The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Divert or drain water from the work site
|
|
Appropriate drainage is provided to allow for the diversion of water from the work site and to minimise damage to the environment. Completed |
Evidence:
|
Safe and appropriate methods are used to pump or drain contaminated stormwater from excavations to prevent damage to the environment. Completed |
Evidence:
|
Environmental protection devices are installed to meet environmental regulations. Completed |
Evidence:
|
Work is planned and undertaken in accordance with occupational health and safety (OHS) and traffic control requirements. Completed |
Evidence:
|
Construct or maintain concrete structures
|
|
Excavation work, formwork and concrete reinforcement are set out according to plans and specifications. Completed |
Evidence:
|
Concrete and reinforced steel are placed and finished in accordance with specifications and relevant standards . Completed |
Evidence:
|
Pre-cast concrete sections are removed or installed in accordance with specifications. Completed |
Evidence:
|
Pre-stressing of concrete is undertaken in accordance with approved practice. Completed |
Evidence:
|
Appropriate maintenance methods are used and works are undertaken as specified. Completed |
Evidence:
|
Reinstate or landscape works area
|
|
Edges, shoulders and potholes are patched or repaired. Completed |
Evidence:
|
Pavement is profiled and resealed and material is recycled as appropriate. Completed |
Evidence:
|
Landscape works are carried out as required. Completed |
Evidence:
|
Maintain records
|
|
Information is recorded in accordance with council and legislative requirements. Completed |
Evidence:
|
Details are recorded clearly, accurately and legibly. Completed |
Evidence:
|
Records are secured, made accessible and kept up to date. Completed |
Evidence:
|