The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work
|
|
Applicable legislative, OHS and organisational requirements relevant to the installation of mosaic parquetry are verified and complied with Completed |
Evidence:
|
Workplace health and safety requirements, including personal protection needs, are observed throughout the work Completed |
Evidence:
|
Instructions and/or plans are read and interpreted to identify process required to complete work tasks Completed |
Evidence:
|
Sub-floor condition is assessed for suitability for installation of mosaic parquetry flooring consistent with Australian Standards, industry standards and manufacturer recommendations Completed |
Evidence:
|
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition Completed |
Evidence:
|
Skirting boards or cover trims are removed or undercut if required and stored for refitting Completed |
Evidence:
|
Sequence of work is planned, including start point, to ensure efficiency and quality of installation Completed |
Evidence:
|
Set out mosaic parquetry flooring
|
|
Mosaic parquetry flooring are acclimatised according to manufacturer recommendations Completed |
Evidence:
|
Mosaic parquetry flooring for fixing are organised and used in accordance with relevant safety management requirements Completed |
Evidence:
|
Adhesives and edge strips are prepared for use as required Completed |
Evidence:
|
Area to be covered is measured, working lines and starting point are established Completed |
Evidence:
|
Layout and cut parquetry mosaic fingers
|
|
Instructions and sequence for laying and fixing are followed Completed |
Evidence:
|
Appropriate underlay is laid according to manufacturers' recommendations Completed |
Evidence:
|
Mosaic parquetry flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins Completed |
Evidence:
|
The aesthetics of the materials are maximised including matching grains and colours Completed |
Evidence:
|
Parquetry mosaic fingers are accurately and clearly marked for cutting Completed |
Evidence:
|
Parquetry mosaic fingers are cut where required to provide appropriate size and shape ensuring minimum waste Completed |
Evidence:
|
Install mosaic parquetry
|
|
Adhesives and edge strips/accessories are prepared for use as required Completed |
Evidence:
|
Adhesives are used following workplace procedures Completed |
Evidence:
|
Fixing methods and equipment are used following manufacturer recommendations Completed |
Evidence:
|
Parquetry is installed and fixed to produce required pattern Completed |
Evidence:
|
Appropriate field and perimeter expansion joints are allowed Completed |
Evidence:
|
Skirting boards or cover trims are fitted/re-fitted and finished Completed |
Evidence:
|
Finished job is inspected and any imperfections are rectified following workplace procedures Completed |
Evidence:
|
Complete housekeeping
|
|
Off-cuts or leftover materials are collected and removed following workplace procedures Completed |
Evidence:
|
Tools and equipment are cleaned, maintained and stored Completed |
Evidence:
|
Work area is cleaned and waste material is removed and disposed of safely Completed |
Evidence:
|
Documentation/reporting is completed following workplace procedures Completed |
Evidence:
|