The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Safely dock vessel into dry dock or slipway
|
|
Slipway or dry dock particulars are assessed for suitability for dry docking or slipping vessel Completed |
Evidence:
|
Ship supports, scaffolding and other service systems are assessed for compatibility to dry dock or slipway particulars Completed |
Evidence:
|
Plan is prepared for docking or slipping vessel Completed |
Evidence:
|
Cradle, supports and/or slings are prepared prior to slipping vessel Completed |
Evidence:
|
Vessel is made ready for slipping according to organisational and dry dock requirements Completed |
Evidence:
|
Vessel is slipped according to environmental safe work practices and safety instructions Completed |
Evidence:
|
Inspect underwater hull, equipment and fittings
|
|
Checks of vessel hull, equipment and fittings are carried out according to maintenance schedules and vessel manufacturer instructions Completed |
Evidence:
|
Deterioration in vessel structure, equipment and fittings is identified Completed |
Evidence:
|
Checks on watertight integrity of vessel are carried out according to organisational procedures and safety regulations Completed |
Evidence:
|
Damage to watertight integrity is identified and appropriate action is determined Completed |
Evidence:
|
Listed work plan is prepared to rectify all identified faults Completed |
Evidence:
|
Surveyor or authorised person is engaged to ensure appropriate certification can be issued or endorsed on completion of work, where applicable Completed |
Evidence:
|
Select and use maintenance equipment and materials
|
|
Tools and equipment are correctly identified, selected and used Completed |
Evidence:
|
Maintenance materials are obtained, prepared and used according to organisational procedures and manufacturer instructions Completed |
Evidence:
|
Environmental procedures are followed and waste from cleaning and maintenance tasks is collected, treated and disposed of, or recycled, according to organisational procedures Completed |
Evidence:
|
Malfunctions, faults, wear or damage to tools are reported according to organisational procedures Completed |
Evidence:
|
Equipment and tools are cleaned, returned to operating order and stored according to organisational procedures and manufacturer instructions Completed |
Evidence:
|
Chemicals are used and stored according to organisational procedures and manufacturer instructions Completed |
Evidence:
|
Paint is used and stored according to organisational procedures and manufacturer instructions Completed |
Evidence:
|
Carry out required maintenance and repairs to hull, equipment and fittings
|
|
Suitable personal protective clothing is selected and used according to work health and safety (WHS)/occupational health and safety (OHS) requirements Completed |
Evidence:
|
Permits for hot work, confined space entry and other high risk activities are completed according to organisational and regulatory requirements Completed |
Evidence:
|
Faults and imperfections in painted surfaces are repaired according to organisational procedures Completed |
Evidence:
|
Weathered surfaces are restored using cleaners and liquid abrasives Completed |
Evidence:
|
Lubricants are applied to moving parts of vessel underwater equipment according to manufacturer instructions Completed |
Evidence:
|
Corrosion control is carried out according to organisational procedures and manufacturer instructions Completed |
Evidence:
|
Action to ensure watertight integrity is completed Completed |
Evidence:
|
Routine adjustments are made to equipment and fittings according to manufacturer instructions Completed |
Evidence:
|
Faulty vessel machinery and fittings are identified and replacement procedures are implemented Completed |
Evidence:
|
Supervise crew completing maintenance and repairs to hull, equipment and fittings
|
|
Workload is organised in order of priority, taking into consideration all listed work including survey work Completed |
Evidence:
|
Maintenance tasks are allocated to appropriate crew members with consideration of individual experience and qualifications Completed |
Evidence:
|
Crew members are clearly briefed on their responsibility, maintenance tasks and WHS/OHS requirements Completed |
Evidence:
|
Guidance is provided appropriate to the maintenance task and individual experience Completed |
Evidence:
|
Completed work is checked to ensure maintenance is performed according to dry dock plan and organisational procedures Completed |
Evidence:
|
Complete duties prior to refloating
|
|
Final internal inspection of vessel is conducted to ensure all listed work is completed to a satisfactory standard Completed |
Evidence:
|
External inspection of hull and underside is carried out to ensure all listed work is completed to a satisfactory standard Completed |
Evidence:
|
All tank plugs that have been drawn are replaced Completed |
Evidence:
|
Crew are instructed on activities to be completed to make vessel ready for sailing Completed |
Evidence:
|
Check is conducted to ensure a full set of tank soundings has been taken and the distribution of fresh water, fuel and lubricating oil are according to soundings taken on arrival Completed |
Evidence:
|
Tank quantities are applied to complete stability check to ensure that the vessel has an acceptable GM once she floats clear of the keel blocks or slipway Completed |
Evidence:
|
All hatch covers are closed and watertight integrity of uppermost deck is assured Completed |
Evidence:
|
Anchors and cables are heaved up and stowed correctly, and all shore pipelines and powerlines are disconnected Completed |
Evidence:
|
Confirmation that refloating can proceed is agreed with person in charge of refloating operation Completed |
Evidence:
|