NTISthis.com

Evidence Guide: MARB005 - Slip or dock a vessel and maintain hull on a vessel up to 80 metres

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MARB005 - Slip or dock a vessel and maintain hull on a vessel up to 80 metres

What evidence can you provide to prove your understanding of each of the following citeria?

Safely dock vessel into dry dock or slipway

  1. Slipway or dry dock particulars are assessed for suitability for dry docking or slipping vessel
  2. Ship supports, scaffolding and other service systems are assessed for compatibility to dry dock or slipway particulars
  3. Plan is prepared for docking or slipping vessel
  4. Cradle, supports and/or slings are prepared prior to slipping vessel
  5. Vessel is made ready for slipping according to organisational and dry dock requirements
  6. Vessel is slipped according to environmental safe work practices and safety instructions
Slipway or dry dock particulars are assessed for suitability for dry docking or slipping vessel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ship supports, scaffolding and other service systems are assessed for compatibility to dry dock or slipway particulars

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan is prepared for docking or slipping vessel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cradle, supports and/or slings are prepared prior to slipping vessel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vessel is made ready for slipping according to organisational and dry dock requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vessel is slipped according to environmental safe work practices and safety instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect underwater hull, equipment and fittings

  1. Checks of vessel hull, equipment and fittings are carried out according to maintenance schedules and vessel manufacturer instructions
  2. Deterioration in vessel structure, equipment and fittings is identified
  3. Checks on watertight integrity of vessel are carried out according to organisational procedures and safety regulations
  4. Damage to watertight integrity is identified and appropriate action is determined
  5. Listed work plan is prepared to rectify all identified faults
  6. Surveyor or authorised person is engaged to ensure appropriate certification can be issued or endorsed on completion of work, where applicable
Checks of vessel hull, equipment and fittings are carried out according to maintenance schedules and vessel manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Deterioration in vessel structure, equipment and fittings is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Checks on watertight integrity of vessel are carried out according to organisational procedures and safety regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Damage to watertight integrity is identified and appropriate action is determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Listed work plan is prepared to rectify all identified faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surveyor or authorised person is engaged to ensure appropriate certification can be issued or endorsed on completion of work, where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use maintenance equipment and materials

  1. Tools and equipment are correctly identified, selected and used
  2. Maintenance materials are obtained, prepared and used according to organisational procedures and manufacturer instructions
  3. Environmental procedures are followed and waste from cleaning and maintenance tasks is collected, treated and disposed of, or recycled, according to organisational procedures
  4. Malfunctions, faults, wear or damage to tools are reported according to organisational procedures
  5. Equipment and tools are cleaned, returned to operating order and stored according to organisational procedures and manufacturer instructions
  6. Chemicals are used and stored according to organisational procedures and manufacturer instructions
  7. Paint is used and stored according to organisational procedures and manufacturer instructions
Tools and equipment are correctly identified, selected and used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance materials are obtained, prepared and used according to organisational procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental procedures are followed and waste from cleaning and maintenance tasks is collected, treated and disposed of, or recycled, according to organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Malfunctions, faults, wear or damage to tools are reported according to organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and tools are cleaned, returned to operating order and stored according to organisational procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Chemicals are used and stored according to organisational procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Paint is used and stored according to organisational procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out required maintenance and repairs to hull, equipment and fittings

  1. Suitable personal protective clothing is selected and used according to work health and safety (WHS)/occupational health and safety (OHS) requirements
  2. Permits for hot work, confined space entry and other high risk activities are completed according to organisational and regulatory requirements
  3. Faults and imperfections in painted surfaces are repaired according to organisational procedures
  4. Weathered surfaces are restored using cleaners and liquid abrasives
  5. Lubricants are applied to moving parts of vessel underwater equipment according to manufacturer instructions
  6. Corrosion control is carried out according to organisational procedures and manufacturer instructions
  7. Action to ensure watertight integrity is completed
  8. Routine adjustments are made to equipment and fittings according to manufacturer instructions
  9. Faulty vessel machinery and fittings are identified and replacement procedures are implemented
Suitable personal protective clothing is selected and used according to work health and safety (WHS)/occupational health and safety (OHS) requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Permits for hot work, confined space entry and other high risk activities are completed according to organisational and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faults and imperfections in painted surfaces are repaired according to organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Weathered surfaces are restored using cleaners and liquid abrasives

