NTISthis.com

Evidence Guide: ICTTCR201 - Use rigging practices and systems on telecommunications network structures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTTCR201 - Use rigging practices and systems on telecommunications network structures

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare rigging systems

  1. Prepare for work according to relevant legislation, codes, regulations and standards
  2. Arrange access to site and confirm client requirements
  3. Inform appropriate personnel of existing and potential site hazards
  4. Select tools and safety equipment required for safe rigging practice
  5. Use rigging systems in telecommunications environment according to specifications
  6. Identify proposed position of equipment to be mounted on telecommunications radio structures according to specifications and industry practice
  7. Estimate safe working loads for rigging systems and equipment according to specifications
  8. Select and inspect rigging equipment to ensure it is fit for purpose according to specifications
Prepare for work according to relevant legislation, codes, regulations and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange access to site and confirm client requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inform appropriate personnel of existing and potential site hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools and safety equipment required for safe rigging practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use rigging systems in telecommunications environment according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify proposed position of equipment to be mounted on telecommunications radio structures according to specifications and industry practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate safe working loads for rigging systems and equipment according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and inspect rigging equipment to ensure it is fit for purpose according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up and carry out rigging work on telecommunications radio structures

  1. Set up rigging and dogging equipment following safe working practices and procedures according to all relevant work health and safety (WHS) legislation
  2. Operate rigging equipment and install telecommunications antenna and associated equipment according to specifications
  3. Use internationally recognised communication signals and protocols with crane drivers and helicopter crews according to the Crane Association Crane Safety Manual for Operators/Users
Set up rigging and dogging equipment following safe working practices and procedures according to all relevant work health and safety (WHS) legislation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate rigging equipment and install telecommunications antenna and associated equipment according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use internationally recognised communication signals and protocols with crane drivers and helicopter crews according to the Crane Association Crane Safety Manual for Operators/Users

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

De-rig and complete documentation

  1. De-rig and lower rigging equipment according to specifications
  2. Restore site to client expectations following completion of installation according to industry practice
  3. Complete documentation and notify client for sign off
De-rig and lower rigging equipment according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore site to client expectations following completion of installation according to industry practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation and notify client for sign off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare rigging systems

1.1 Prepare for work according to relevant legislation, codes, regulations and standards

1.2 Arrange access to site and confirm client requirements

1.3 Inform appropriate personnel of existing and potential site hazards

1.4 Select tools and safety equipment required for safe rigging practice

1.5 Use rigging systems in telecommunications environment according to specifications

1.6 Identify proposed position of equipment to be mounted on telecommunications radio structures according to specifications and industry practice

1.7 Estimate safe working loads for rigging systems and equipment according to specifications

1.8 Select and inspect rigging equipment to ensure it is fit for purpose according to specifications

2. Set up and carry out rigging work on telecommunications radio structures

2.1 Set up rigging and dogging equipment following safe working practices and procedures according to all relevant work health and safety (WHS) legislation

2.2 Operate rigging equipment and install telecommunications antenna and associated equipment according to specifications

2.3 Use internationally recognised communication signals and protocols with crane drivers and helicopter crews according to the Crane Association Crane Safety Manual for Operators/Users

3. De-rig and complete documentation

3.1 De-rig and lower rigging equipment according to specifications

3.2 Restore site to client expectations following completion of installation according to industry practice

3.3 Complete documentation and notify client for sign off

Required Skills and Knowledge

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare rigging systems

1.1 Prepare for work according to relevant legislation, codes, regulations and standards

1.2 Arrange access to site and confirm client requirements

1.3 Inform appropriate personnel of existing and potential site hazards

1.4 Select tools and safety equipment required for safe rigging practice

1.5 Use rigging systems in telecommunications environment according to specifications

1.6 Identify proposed position of equipment to be mounted on telecommunications radio structures according to specifications and industry practice

1.7 Estimate safe working loads for rigging systems and equipment according to specifications

1.8 Select and inspect rigging equipment to ensure it is fit for purpose according to specifications

2. Set up and carry out rigging work on telecommunications radio structures

2.1 Set up rigging and dogging equipment following safe working practices and procedures according to all relevant work health and safety (WHS) legislation

2.2 Operate rigging equipment and install telecommunications antenna and associated equipment according to specifications

2.3 Use internationally recognised communication signals and protocols with crane drivers and helicopter crews according to the Crane Association Crane Safety Manual for Operators/Users

3. De-rig and complete documentation

3.1 De-rig and lower rigging equipment according to specifications

3.2 Restore site to client expectations following completion of installation according to industry practice

3.3 Complete documentation and notify client for sign off

Evidence of the ability to:

apply work health and safety (WHS) requirements and work practices associated with rigging

carry out basic dogging skills

carry out basic rigging skills

use specialised hand or power tools and equipment normally used in rigging.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline the features and operating requirements of rigging equipment

explain hypothermia symptoms and methods of prevention and treatment

discuss licensing and regulatory issues applying to rigging practices and systems on telecommunications radio structures

summarise knowledge of meteorology and weather prediction

describe remote-area first aid

explain:

electromagnetic radiation (EMR) safety practices

optical fibre-cabling and equipment safety practices

personal protective equipment for rigging projects

requirements of WHS legislation, relevant regulations, and applicable site and company WHS procedures

rigging practices and systems to telecommunications radio structures

working-at-heights safety practices.