The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Establish site for water reticulation system's maintenance or construction
|
|
Work is planned and programmed to be undertaken in accordance with drawings, specifications and other documentation. Completed |
Evidence:
|
Work site is prepared and maintained in safe condition and in accordance with the occupational health and safety (OHS) requirements and regulations of other relevant authorities. Completed |
Evidence:
|
Work is assigned to appropriate accredited personnel or gangs to meet reticulated water service's job requirements. Completed |
Evidence:
|
Traffic control is planned at the work site and is signed in accordance with the regulations of various authorities and the Australian standards Manual of Traffic Control Devices. Completed |
Evidence:
|
Underground and overhead obstructions, hazards and other utility services are located. Completed |
Evidence:
|
Carry out reticulated water service maintenance
|
|
Condition of the water-reticulated system is monitored, tested, sampled and reported on. Completed |
Evidence:
|
Water quality problems identified by tests are responded to. Completed |
Evidence:
|
Correct water reticulated service is located and identified. Completed |
Evidence:
|
Defective components or pipeline are repaired, replaced or serviced as required. Completed |
Evidence:
|
Functional pressure/non-pressure tests of items are carried out. Completed |
Evidence:
|
Water reticulation pipes and equipment are cleaned and disinfected with all wastewater being disposed of appropriately. Completed |
Evidence:
|
Service is reinstated after maintenance work has been passed at final inspection. Completed |
Evidence:
|
Excavate trenches
|
|
Appropriate drainage is provided for the diversion of all uncontaminated water from the site and silt traps are set up as required to prevent damage to the environment. Completed |
Evidence:
|
Environmental protection devices are installed as required to meet environmental regulations. Completed |
Evidence:
|
Levels and lines of works are set out according to the drawings. Completed |
Evidence:
|
Excavation plant is selected according to requirements. Completed |
Evidence:
|
Trenches are excavated to depth and grade as shown on plans, and shoring or shields are installed or trenches are battered back according to OHS requirements. Completed |
Evidence:
|
Pressure and other tests are completed as specified. Completed |
Evidence:
|
Trenches are backfilled with selected materials , compacted in layers and surface is finished according to specifications. Completed |
Evidence:
|
Carry out construction of water reticulation service
|
|
Trench bottom is prepared and pipe bedding is laid to specifications in accordance with the drawings. Completed |
Evidence:
|
Pipes are placed and valves, fittings and flow control devices are fitted in accordance with the drawings and specifications. Completed |
Evidence:
|
Water service is disinfected and functional tests of items are carried out. Completed |
Evidence:
|
Water system is placed in service and the performance of the water reticulation system is monitored. Completed |
Evidence:
|
Valve chambers, minor structures and thrust blocks are constructed. Completed |
Evidence:
|
Complete necessary documentation
|
|
Construction and maintenance reports are completed and filed to meet council's requirements. Completed |
Evidence:
|
The as constructed plans and drawings are completed in accordance with completed works. Completed |
Evidence:
|