The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Establish facilities for concrete construction
|
|
Work is planned and programmed to be undertaken in accordance with drawings, specifications and other documentation. Completed |
Evidence:
|
Work site is prepared and maintained in a safe condition in accordance with the occupational health and safety requirements (OHS) and regulations of other accredited authorities. Completed |
Evidence:
|
Traffic control is signed in accordance with relevant Australian standards . Completed |
Evidence:
|
Underground and overhead obstructions and other utility services are identified. Completed |
Evidence:
|
Environmental protection devices are installed as required to meet environmental regulations. Completed |
Evidence:
|
Carry out basic concreting operations
|
|
Aggregates and cement are handled to maintain quality of materials . Completed |
Evidence:
|
Concrete components are mixed and batched to achieve specified requirements. Completed |
Evidence:
|
Correct concreting tools and equipment are selected for specific operators to achieve the specified finish. Completed |
Evidence:
|
Concrete is transported, placed and finished. Completed |
Evidence:
|
Correct materials for expansion joints and installation are selected in accordance with the manufacturers' instructions and/or drawings. Completed |
Evidence:
|
Pre-cast sections are installed in accordance with specifications. Completed |
Evidence:
|
Select and install steel reinforcing when required
|
|
Correct reinforcement is selected and installed when required or as shown in the drawings. Completed |
Evidence:
|
Set up formwork and falsework when required
|
|
Materials for formwork and falsework are selected. Completed |
Evidence:
|
Approved procedures and methods for erection and dismantling of falsework are followed. Completed |
Evidence:
|
Approved procedures and methods for erection and dismantling of formwork are followed. Completed |
Evidence:
|
Maintain records of concrete structures
|
|
Information is recorded in accordance with council and legislative requirements. Completed |
Evidence:
|
Details are recorded clearly, accurately and legibly. Completed |
Evidence:
|
Records are secured, accessible and up to date. Completed |
Evidence:
|