Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MARM017 - Survey vessel operational systems

What evidence can you provide to prove your understanding of each of the following citeria?

Identify survey requirements

  1. Relevant standards for vessel equipment and operational systems are identified, accessed and incorporated into survey plan as required
  2. Survey scope and depth is confirmed against relevant standards and organisational requirements
  3. Operational limits, certificate of operations and previous certificates of survey are reviewed for special conditions or equivalent solutions
  4. Equipment and operational system requirements for survey and range of variations are accurately identified, selected and tested for serviceability
Relevant standards for vessel equipment and operational systems are identified, accessed and incorporated into survey plan as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Survey scope and depth is confirmed against relevant standards and organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational limits, certificate of operations and previous certificates of survey are reviewed for special conditions or equivalent solutions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and operational system requirements for survey and range of variations are accurately identified, selected and tested for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for survey

  1. Operational systems to be surveyed for type, size and nature of vessel operations are accurately identified, reviewed and incorporated into survey plan
  2. Relationships between different operational systems are accurately interpreted and items to be surveyed are noted in survey plan
  3. Maintenance records are obtained and reviewed to confirm survey scope
Operational systems to be surveyed for type, size and nature of vessel operations are accurately identified, reviewed and incorporated into survey plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relationships between different operational systems are accurately interpreted and items to be surveyed are noted in survey plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance records are obtained and reviewed to confirm survey scope

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct periodic survey of operational systems

  1. Survey of operational systems is carried out according to regulatory requirements
  2. Primary and secondary operational systems and their components are surveyed according to survey schedule
  3. Changes to operational equipment or equivalent solutions are identified and examined for fitness both in or out of water as required by survey schedule
Survey of operational systems is carried out according to regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Primary and secondary operational systems and their components are surveyed according to survey schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Changes to operational equipment or equivalent solutions are identified and examined for fitness both in or out of water as required by survey schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report and act on non-compliance

  1. Non-compliance is detected, recorded and reported according to regulatory and organisational requirements
  2. Risk arising from non-compliance is detected, reported and communicated to relevant personnel
  3. Relevant provisions of legislation appropriate to level of risk detected are identified and followed
  4. Appropriate reports and documentation related to survey are developed and managed according to regulatory and organisational requirements
Non-compliance is detected, recorded and reported according to regulatory and organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risk arising from non-compliance is detected, reported and communicated to relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant provisions of legislation appropriate to level of risk detected are identified and followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate reports and documentation related to survey are developed and managed according to regulatory and organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify survey requirements

1.1

Relevant standards for vessel equipment and operational systems are identified, accessed and incorporated into survey plan as required

1.2

Survey scope and depth is confirmed against relevant standards and organisational requirements

1.3

Operational limits, certificate of operations and previous certificates of survey are reviewed for special conditions or equivalent solutions

1.4

Equipment and operational system requirements for survey and range of variations are accurately identified, selected and tested for serviceability

2

Prepare for survey

2.1

Operational systems to be surveyed for type, size and nature of vessel operations are accurately identified, reviewed and incorporated into survey plan

2.2

Relationships between different operational systems are accurately interpreted and items to be surveyed are noted in survey plan

2.3

Maintenance records are obtained and reviewed to confirm survey scope

3

Conduct periodic survey of operational systems

3.1

Survey of operational systems is carried out according to regulatory requirements

3.2

Primary and secondary operational systems and their components are surveyed according to survey schedule

3.3

Changes to operational equipment or equivalent solutions are identified and examined for fitness both in or out of water as required by survey schedule

4

Report and act on non-compliance

4.1

Non-compliance is detected, recorded and reported according to regulatory and organisational requirements

4.2

Risk arising from non-compliance is detected, reported and communicated to relevant personnel

4.3

Relevant provisions of legislation appropriate to level of risk detected are identified and followed

4.4

Appropriate reports and documentation related to survey are developed and managed according to regulatory and organisational requirements

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify survey requirements

1.1

Relevant standards for vessel equipment and operational systems are identified, accessed and incorporated into survey plan as required

1.2

Survey scope and depth is confirmed against relevant standards and organisational requirements

1.3

Operational limits, certificate of operations and previous certificates of survey are reviewed for special conditions or equivalent solutions

1.4

Equipment and operational system requirements for survey and range of variations are accurately identified, selected and tested for serviceability

2

Prepare for survey

2.1

Operational systems to be surveyed for type, size and nature of vessel operations are accurately identified, reviewed and incorporated into survey plan

2.2

Relationships between different operational systems are accurately interpreted and items to be surveyed are noted in survey plan

