The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Inspect single layer printed circuit cards and associated components
|
|
Relevant maintenance documentation, including component defect reports, where applicable, is interpreted and matched by part and serial number Completed |
Evidence:
|
Preparation of work area and circuit card assemblies is appropriate to allow for effective detailed inspection of all substrate, circuit tracks, edge connectors and attached components, taking into account any static discharge procedures Completed |
Evidence:
|
Circuit card assemblies are visually or physically inspected for physical integrity of substrate, circuit tracks, edge connectors and attached components Completed |
Evidence:
|
Modification status is established to assist in determining repair requirements Completed |
Evidence:
|
Defects are correctly identified and reported Completed |
Evidence:
|
Test single layer printed circuit cards and associated components
|
|
Circuit card assemblies are correctly prepared and connected to the appropriate test facility in accordance with approved procedures, or circuit card assemblies are correctly prepared and connected in situ to allow required test procedures to be performed Completed |
Evidence:
|
Circuit card assemblies are functionally tested in accordance with normal trade practice and approved maintenance documentation for evidence of serviceability or malfunction Completed |
Evidence:
|
Circuit card assemblies, attached hardware and electronic components are electronically and/or physically adjusted/aligned in accordance with maintenance manuals or other prescribed procedures Completed |
Evidence:
|
Troubleshoot single layer printed circuit cards and associated components
|
|
Maintenance documentation, physical inspection and test results are used, where applicable, to assist in fault determination Completed |
Evidence:
|
Maintenance manual fault diagnosis guides, logical processes and test equipment are used appropriately to ensure efficient and accurate troubleshooting Completed |
Evidence:
|
Component faults are located and the causes of the faults are clearly identified and recorded in maintenance documentation, where required Completed |
Evidence:
|
Rectification requirements are determined Completed |
Evidence:
|
Dismantle single layer printed circuit cards and associated components
|
|
Conformal/protective coatings are removed from the circuit card assembly to the extent required to effect necessary repairs and in accordance with maintenance manuals, and industry or enterprise standards as applicable Completed |
Evidence:
|
Appropriate work health and safety (WHS) requirements are observed at all times during maintenance procedures and applicable material safety data sheets (MSDS) and personal protective equipment (PPE) are used Completed |
Evidence:
|
Circuit card assembly is dismantled to the extent necessary to allow repair of all identified faults Completed |
Evidence:
|
Parts for processing are correctly tagged and despatched Completed |
Evidence:
|
Parts for retention and re-fitment are correctly packaged and stored in accordance with approved procedures to avoid physical and electrostatic damage Completed |
Evidence:
|
Parts for disposal are correctly packaged and processed to accord with statutory requirements pertaining to dangerous goods Completed |
Evidence:
|
Assemble single layer printed circuit cards and associated components
|
|
Parts removed for access, and replacement parts, are collected ensuring appropriate modification status, component tolerances and assembly configuration is maintained Completed |
Evidence:
|
Printed circuit card and associated components are assembled in accordance with maintenance manuals, and all electrical joints meet the approved standard of the equipment manufacturer, or industry standard, as appropriate Completed |
Evidence:
|
Circuit substrate material, circuit tracks, edge connectors and through-hole eyelets are reworked, as necessary, to restore printed circuit card to a serviceable condition Completed |
Evidence:
|
Any conformal/protective coatings removed are replaced to the approved standard of the equipment manufacturer, or industry standard, as appropriate Completed |
Evidence:
|
Rework techniques are in accordance with industry approval procedures and relevant WHS precautions are observed and applicable MSDS and items of PPE are used Completed |
Evidence:
|