NTISthis.com

Evidence Guide: ICTTEN428 - Prepare design drawings and specification for telecommunications installations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTTEN428 - Prepare design drawings and specification for telecommunications installations

What evidence can you provide to prove your understanding of each of the following citeria?

Gather information on existing and proposed installation

  1. Confirm equipment installation requirements from the design brief and client
  2. Inspect site to confirm plans where possible
  3. Review existing plans, drawings and databases against the design brief
Confirm equipment installation requirements from the design brief and client

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect site to confirm plans where possible

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review existing plans, drawings and databases against the design brief

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine installation options

  1. Assess available installation options against client requirements and relevant legislation, codes, regulations and standards
  2. 2.2 Establish and assess cost of options against client's budget
  3. Select most suitable option based on function, cost, standards and client deployment rules
Assess available installation options against client requirements and relevant legislation, codes, regulations and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

2.2 Establish and assess cost of options against client's budget

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select most suitable option based on function, cost, standards and client deployment rules

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare suitable drawings

  1. Prepare clear and accurate installation drawings indicating proposed facilities and services
  2. Provide drawings to relevant parties and file copies for later reference according to company policies
Prepare clear and accurate installation drawings indicating proposed facilities and services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide drawings to relevant parties and file copies for later reference according to company policies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare project specifications

  1. Prepare detailed design drawings for network installation
  2. Prepare drawings to include scheduled and non-scheduled codes to facilitate costing
Prepare detailed design drawings for network installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare drawings to include scheduled and non-scheduled codes to facilitate costing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify specifications with client

  1. Verify prepared documentation with client
  2. Obtain authorisation and approval from client to proceed according to company policy
  3. Issue design to the field with authority to construct
Verify prepared documentation with client

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain authorisation and approval from client to proceed according to company policy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Issue design to the field with authority to construct

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Gather information on existing and proposed installation

1.1 Confirm equipment installation requirements from the design brief and client

1.2 Inspect site to confirm plans where possible

1.3 Review existing plans, drawings and databases against the design brief

2. Determine installation options

2.1 Assess available installation options against client requirements and relevant legislation, codes, regulations and standards

2.2 Establish and assess cost of options against client's budget

2.3 Select most suitable option based on function, cost, standards and client deployment rules

3. Prepare suitable drawings

3.1 Prepare clear and accurate installation drawings indicating proposed facilities and services

3.2 Provide drawings to relevant parties and file copies for later reference according to company policies

4. Prepare project specifications

4.1 Prepare detailed design drawings for network installation

4.2 Prepare drawings to include scheduled and non-scheduled codes to facilitate costing

5. Verify specifications with client

5.1 Verify prepared documentation with client

5.2 Obtain authorisation and approval from client to proceed according to company policy

5.3 Issue design to the field with authority to construct

Required Skills and Knowledge

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Gather information on existing and proposed installation

1.1 Confirm equipment installation requirements from the design brief and client

1.2 Inspect site to confirm plans where possible

1.3 Review existing plans, drawings and databases against the design brief

2. Determine installation options

2.1 Assess available installation options against client requirements and relevant legislation, codes, regulations and standards

2.2 Establish and assess cost of options against client's budget

2.3 Select most suitable option based on function, cost, standards and client deployment rules

3. Prepare suitable drawings

3.1 Prepare clear and accurate installation drawings indicating proposed facilities and services

3.2 Provide drawings to relevant parties and file copies for later reference according to company policies

4. Prepare project specifications

4.1 Prepare detailed design drawings for network installation

4.2 Prepare drawings to include scheduled and non-scheduled codes to facilitate costing

5. Verify specifications with client

5.1 Verify prepared documentation with client

5.2 Obtain authorisation and approval from client to proceed according to company policy

5.3 Issue design to the field with authority to construct

Evidence of ability to:

determine installation options

produce schematics and plan drawings

access and interpret database and knowledge systems for network information

produce design drawings and specifications

verify specifications with client.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

summarise carrier network practices, procedures and systems, including databases and deployment rules relating to telecommunications designs

identify and apply legislation, codes of practice and other formal agreements (including schedule of rates and contract requirements) that impact work activity

describe manufacturer's requirements for safe operation of equipment

identify and document specific work health and safety (WHS) requirements relating to the activity and site conditions

describe typical issues and challenges that occur on site

establish and describe the various components of telecommunications plans, drawings and specifications.