NTISthis.com

Evidence Guide: MARB023 - Maintain marina infrastructure

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MARB023 - Maintain marina infrastructure

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for maintenance

  1. Marina infrastructure that requires regular maintenance is recognised and confirmed with relevant personnel, if required
  2. Potential risks, hazards and environmental issues are identified and control measures are established
  3. Appropriate tools and equipment required to undertake maintenance activities are identified and assembled
  4. In preparation for fire/accident/emergency, relevant emergency procedures are obtained and interpreted
  5. Skills and experience of marina personnel required to carry out maintenance are established and duties are allocated
  6. Maintenance schedule is obtained and interpreted
Marina infrastructure that requires regular maintenance is recognised and confirmed with relevant personnel, if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Potential risks, hazards and environmental issues are identified and control measures are established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate tools and equipment required to undertake maintenance activities are identified and assembled

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

In preparation for fire/accident/emergency, relevant emergency procedures are obtained and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Skills and experience of marina personnel required to carry out maintenance are established and duties are allocated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance schedule is obtained and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake maintenance

  1. Personal protective clothing and/or equipment is identified, used and maintained according to workplace procedures
  2. Firefighting equipment is located, selected and made ready according to workplace procedures
  3. Work area is prepared according to workplace policies and procedures
  4. Relevant plant, tools and equipment are prepared and made ready for use
  5. Maintenance is carried out safely according to workplace policies and procedures
  6. Safe work practices and environmental requirements are followed
  7. Work is checked against job requirements and presented to relevant personnel for verification
Personal protective clothing and/or equipment is identified, used and maintained according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Firefighting equipment is located, selected and made ready according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is prepared according to workplace policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant plant, tools and equipment are prepared and made ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance is carried out safely according to workplace policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safe work practices and environmental requirements are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is checked against job requirements and presented to relevant personnel for verification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete maintenance and clean-up work area

  1. Work area is cleaned and tools and equipment are stored according to workplace procedures
  2. Defective or malfunctioning plant, tools, equipment and systems are reported according to workplace procedures
  3. Maintenance schedule is reviewed and revised if necessary
  4. All required documentation is completed according to workplace procedures
Work area is cleaned and tools and equipment are stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Defective or malfunctioning plant, tools, equipment and systems are reported according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance schedule is reviewed and revised if necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All required documentation is completed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for maintenance

1.1

Marina infrastructure that requires regular maintenance is recognised and confirmed with relevant personnel, if required

1.2

Potential risks, hazards and environmental issues are identified and control measures are established

1.3

Appropriate tools and equipment required to undertake maintenance activities are identified and assembled

1.4

In preparation for fire/accident/emergency, relevant emergency procedures are obtained and interpreted

1.5

Skills and experience of marina personnel required to carry out maintenance are established and duties are allocated

1.6

Maintenance schedule is obtained and interpreted

2

Undertake maintenance

2.1

Personal protective clothing and/or equipment is identified, used and maintained according to workplace procedures

2.2

Firefighting equipment is located, selected and made ready according to workplace procedures

2.3

Work area is prepared according to workplace policies and procedures

2.4

Relevant plant, tools and equipment are prepared and made ready for use

2.5

Maintenance is carried out safely according to workplace policies and procedures

2.6

Safe work practices and environmental requirements are followed

2.7

Work is checked against job requirements and presented to relevant personnel for verification

3

Complete maintenance and clean-up work area

3.1

Work area is cleaned and tools and equipment are stored according to workplace procedures

3.2

Defective or malfunctioning plant, tools, equipment and systems are reported according to workplace procedures

3.3

Maintenance schedule is reviewed and revised if necessary

3.4

All required documentation is completed according to workplace procedures

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for maintenance

1.1

Marina infrastructure that requires regular maintenance is recognised and confirmed with relevant personnel, if required

1.2

Potential risks, hazards and environmental issues are identified and control measures are established

1.3

Appropriate tools and equipment required to undertake maintenance activities are identified and assembled

1.4

In preparation for fire/accident/emergency, relevant emergency procedures are obtained and interpreted

1.5

Skills and experience of marina personnel required to carry out maintenance are established and duties are allocated

1.6

Maintenance schedule is obtained and interpreted

2

Undertake maintenance

2.1

Personal protective clothing and/or equipment is identified, used and maintained according to workplace procedures

2.2

Firefighting equipment is located, selected and made ready according to workplace procedures

2.3

Work area is prepared according to workplace policies and procedures

2.4

Relevant plant, tools and equipment are prepared and made ready for use

2.5

Maintenance is carried out safely according to workplace policies and procedures

2.6

Safe work practices and environmental requirements are followed

2.7

Work is checked against job requirements and presented to relevant personnel for verification

3

Complete maintenance and clean-up work area

3.1

Work area is cleaned and tools and equipment are stored according to workplace procedures

3.2

Defective or malfunctioning plant, tools, equipment and systems are reported according to workplace procedures

3.3

Maintenance schedule is reviewed and revised if necessary

3.4

All required documentation is completed according to workplace procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and work practices

identifying hazards and assessing risks appropriate to own work area and job role

implementing standard operating procedures (SOPs)

interacting effectively with other personnel on a one-to-one basis and in groups

planning and organising own work activities

preparing draft maintenance schedule

reading and interpreting written information needed to perform basic calculations and establish job requirements.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

common damage that occurs in a marina

boat types and construction

efficient and productive use of materials with minimum wastage

hazards and established control measures associated with the routine task, including housekeeping

preventive maintenance, benefits and its importance in a marina

purpose and benefits of regular maintenance in a marina

roles, responsibility and duties undertaken by marina staff

site layout

types of marinas, use, characteristics and features

types of vessel, size and construction

use and purpose of SOPs

workplace policies and procedures

WHS/OHS practices and procedures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Infrastructure requiring regular maintenance includes:

equipment including:

marina trolley

straddle carrier

fendering (fender strip)

gangways and ramps

pontoons

piles

rollers and rubbing blocks on pile guides

service pedestals, power/water