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lubricants are applied to moving parts of vessel underwater equipment according to manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrosion control is carried out according to organisational procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Action to ensure watertight integrity is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine adjustments are made to equipment and fittings according to manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faulty vessel machinery and fittings are identified and replacement procedures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise crew completing maintenance and repairs to hull, equipment and fittings

  1. Workload is organised in order of priority, taking into consideration all listed work including survey work
  2. Maintenance tasks are allocated to appropriate crew members with consideration of individual experience and qualifications
  3. Crew members are clearly briefed on their responsibility, maintenance tasks and WHS/OHS requirements
  4. Guidance is provided appropriate to the maintenance task and individual experience
  5. Completed work is checked to ensure maintenance is performed according to dry dock plan and organisational procedures
Workload is organised in order of priority, taking into consideration all listed work including survey work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance tasks are allocated to appropriate crew members with consideration of individual experience and qualifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Crew members are clearly briefed on their responsibility, maintenance tasks and WHS/OHS requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Guidance is provided appropriate to the maintenance task and individual experience

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completed work is checked to ensure maintenance is performed according to dry dock plan and organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete duties prior to refloating

  1. Final internal inspection of vessel is conducted to ensure all listed work is completed to a satisfactory standard
  2. External inspection of hull and underside is carried out to ensure all listed work is completed to a satisfactory standard
  3. All tank plugs that have been drawn are replaced
  4. Crew are instructed on activities to be completed to make vessel ready for sailing
  5. Check is conducted to ensure a full set of tank soundings has been taken and the distribution of fresh water, fuel and lubricating oil are according to soundings taken on arrival
  6. Tank quantities are applied to complete stability check to ensure that the vessel has an acceptable GM once she floats clear of the keel blocks or slipway
  7. All hatch covers are closed and watertight integrity of uppermost deck is assured
  8. Anchors and cables are heaved up and stowed correctly, and all shore pipelines and powerlines are disconnected
  9. Confirmation that refloating can proceed is agreed with person in charge of refloating operation
Final internal inspection of vessel is conducted to ensure all listed work is completed to a satisfactory standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

External inspection of hull and underside is carried out to ensure all listed work is completed to a satisfactory standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All tank plugs that have been drawn are replaced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Crew are instructed on activities to be completed to make vessel ready for sailing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check is conducted to ensure a full set of tank soundings has been taken and the distribution of fresh water, fuel and lubricating oil are according to soundings taken on arrival

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tank quantities are applied to complete stability check to ensure that the vessel has an acceptable GM once she floats clear of the keel blocks or slipway

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All hatch covers are closed and watertight integrity of uppermost deck is assured

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Anchors and cables are heaved up and stowed correctly, and all shore pipelines and powerlines are disconnected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirmation that refloating can proceed is agreed with person in charge of refloating operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Safely dock vessel into dry dock or slipway

1.1

Slipway or dry dock particulars are assessed for suitability for dry docking or slipping vessel

1.2

Ship supports, scaffolding and other service systems are assessed for compatibility to dry dock or slipway particulars

1.3

Plan is prepared for docking or slipping vessel

1.4

Cradle, supports and/or slings are prepared prior to slipping vessel

1.5

Vessel is made ready for slipping according to organisational and dry dock requirements

1.6

Vessel is slipped according to environmental safe work practices and safety instructions

2

Inspect underwater hull, equipment and fittings

2.1

Checks of vessel hull, equipment and fittings are carried out according to maintenance schedules and vessel manufacturer instructions

2.2

Deterioration in vessel structure, equipment and fittings is identified

2.3

Checks on watertight integrity of vessel are carried out according to organisational procedures and safety regulations

2.4

Damage to watertight integrity is identified and appropriate action is determined

2.5

Listed work plan is prepared to rectify all identified faults

2.6

Surveyor or authorised person is engaged to ensure appropriate certification can be issued or endorsed on completion of work, where applicable

3

Select and use maintenance equipment and materials

3.1

Tools and equipment are correctly identified, selected and used

3.2

Maintenance materials are obtained, prepared and used according to organisational procedures and manufacturer instructions

3.3

Environmental procedures are followed and waste from cleaning and maintenance tasks is collected, treated and disposed of, or recycled, according to organisational procedures

3.4

Malfunctions, faults, wear or damage to tools are reported according to organisational procedures

3.5

Equipment and tools are cleaned, returned to operating order and stored according to organisational procedures and manufacturer instructions

