The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Sea conditions and use of tag lines are assessed in accordance with workplace procedures |
|
Completed |
Evidence:
|
Hazards and potential hazards associated with slinging and directing loads are identified in accordance with workplace procedures |
|
Completed |
Evidence:
|
Hazard control measures consistent with appropriate standards are identified to ensure safety of personnel and equipment in accordance with workplace procedures |
|
Completed |
Evidence:
|
Weight, dimensions and load centre of gravity (CG) are identified and assessed |
|
Completed |
Evidence:
|
Suitable lifting/slinging points on load are established |
|
Completed |
Evidence:
|
Appropriate lifting equipment needs are assessed, including rig/vessel crane limitations, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Appropriate communication methods are established in consultation with crane/operators and other appropriate personnel |
|
Completed |
Evidence:
|
Manufacturer specifications/information is obtained for special loads, as required |
|
Completed |
Evidence:
|
Select and inspect equipment
|
|
Lifting equipment appropriate to task is selected and inspected for serviceability in accordance with workplace procedures Completed |
Evidence:
|
Damaged or excessively worn lifting equipment is identified, labelled and isolated in accordance with workplace procedures |
|
Completed |
Evidence:
|
Appropriate communication equipment is selected and serviceability checked |
|
Completed |
Evidence:
|
Appropriate personal protective equipment (PPE) is selected and checked |
|
Completed |
Evidence:
|
Prepare site and equipment
|
|
Hazard prevention/control measures are applied consistent with appropriate standards to ensure safety of personnel and equipment in accordance with workplace procedures Completed |
Evidence:
|
Clear communications and roles of deck crew are established when working cargo with a rig crane or another vessel in accordance with workplace procedures |
|
Completed |
Evidence:
|
Appropriate slinging method is selected |
|
Completed |
Evidence:
|
Lifting equipment is prepared and assembled, as required |
|
Completed |
Evidence:
|
Load landing destination is prepared
|
|
Knots, hitches and bends using fibre and synthetic ropes are correctly made and used in course of deck operations Completed |
Evidence:
|
Lifting equipment is attached and secured to lifting hook using appropriate techniques |
|
Completed |
Evidence:
|
Lifting hook is positioned over load CG |
|
Completed |
Evidence:
|
Lifting equipment is attached and secured to load in an appropriate manner |
|
Completed |
Evidence:
|
Tag line is attached and secured, as required |
|
Completed |
Evidence:
|
Test lift is conducted to ensure load security |
|
Completed |
Evidence:
|
Load is moved, and stability and control are maintained at all times |
|
Completed |
Evidence:
|
Appropriate communication methods and communication signals are applied to safely coordinate load movement within sight and out-of-sight of ship’s crane operator |
|
Completed |
Evidence:
|
Loads are correctly rigged using appropriate ropes and rigging gear in accordance with workplace procedures |
|
Completed |
Evidence:
|
Load is landed to ensure it is stable and secure from movement, is in position to be lashed with appropriate consideration given to effects of vessel’s motion on stowed cargo when lashing cargo |
|
Completed |
Evidence:
|
Shut down job, clean up and maintain equipment
|
|
Lifting equipment is removed or disconnected from load and prepared for next task or storage Completed |
Evidence:
|
Defective equipment is isolated and tagged in accordance with workplace procedures |
|
Completed |
Evidence:
|
Lifting equipment is stored in accordance with workplace procedures |
|
Completed |
Evidence:
|
Hazard prevention/control measures are removed, as required, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Excess materials from work area are removed, as required, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Defects are reported and recorded in accordance with workplace procedures, and appropriate action is taken |
|
Completed |
Evidence:
|
Rope, wire and cables are stowed and maintained in accordance with workplace procedures and manufacturer instructions |
|
Completed |
Evidence:
|