Evidence Guide: LGAWORK208A - Perform field support duties in the construction and maintenance of water reticulation systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

LGAWORK208A - Perform field support duties in the construction and maintenance of water reticulation systems

What evidence can you provide to prove your understanding of each of the following citeria?

Establish site for water reticulation system's maintenance or construction

  1. Work is planned and programmed to be undertaken in accordance with drawings, specifications and other documentation.
  2. Work site is prepared and maintained in safe condition and in accordance with the occupational health and safety (OHS) requirements and regulations of other relevant authorities.
  3. Work is assigned to appropriate accredited personnel or gangs to meet reticulated water service's job requirements.
  4. Traffic control is planned at the work site and is signed in accordance with the regulations of various authorities and the Australian standards Manual of Traffic Control Devices.
  5. Underground and overhead obstructions, hazards and other utility services are located.
Work is planned and programmed to be undertaken in accordance with drawings, specifications and other documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is prepared and maintained in safe condition and in accordance with the occupational health and safety (OHS) requirements and regulations of other relevant authorities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is assigned to appropriate accredited personnel or gangs to meet reticulated water service's job requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Traffic control is planned at the work site and is signed in accordance with the regulations of various authorities and the Australian standards Manual of Traffic Control Devices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Underground and overhead obstructions, hazards and other utility services are located.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out reticulated water service maintenance

  1. Condition of the water-reticulated system is monitored, tested, sampled and reported on.
  2. Water quality problems identified by tests are responded to.
  3. Correct water reticulated service is located and identified.
  4. Defective components or pipeline are repaired, replaced or serviced as required.
  5. Functional pressure/non-pressure tests of items are carried out.
  6. Water reticulation pipes and equipment are cleaned and disinfected with all wastewater being disposed of appropriately.
  7. Service is reinstated after maintenance work has been passed at final inspection.
Condition of the water-reticulated system is monitored, tested, sampled and reported on.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Water quality problems identified by tests are responded to.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct water reticulated service is located and identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Defective components or pipeline are repaired, replaced or serviced as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Functional pressure/non-pressure tests of items are carried out.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Water reticulation pipes and equipment are cleaned and disinfected with all wastewater being disposed of appropriately.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Service is reinstated after maintenance work has been passed at final inspection.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate trenches

  1. Appropriate drainage is provided for the diversion of all uncontaminated water from the site and silt traps are set up as required to prevent damage to the environment.
  2. Environmental protection devices are installed as required to meet environmental regulations.
  3. Levels and lines of works are set out according to the drawings.
  4. Excavation plant is selected according to requirements.
  5. Trenches are excavated to depth and grade as shown on plans, and shoring or shields are installed or trenches are battered back according to OHS requirements.
  6. Pressure and other tests are completed as specified.
  7. Trenches are backfilled with selected materials , compacted in layers and surface is finished according to specifications.
Appropriate drainage is provided for the diversion of all uncontaminated water from the site and silt traps are set up as required to prevent damage to the environment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental protection devices are installed as required to meet environmental regulations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Levels and lines of works are set out according to the drawings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavation plant is selected according to requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trenches are excavated to depth and grade as shown on plans, and shoring or shields are installed or trenches are battered back according to OHS requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pressure and other tests are completed as specified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trenches are backfilled with selected materials , compacted in layers and surface is finished according to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out construction of water reticulation service

  1. Trench bottom is prepared and pipe bedding is laid to specifications in accordance with the drawings.
  2. Pipes are placed and valves, fittings and flow control devices are fitted in accordance with the drawings and specifications.
  3. Water service is disinfected and functional tests of items are carried out.
  4. Water system is placed in service and the performance of the water reticulation system is monitored.
  5. Valve chambers, minor structures and thrust blocks are constructed.
Trench bottom is prepared and pipe bedding is laid to specifications in accordance with the drawings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pipes are placed and valves, fittings and flow control devices are fitted in accordance with the drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Water service is disinfected and functional tests of items are carried out.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Water system is placed in service and the performance of the water reticulation system is monitored.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Valve chambers, minor structures and thrust blocks are constructed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete necessary documentation

  1. Construction and maintenance reports are completed and filed to meet council's requirements.
  2. The as constructed plans and drawings are completed in accordance with completed works.
Construction and maintenance reports are completed and filed to meet council's requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The as constructed plans and drawings are completed in accordance with completed works.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Overview of assessment requirements

A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated.

Critical aspects of evidence to be considered

Appropriate materials, pipes and components, construction methods and processes are used for the efficient maintenance and construction of water reticulation and sewerage collection systems.

Plans and specifications are adhered to.

Safety on work sites is ensured.

Australian standards, codes of practice and advisory standards are met.

Context of assessment

Appropriate materials, pipes and components, construction methods and processes are used for the efficient maintenance and construction of water reticulation and sewerage collection systems.

Plans and specifications are adhered to.

Safety on work sites is ensured.

Australian standards, codes of practice and advisory standards are met.

Relationship to other units(prerequisite or co-requisite units)

To enable holistic assessment this unit may be assessed with other units that form part of the job role.

Method of assessment

The following assessment methods are suggested:

observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies

written and/or oral questioning to assess knowledge and understanding

completion of workplace documentation

third-party reports from experienced practitioners

completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor

Evidence required for demonstration of consistent performance

Evidence will need to be gathered over time across a range of variables.

Resource implications

In accordance with a range of variable requirements.

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit

Required Skills

reading and interpreting plans and specifications, and plant and equipment capabilities

measuring and calculating quantities

measurement and methods of setting out

trade-specific skills

Required Knowledge

OHS requirements

construction and maintenance practices related to water distribution systems

pipe materials and components technology

work scheduling, inspection, testing and monitoring

work site traffic management

monitoring and testing methods and procedures

state and local environmental requirements

Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Plant may include:

excavators

backhoes

trench excavators

trench compactors

trucks

loaders

cranes

Trench support systems may include:

timber struts

wales and runners

steel trench sheets

box shields

poling boards

trucking frames

Materials may include:

concrete

steel

clay

sand

rock

crushed rock

geofabric cloth

plastics

Types of pipes may include:

steel pipes

lined steel pipes

cast and ductile iron pipes

reinforced and unreinforced concrete pipes

polyvinyl chloride (PVC) pipes

fibre reinforced concrete (FRC) pipes

copper pipes

Types of pipe joints may include:

cast iron: flanged, flexible, sleeve, bell and spigot joints

steel: butt and spigot and socket welded joints, and flanged joints

Viking Johnson coupling

PVC: insert fitting and flared compression rubber gasket joints

FRC: gibault, machined and rubber joints

concrete pipes: socket mortar, socket mastic and socket rubber ring

Types of valves, meters and components may include:

stop valves, non-return valves, flow control valves, pressure control valves, energy dissipaters and air release valves

venturi and orifice meters, inferential propeller blade or vane meters, and waste and leak detection meters

Disinfectant methods may include:

continuous feed

slug

foam swabs

pigs

flushing

Pipe tests may include:

pressure

leakage

water quality

compaction

confined spaces

Structures may include:

pump stations

valve chambers

inspection chambers

thrust blocks

pipe supports