3.6

Chemicals are used and stored according to organisational procedures and manufacturer instructions

3.7

Paint is used and stored according to organisational procedures and manufacturer instructions

4

Carry out required maintenance and repairs to hull, equipment and fittings

4.1

Suitable personal protective clothing is selected and used according to work health and safety (WHS)/occupational health and safety (OHS) requirements

4.2

Permits for hot work, confined space entry and other high risk activities are completed according to organisational and regulatory requirements

4.3

Faults and imperfections in painted surfaces are repaired according to organisational procedures

4.4

Weathered surfaces are restored using cleaners and liquid abrasives

4.5

Lubricants are applied to moving parts of vessel underwater equipment according to manufacturer instructions

4.6

Corrosion control is carried out according to organisational procedures and manufacturer instructions

4.7

Action to ensure watertight integrity is completed

4.8

Routine adjustments are made to equipment and fittings according to manufacturer instructions

4.9

Faulty vessel machinery and fittings are identified and replacement procedures are implemented

5

Supervise crew completing maintenance and repairs to hull, equipment and fittings

5.1

Workload is organised in order of priority, taking into consideration all listed work including survey work

5.2

Maintenance tasks are allocated to appropriate crew members with consideration of individual experience and qualifications

5.3

Crew members are clearly briefed on their responsibility, maintenance tasks and WHS/OHS requirements

5.4

Guidance is provided appropriate to the maintenance task and individual experience

5.5

Completed work is checked to ensure maintenance is performed according to dry dock plan and organisational procedures

6

Complete duties prior to refloating

6.1

Final internal inspection of vessel is conducted to ensure all listed work is completed to a satisfactory standard

6.2

External inspection of hull and underside is carried out to ensure all listed work is completed to a satisfactory standard

6.3

All tank plugs that have been drawn are replaced

6.4

Crew are instructed on activities to be completed to make vessel ready for sailing

6.5

Check is conducted to ensure a full set of tank soundings has been taken and the distribution of fresh water, fuel and lubricating oil are according to soundings taken on arrival

6.6

Tank quantities are applied to complete stability check to ensure that the vessel has an acceptable GM once she floats clear of the keel blocks or slipway

6.7

All hatch covers are closed and watertight integrity of uppermost deck is assured

6.8

Anchors and cables are heaved up and stowed correctly, and all shore pipelines and powerlines are disconnected

6.9

Confirmation that refloating can proceed is agreed with person in charge of refloating operation

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Safely dock vessel into dry dock or slipway

1.1

Slipway or dry dock particulars are assessed for suitability for dry docking or slipping vessel

1.2

Ship supports, scaffolding and other service systems are assessed for compatibility to dry dock or slipway particulars

1.3

Plan is prepared for docking or slipping vessel

1.4

Cradle, supports and/or slings are prepared prior to slipping vessel

1.5

Vessel is made ready for slipping according to organisational and dry dock requirements

1.6

Vessel is slipped according to environmental safe work practices and safety instructions

2

Inspect underwater hull, equipment and fittings

2.1

Checks of vessel hull, equipment and fittings are carried out according to maintenance schedules and vessel manufacturer instructions

2.2

Deterioration in vessel structure, equipment and fittings is identified

2.3

Checks on watertight integrity of vessel are carried out according to organisational procedures and safety regulations

2.4

Damage to watertight integrity is identified and appropriate action is determined

2.5

Listed work plan is prepared to rectify all identified faults

2.6

Surveyor or authorised person is engaged to ensure appropriate certification can be issued or endorsed on completion of work, where applicable

3

Select and use maintenance equipment and materials

3.1

Tools and equipment are correctly identified, selected and used

3.2

Maintenance materials are obtained, prepared and used according to organisational procedures and manufacturer instructions

3.3

Environmental procedures are followed and waste from cleaning and maintenance tasks is collected, treated and disposed of, or recycled, according to organisational procedures

3.4

Malfunctions, faults, wear or damage to tools are reported according to organisational procedures

3.5

Equipment and tools are cleaned, returned to operating order and stored according to organisational procedures and manufacturer instructions

3.6

Chemicals are used and stored according to organisational procedures and manufacturer instructions

3.7

Paint is used and stored according to organisational procedures and manufacturer instructions

4

Carry out required maintenance and repairs to hull, equipment and fittings

4.1

Suitable personal protective clothing is selected and used according to work health and safety (WHS)/occupational health and safety (OHS) requirements

