The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for installation
|
|
Applicable legislative, OHS and organisational requirements relevant to installing unpatterned tufted and bonded carpet to stairways are verified and complied with Completed |
Evidence:
|
Instructions and/or plans are read and interpreted to identify the process required to complete work tasks Completed |
Evidence:
|
Floor condition is assessed for suitability for installation of unpatterned tufted and bonded carpet Completed |
Evidence:
|
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition Completed |
Evidence:
|
Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation Completed |
Evidence:
|
Set out materials
|
|
Carpet to be installed is checked against order Completed |
Evidence:
|
Tufted and bonded carpets are acclimatised according to manufacturer recommendations Completed |
Evidence:
|
Stairway or step is measured and the required amount of floor covering, and underlay including allowances for type of stairs, is calculated and obtained Completed |
Evidence:
|
Suitable adhesives, gripper strips and edge strips are selected Completed |
Evidence:
|
Gripper strips are cut and installed as specified in AS/NZS2455.1.1995 Completed |
Evidence:
|
Underlay is checked against specified type and fitted as specified in AS/NZS2455.1.1995 Completed |
Evidence:
|
Lay floor coverings
|
|
Instructions and sequence for laying and fixing are followed Completed |
Evidence:
|
Carpet floor coverings are laid out to meet allowances for type of stair requirements and minimise waste Completed |
Evidence:
|
Carpet floor coverings are accurately and clearly marked for cutting Completed |
Evidence:
|
Carpet floor coverings are cut to required shape with minimum waste of materials and laid Completed |
Evidence:
|
Instructions, sequence, fixing methods and equipment are used following specifications and Australian Standards AS/NZS2455.1.1995 Completed |
Evidence:
|
Installation is completed to specification Completed |
Evidence:
|
Finished stairway is checked for flaws in installation and materials and faults rectified Completed |
Evidence:
|
Complete housekeeping
|
|
Unused materials are stored or recycled as required Completed |
Evidence:
|
Tools and equipment are cleaned and stored appropriately Completed |
Evidence:
|
Work area is cleaned and rubbish disposed of appropriately Completed |
Evidence:
|
Workplace documentation and/or reports are completed Completed |
Evidence:
|