Evidence Guide: LGAWORK304A - Construct and maintain drainage systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

LGAWORK304A - Construct and maintain drainage systems

What evidence can you provide to prove your understanding of each of the following citeria?

Establish area for drainage works

  1. Tools and safety equipment requirements are identified and obtained, and lines and levels are set up according to plan.
  2. Lines and levels are set up according to plan.
  3. Excavation is undertaken according to plan.
  4. Excavation is secured to prevent injury to the public and workers.
  5. Appropriate drainage is provided to allow for the diversion of uncontaminated stormwater from the work site and to prevent environmental damage.
  6. Environmental protection devices are installed as required to meet requirements.
  7. Formwork or shoring is provided where required.
  8. Work is planned and undertaken in accordance with occupational health and safety (OHS) and traffic control requirements.
Tools and safety equipment requirements are identified and obtained, and lines and levels are set up according to plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lines and levels are set up according to plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavation is undertaken according to plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavation is secured to prevent injury to the public and workers.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate drainage is provided to allow for the diversion of uncontaminated stormwater from the work site and to prevent environmental damage.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental protection devices are installed as required to meet requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Formwork or shoring is provided where required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is planned and undertaken in accordance with occupational health and safety (OHS) and traffic control requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct or restore ground drainage

  1. Pre-bedding is laid to specifications.
  2. Pre-cast or moulded structures are placed to specifications.
Pre-bedding is laid to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-cast or moulded structures are placed to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct or restore surface drains

  1. Surface drains are prepared and levelled according to plan.
  2. Earth and rubble drains are constructed to plan.
Surface drains are prepared and levelled according to plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Earth and rubble drains are constructed to plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain drainage systems

  1. Surface drains are inspected and cleared of weeds and debris.
  2. Subsoil drainage systems are flushed and cleaned.
  3. Culverts are cleared of debris, cleaned and if necessary reinstated.
  4. Drains, access holes, pits and traps are cleaned and repaired and if necessary reinstated.
  5. Pipes are rehabilitated using proprietary rehabilitation systems.
Surface drains are inspected and cleared of weeds and debris.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Subsoil drainage systems are flushed and cleaned.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Culverts are cleared of debris, cleaned and if necessary reinstated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drains, access holes, pits and traps are cleaned and repaired and if necessary reinstated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pipes are rehabilitated using proprietary rehabilitation systems.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rehabilitate works area

  1. Verges and medians are surfaced and planted or turfed according to specifications.
  2. Site is restored to required condition.
  3. Private and public property structures are reinstated.
Verges and medians are surfaced and planted or turfed according to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is restored to required condition.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Private and public property structures are reinstated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete necessary documentation

  1. Construction and maintenance reports are completed and filed to meet council's requirements.
  2. The as constructed plans and drawings are completed in accordance with completed works.
Construction and maintenance reports are completed and filed to meet council's requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The as constructed plans and drawings are completed in accordance with completed works.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Overview of assessment requirements

A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated.

Critical aspects of evidence to be considered

Appropriate materials are selected for the construction and maintenance of the works.

Appropriate construction methods and processes are used.

Plans and specifications are adhered to.

Safety on work site is ensured.

Australian standards are met.

Context of assessment

May be assessed:

on the job

simulated workplace environment

written assignment

short-answer test

oral questioning

observation

or any combination of the above

Relationship to other units(prerequisite or co-requisite units)

To enable holistic assessment this unit may be assessed with other units that form part of the job role.

Method of assessment

The following assessment methods are suggested:

observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies

written and/or oral questioning to assess knowledge and understanding

completion of workplace documentation

third-party reports from experienced practitioners

completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor

Evidence required for demonstration of consistent performance

Evidence will need to be gathered over time across a range of variables.

Resource implications

In accordance with a range of variable requirements.

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit

Required Skills

reading and interpreting plans and specifications, and plant and equipment capabilities

measuring and calculating quantities

Required Knowledge

OHS requirements

work site traffic management

materials technology related to drainage systems

appropriate drainage options

work scheduling, inspection and testing

working in a team

state and local environmental requirements

Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Pipeline rehabilitation may include:

folded and formed liners

cured in-place resin liners

spiral wound liners

slip liners

pipe grouting machines

Drainage systems may include:

above and in-ground stormwater

wastewater

fittings

culverts

traps

drains

access holes

geofabric strip drains and cloth

Pipe types may include:

concrete

polyvinyl chloride (PVC)

steel and fibre concrete

corrugated PVC and steel pipes

recycled plastics

Relevant standards may include:

Australian standards and other relevant standards