4.2

Permits for hot work, confined space entry and other high risk activities are completed according to organisational and regulatory requirements

4.3

Faults and imperfections in painted surfaces are repaired according to organisational procedures

4.4

Weathered surfaces are restored using cleaners and liquid abrasives

4.5

Lubricants are applied to moving parts of vessel underwater equipment according to manufacturer instructions

4.6

Corrosion control is carried out according to organisational procedures and manufacturer instructions

4.7

Action to ensure watertight integrity is completed

4.8

Routine adjustments are made to equipment and fittings according to manufacturer instructions

4.9

Faulty vessel machinery and fittings are identified and replacement procedures are implemented

5

Supervise crew completing maintenance and repairs to hull, equipment and fittings

5.1

Workload is organised in order of priority, taking into consideration all listed work including survey work

5.2

Maintenance tasks are allocated to appropriate crew members with consideration of individual experience and qualifications

5.3

Crew members are clearly briefed on their responsibility, maintenance tasks and WHS/OHS requirements

5.4

Guidance is provided appropriate to the maintenance task and individual experience

5.5

Completed work is checked to ensure maintenance is performed according to dry dock plan and organisational procedures

6

Complete duties prior to refloating

6.1

Final internal inspection of vessel is conducted to ensure all listed work is completed to a satisfactory standard

6.2

External inspection of hull and underside is carried out to ensure all listed work is completed to a satisfactory standard

6.3

All tank plugs that have been drawn are replaced

6.4

Crew are instructed on activities to be completed to make vessel ready for sailing

6.5

Check is conducted to ensure a full set of tank soundings has been taken and the distribution of fresh water, fuel and lubricating oil are according to soundings taken on arrival

6.6

Tank quantities are applied to complete stability check to ensure that the vessel has an acceptable GM once she floats clear of the keel blocks or slipway

6.7

All hatch covers are closed and watertight integrity of uppermost deck is assured

6.8

Anchors and cables are heaved up and stowed correctly, and all shore pipelines and powerlines are disconnected

6.9

Confirmation that refloating can proceed is agreed with person in charge of refloating operation

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

completing maintenance records

developing effective planning documents

implementing safe and environmentally responsible work practices

liaising with surveyor to ensure work is carried out to regulatory requirements for the issue or endorsement of relevant certificates

reading, interpreting and applying:

operating and service manuals for the slipping/docking of a vessel and the maintenance of its hull

manufacturer instructions including all WHS/OHS requirements and safety data sheets (SDS)/material safety data sheets (MSDS)

recognising faulty equipment

recognising hull damage and deterioration, and taking appropriate actioning according to organisational procedures

selecting and using correct tools and equipment for maintenance task.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

basic stability and stability terms

component parts, operation and routine maintenance requirements of vessel equipment and fittings

equipment cleaning and preservation techniques

maintenance hazards and problems

nature and causes of corrosion of marine surfaces and structures, and the available methods for its control

organisational procedures for cleaning and maintenance

paint types and applications

preservatives and finishes used in marine maintenance and the related procedures for their handling, preparation, application and storage

principal features of structure of vessels

principles and procedures of lubrication as they relate to underwater vessel equipment and fittings

procedures for:

working in confined spaces

initiating and coordinating repair and/or replacement of underwater equipment and fittings

checking and inspecting vessel hull as part of routine maintenance procedures

regulatory certification requirements

relevant sections of state and territory regulations, National Standard for Commercial Vessels (NSCV) Code and Uniform Shipping Laws (USL) Code dealing with Master responsibilities

relevant WHS/OHS and pollution control legislation

rust treatment

slipping and docking procedures suitable for various types of hull forms

stability as it relates to docking or slipping operation and refloating

types, characteristics and functions of:

underwater vessel machinery and equipment

equipment/tools used in cleaning and maintenance.

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Slipway or dry dock particulars include one or more of the following:

acceptable draught

crane lifting capacities

dimensions

electric power supply

firefighting provisions

insurances

policy and facility for atmospheric checks of confined spaces

responsibility for WHS/OHS

safe vessel access

safe working load

travel lifts and appropriate lifting equipment

type of floor

Environmental procedures must include:

application of paint

disposal of waste from hull scraping operations

disposal of waste material

fuel transfer operations

Routine adjustments include one or more of the following:

ranging and examination of anchors and cables

withdrawing and examination of:

propeller and shafts

rudder and rudder stock