NTISthis.com

Evidence Guide: LMFFT5010B - Optimise CNC operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

LMFFT5010B - Optimise CNC operations

What evidence can you provide to prove your understanding of each of the following citeria?

Identify optimal operating conditions

  1. The production potential of the components of the system are identified
  2. Production orders and plans are analysed to identify sustained production requirements
  3. Integration options are identified and analysed to ascertain the optimal integration model
  4. Software and programming requirements to attain and sustain optimal integration are identified and recorded
The production potential of the components of the system are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Production orders and plans are analysed to identify sustained production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Integration options are identified and analysed to ascertain the optimal integration model

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Software and programming requirements to attain and sustain optimal integration are identified and recorded

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for software installation

  1. Program format and operational intent is accurately determined and required applications identified
  2. Specifications are checked for required operating conditions
  3. Program instructions are checked for compliance with specifications
  4. Software timers are set to specification where required
Program format and operational intent is accurately determined and required applications identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specifications are checked for required operating conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Program instructions are checked for compliance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Software timers are set to specification where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and integrate automatic process machine control programs

  1. Appropriate program loading technique is selected
  2. External loading devices are correctly connected to automatic process machine control systems
  3. Machine control system is placed in correct operational mode to accept program loading
  4. Program is downloaded in accordance with manufacturers' recommended procedure and enterprise requirements
  5. Checks are made during and after downloading to ensure accurate and complete data transfer
  6. External program loading devices and connections are disconnected from process and machine control system
  7. Integration protocols and actions are completed
Appropriate program loading technique is selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

External loading devices are correctly connected to automatic process machine control systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machine control system is placed in correct operational mode to accept program loading

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Program is downloaded in accordance with manufacturers' recommended procedure and enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Checks are made during and after downloading to ensure accurate and complete data transfer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

External program loading devices and connections are disconnected from process and machine control system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Integration protocols and actions are completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission automatic process and machine control programs

  1. Operation of the production system using the programs is observed
  2. Outputs are checked and measured for compliance with specifications
  3. External inputs are checked for compliance with specifications, according to specified procedures
  4. Total operation is checked for compliance with specifications where applicable
  5. Location of program master copy storage is confirmed
Operation of the production system using the programs is observed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Outputs are checked and measured for compliance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

External inputs are checked for compliance with specifications, according to specified procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Total operation is checked for compliance with specifications where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Location of program master copy storage is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects of evidence

Locate, interpret and apply relevant information

Apply safety requirements throughout the sequence, including the use of personal protective clothing and equipment

On a minimum of two occasions with at least one involving a CNC Machining and Processing Centre, optimise production, and

Suggest improvements to CNC controlled operations and where authorised, negotiate changes

Modify activities to cater for variations in workplace cultures and environment

Work effectively with others

Resource implications

CNC production equipments, software, production materials and a production plan/schedule

Method of assessment

Assessment methods must confirm consistency or the potential for consistency of performance over time and in a range of workplace relevant contexts.

Assessment should be by direct observation and questioning on underpinning knowledge.

Assessment may be conducted over time and may be in conjunction with assessment of other units of competency

Context of assessment

Assessment may occur on the job or in a workplace simulated facility with relevant process equipment, materials, work instructions and deadlines.

Required Skills and Knowledge

Required skills

collect, organise and understand information related to CNC production optimisation, including the relevant technical, regulatory, environmental and safety requirements

communicate ideas and information to enable clarification of the requirements, coordination of work with site managers, supervisors, and other workers, and the reporting of work outcomes and problems

plan and organise activities, including the obtaining of systems and materials to avoid any backtracking, workflow interruptions or unnecessary systems downtime

work with others and in a team by recognising dependencies and using cooperative approaches to optimise workflow and productivity

use mathematical ideas and techniques to correctly calculate flow and systems parameters

create and apply systematic problem solving techniques to anticipate problems, avoid re-working and wastage

use the full scope and potential workplace technology related to CNC production operations

Required knowledge

company operating procedures, including procedures for programming CNC equipment

operation requirements of equipment and work systems to be programmed

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Unit scope

This unit covers the work involved in optimising CNC process and machine control programs used in the furnishing industry. It requires the integration of process machines that may normally function on a stand-alone basis.

The optimisation of CNC programs is undertaken in accordance with established enterprise procedures and practices may include requirements recommended by manufacturers/developers

Production systems

Production systems are to include CNC machining and processing centres

Unit context

OHS requirements include legislation, building codes, material safety management systems, hazardous substances and dangerous goods codes and safe operating procedures

Work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, authorised handling procedures and organisation insurance requirements

Work requires individuals to demonstrate analytical and organisational ability, judgement and problem solving skills

Workplace environment

Work is generally performed without other qualified assistance

Customers are normally internal

Personal protective equipment

Personal protective equipment is to include that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures

Enterprise production plans and schedules

CNC and production systems manufacturers' specifications and instructions

Standard form of installing and commissioning CNC programs

Organisation work specifications and requirements

Legislation/regulations/national and industry codes and practices relevant to the installation and commissioning

Quality and Australian standards and procedures