The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan for work
|
|
Work requirements in the form of type of window or door to be fabricated and installed are identified from work instructions. This includes the identification of its pattern or plan Completed |
Evidence:
|
Workplace health and safety requirements for fabrication and installation of windows and doors including personal protection needs, are observed throughout the work Completed |
Evidence:
|
The process for fabricating and installing windows and doors is identified Completed |
Evidence:
|
Types and quantities of materials required are calculated from plans or work instructions or by measuring the fixture opening in accordance with Australian Standards and industry practice Completed |
Evidence:
|
Cutting lists are prepared from plans, work instructions or measurements of opening to suit the window or door to be installed Completed |
Evidence:
|
Fittings, fixings and joining devices or materials are selected in line with specifications or type of materials to be joined or fixed and Australian standards Completed |
Evidence:
|
Tools and equipment appropriate to the fixing method are identified Completed |
Evidence:
|
Prepare for work
|
|
Work sequence is determined in a logical order to suit the job Completed |
Evidence:
|
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition Completed |
Evidence:
|
Components of the window or door are checked against specifications or job order for: size, quantity, finish and profile Completed |
Evidence:
|
Fabricate and install window or door
|
|
Materials are measured and marked to cutting list requirements and most economical use of materials Completed |
Evidence:
|
Materials are cut to cutting list requirements in accordance with workplace procedures or industry practice Completed |
Evidence:
|
Components of window or door are assembled in accordance with recognised industry standards Completed |
Evidence:
|
Fittings are installed to window or door in accordance with workplace procedures or industry practice Completed |
Evidence:
|
Window or door is installed in opening using appropriate fixing method in accordance with recognised industry standard Completed |
Evidence:
|
Complete work
|
|
Installed window or door is inspected for quality of work and repaired, re-fabricated or re-installed as required in accordance with workplace procedures Completed |
Evidence:
|
Material which can be re-used is collected and stored Completed |
Evidence:
|
Waste and scrap material is removed for disposal or recycling as required Completed |
Evidence:
|
Work area is cleaned and rubbish disposed of as appropriate Completed |
Evidence:
|
Tools, equipment and unused materials are cleaned and removed and stored appropriately Completed |
Evidence:
|
Workplace documentation is completed in accordance with workplace requirements Completed |
Evidence:
|