The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for shot peening task
|
|
Process documentation is obtained and correctly interpreted Completed |
Evidence:
|
Shot peening equipment is prepared in accordance with the applicable process Completed |
Evidence:
|
Apply shot peening process to Almen strip
|
|
The correct Almen strip is selected and fitted and equipment set up with the correct stand-off distance and regulated air pressure or spindle speed in accordance with the process documentation Completed |
Evidence:
|
Applicable work health and safety (WHS) provisions are observed, including the use of material safety data sheets (MSDS) and personal protective equipment (PPE) Completed |
Evidence:
|
The process is correctly applied to the Almen strip Completed |
Evidence:
|
The Almen strip distortion is measured to ensure that it is within the specified tolerance Completed |
Evidence:
|
Equipment settings are adjusted and the Almen strip test repeated, if required Completed |
Evidence:
|
Settings that produce specified Almen strip distortion are recorded and the test strip is presented for inspection Completed |
Evidence:
|
Apply shot peening process to component
|
|
The component is cleaned and masked in accordance with process documentation Completed |
Evidence:
|
Shot peening is applied in accordance with the process documentation using equipment settings derived from Almen test strip and while observing all WHS requirements, including use of MSDS and PPE Completed |
Evidence:
|
The shot peened surface is checked for required density and coverage and re-peened, if necessary Completed |
Evidence:
|
The shot peened component is checked for cleanliness to ensure that all contaminants have been removed in accordance with the process documentation Completed |
Evidence:
|
Complete shot peening task
|
|
Task completion is recorded in accordance with standard enterprise procedures Completed |
Evidence:
|
Shot peened component is presented for inspection, along with Almen test strip and completed documentation Completed |
Evidence:
|
Where applicable, the component is tagged, sealed or packaged in accordance with specified procedures Completed |
Evidence:
|