2.3

Maintenance records are obtained and reviewed to confirm survey scope

3

Conduct periodic survey of operational systems

3.1

Survey of operational systems is carried out according to regulatory requirements

3.2

Primary and secondary operational systems and their components are surveyed according to survey schedule

3.3

Changes to operational equipment or equivalent solutions are identified and examined for fitness both in or out of water as required by survey schedule

4

Report and act on non-compliance

4.1

Non-compliance is detected, recorded and reported according to regulatory and organisational requirements

4.2

Risk arising from non-compliance is detected, reported and communicated to relevant personnel

4.3

Relevant provisions of legislation appropriate to level of risk detected are identified and followed

4.4

Appropriate reports and documentation related to survey are developed and managed according to regulatory and organisational requirements

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

accurately interpreting relevant codes, standards, rules and regulations for vessel operational systems

analysing and evaluating available data and observations to form logical conclusions

applying relevant work health and safety/occupational health and safety (WHS/OHS) requirements and work practices

carrying out engineering measurements and applying metric and imperial conversions

developing effective planning documents

ensuring currency of relevant WHS/OHS skills and knowledge

inspecting and testing operational systems according to regulatory and organisational requirements

communicating effectively with others as required, verbally and in writing

implementing principles of WHS/OHS and marine environment protection measures

negotiating and resolving conflict

reading and interpreting:

machinery performance readings and indications

plans and drawings

technical information

recognising and documenting faulty equipment

selecting and using appropriate tools and equipment

undertaking research and analysing reference material and manufacturer data sheets

writing high quality reports.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

battery types, care and maintenance

commercial vessel classifications and survey requirements for various operational systems and their components

compatibility and durability of construction materials

construction and layout of a typical commercial vessel, including layouts for pipework, tail shaft assembly and installed machinery

environmental controls and regulations for primary, secondary or ancillary systems and their components

ethical behaviour and industry codes of practice

features and characteristics of typical faults and signs of deterioration in operational systems and components

features of different engine types and sizes

forms, causes and prevention of corrosion in a marine environment

insurance, liability and professional indemnity requirements for self and others

interaction of vessel structures and mechanical systems

maintaining watertight integrity

operational characteristics and performance specifications for different types of marine internal combustion engines and propulsion machinery usually found on vessels of up to 750 kW propulsion power

principal features of fittings and machinery found on typical small vessels and characteristics of engine/plant and ancillary equipment

procedures for:

checking fittings, machinery and components

reading and interpreting machinery performance readings and indications

purpose and content of safety data sheets/material safety data sheets (SDSs/MSDSs)

relevant sections of state and territory maritime regulations, National Standard for Commercial Vessels (NSCV) and Uniform Shipping Laws (USL) Code dealing with maintaining small vessels

report writing requirements for a range of different survey tasks

safety, environmental and hazard control precautions and procedures relevant to checking and basic maintenance of fittings and machinery

typical problems related to inspecting and maintaining operational systems

typical vessel and machinery specifications, operating manuals and specifications

WHS/OHS legislation, policies and procedures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Relevant standards include one or more of the following:

class rules and approvals

general servicing requirements for operational equipment

manufacturer guidelines and servicing requirements

Marine Orders

National Standard for the Administration of Marine Safety (NSAMS) Section 4

NSCV and USL Code as applicable

organisational standards

safety data sheets/material safety data sheets (SDSs/MSDSs)

safety management systems (SMS)

safety of life at sea (SOLAS)

Australian/New Zealand Standards (AS/NZS):

AS/NZS 3000: Electrical installations

AS/NZS 3004: Electrical installations – verification guidelines

WHS/OHS

Survey scope and depth include one or more of the following:

class of vessel

grandfathering conditions

survey cycle in accordance with NSAMS Chapter 4:

change of class survey

damage/repair or condition surveys

equivalent solution or deemed-to-satisfy surveys

periodic survey (either annual or bi-annual)

survey level of vessel

Operational limits include one or more of the following:

as defined in certificate of operations and/or certificate of survey

testing requirements for electrical and fire systems

Regulatory requirements include one or more of the following:

Marine Safety (Domestic Commercial Vessel) National Law

NSCV

regulations and Marine Orders

USL Code

Primary and secondary operational systems include one or more of the following:

maintenance and servicing requirements as well as general condition of:

ballast

bilge pumping systems

communication equipment

electrical systems

engines and auxiliaries

fire and safety systems

fuel systems

hydraulic systems

machinery systems

navigational systems

piping and pumping systems

power generating plants such as hybrid systems, wind and solar generation

propulsion systems

refrigeration

sanitary systems

steering systems

tanks

Equivalent solutions include one or more of the following:

as noted in certificate of operation or certificate of survey

as noted in NSCV Part B

national register of exemptions and equivalent solutions