3

TO310 Use of Tools 3

TO330 Installation Practices 3

Required knowledge

The relevant required knowledge is articulated in the above guidelines contained in the Skills and Knowledge Register included in this Training Package.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Coaxial cable

May be supplied in various grades as designed for different environments and intended uses

May be: hard line (internal/external), flexible (internal/ external), underground, aerial, powered / unpowered

Connector types

May include: internal/external, pin type, integral pin, separate pin

Customers specifications

May be found in: contract documents, cable plans and designs, specification schedules

Industry standards

May include: enterprise codes of practice, ACMA and Spectrum Management Authority standards, Manufacturer's specifications

Manufacturers' specifications

May be found in printed instruction leaflets or pre-printed on materials or on product packaging

Safe working practices

Include the safe use and handling of: tools and equipment, materials, chemicals and work platforms

Tools

May be hand or power tools and include: coring, stripping, torque spanner, stripping and preparation tool, crimping, connector gauges

Work platforms

May be: ladders, elevated platform vehicles

Relevant legislation, codes, regulations and standards may include:

AS Communications Cabling Manaul (CCM) Volume 1

ACIF Standards and Codes

ACMA Technical Standards

Australian building codes and regulations

Australian Standards

Enterprise Standards

Environmental Protection

Fire regulations

Heritage legislation

Industrial relations agreements including awards and enterprise

International Standards

Local Government

Manufacturer's enterprise operating policy and procedures

National Code

Occupational Health and Safety Act

Other services and utilities codes of practice and standards (electricity, water, gas)

Power company requirements

Privacy Act

Spectrum Management Authority

Statutory requirements

Trade Practices Act

Traditional land owners