The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for installation
|
|
Applicable legislative, OHS and organisational requirements relevant to installing resilient wall coverings are verified and complied with Completed |
Evidence:
|
Instructions and/or plans are read and interpreted to identify process required to complete work tasks Completed |
Evidence:
|
Sub-strate condition is assessed for suitability for installation of resilient coverings to the walls Completed |
Evidence:
|
Suitable adhesives, trims and accessories are selected Completed |
Evidence:
|
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition Completed |
Evidence:
|
Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation Completed |
Evidence:
|
Set-out floor coverings
|
|
Resilient wall covering to be installed is checked against order Completed |
Evidence:
|
Resilient wall coverings are acclimatised according to manufacturer recommendations Completed |
Evidence:
|
Resilient wall coverings for fixing are organised and used in accordance with relevant safety management requirements Completed |
Evidence:
|
Working lines and starting point are established Completed |
Evidence:
|
Pre-form fillet is cut and fitted (if required) Completed |
Evidence:
|
Feathering systems and applications are prepared and applied in accordance with the installation plan Completed |
Evidence:
|
Install resilient sheet
|
|
Resilient wall coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate Completed |
Evidence:
|
The aesthetics of the materials is maximised where appropriate, matching grains, colours and patterns Completed |
Evidence:
|
Materials are cut to length and size, allowing for final adjustment, trimming and welding processes Completed |
Evidence:
|
Header and/or perimeter contact adhesive is applied to surfaces Completed |
Evidence:
|
Adhesive is applied to the body of the walls as specified by the adhesive manufacturer Completed |
Evidence:
|
Resilient wall covering is positioned in accordance with the plan, pressed out and hand-rolled Completed |
Evidence:
|
Resilient wall covering is heated to form required profiles Completed |
Evidence:
|
Seams are prepared and welded in accordance with the plan, manufacturer instructions and industry standards Completed |
Evidence:
|
Joins and/or seams are trimmed and finished to industry standards Completed |
Evidence:
|
Resilient wall coverings are sealed to floor coverings, door and window frames, as well as fixtures and fittings in wet area installations Completed |
Evidence:
|
Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures Completed |
Evidence:
|
Complete housekeeping
|
|
Unused materials are stored or recycled as required Completed |
Evidence:
|
Tools and equipment are cleaned and stored appropriately Completed |
Evidence:
|
Work area is cleaned and rubbish disposed of appropriately Completed |
Evidence:
|
Workplace documentation and/or reports are completed Completed |
Evidence:
|