The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work
|
|
Applicable legislative, OHS and organisational requirements relevant to the fitting and fixing timber and metal mouldings and trims to timber and engineered flooring are verified and complied with Completed |
Evidence:
|
Instructions and/or plans are read and interpreted to identify process required to complete work tasks Completed |
Evidence:
|
Finished timber/engineered flooring condition is assessed for suitability for installation of timber and metal mouldings and trims consistent with Australian Standards, industry standards and manufacturer recommendations Completed |
Evidence:
|
Suitable adhesives, mouldings, trims and fixings are selected as required. Completed |
Evidence:
|
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition Completed |
Evidence:
|
Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation Completed |
Evidence:
|
Set out materials for installation
|
|
Timber or metal mouldings and trims are acclimatised according to manufacturer recommendations Completed |
Evidence:
|
Timber or metal mouldings and trims for fixing are organised and used in accordance with relevant safety management requirements Completed |
Evidence:
|
Adhesives and fixings, are prepared for use as required Completed |
Evidence:
|
Working lines and starting point are established Completed |
Evidence:
|
Cut mouldings/trims
|
|
Instructions and sequence for cutting and fixing are followed Completed |
Evidence:
|
Timber or metal mouldings and trims are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate Completed |
Evidence:
|
The aesthetics of the materials are maximised where appropriate, matching grains and colours Completed |
Evidence:
|
Timber or metal moulding and trim materials are accurately and clearly marked for cutting Completed |
Evidence:
|
Timber or metal moulding and trim is cut to length and size for final fixing ensuring minimum waste Completed |
Evidence:
|
Fix mouldings /trims
|
|
Timber or metal mouldings and trims for fixing are organised and used in accordance with relevant safety management requirements Completed |
Evidence:
|
Adhesives, mechanical fixings and accessories are prepared for use as required Completed |
Evidence:
|
Fixing methods and equipment are used following manufacturer recommendations Completed |
Evidence:
|
Skirting boards/mouldings are fitted to perimeter walls expansion joints are allowed Completed |
Evidence:
|
Cover trims and edge strips are fitted/re-fitted to expansion joints and transitions of the timber flooring Completed |
Evidence:
|
Finished job is inspected and any imperfections are rectified following workplace procedures Completed |
Evidence:
|
Complete housekeeping
|
|
Unused materials are stored or recycled as required Completed |
Evidence:
|
Tools and equipment are cleaned and stored appropriately Completed |
Evidence:
|
Work area is cleaned and rubbish disposed of appropriately Completed |
Evidence:
|
Workplace documentation is completed Completed |
Evidence:
|