The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan repair/modification
|
|
Extent of damage is correctly assessed to assist in determining repair procedure Completed |
Evidence:
|
Structure is supported and prepared in accordance with the applicable maintenance manual to ensure personnel safety and freedom from damage Completed |
Evidence:
|
Appropriate modification or repair scheme is identified in accordance with structural repair manual and/or approved data Completed |
Evidence:
|
Specialist advice is obtained in establishing an approved repair scheme where a standard repair scheme cannot be identified or damage criteria is out of limits Completed |
Evidence:
|
All materials and equipment required are organised Completed |
Evidence:
|
Prepare components for hot bonding
|
|
Components are prepared in accordance with applicable process specification Completed |
Evidence:
|
Bagging is checked to ensure vacuum seal is correct Completed |
Evidence:
|
Temperature probes are placed appropriately to provide accurate measurement Completed |
Evidence:
|
Equipment is checked for serviceability to ensure safety in application Completed |
Evidence:
|
Heat blanket is laid on component or repair in a manner that ensures even temperature distribution Completed |
Evidence:
|
Repair/modify components using hot bond
|
|
Hot bonding equipment is operated in accordance with equipment manufacturer's procedures Completed |
Evidence:
|
Vacuum and temperature recordings are monitored, including checking of hot and cold spots on trailing and leading temperature probes, to ensure specifications are met Completed |
Evidence:
|
Curing cycle and recording of operating cycle data are monitored as required by approved procedures to ensure specifications are met Completed |
Evidence:
|
Blemishes are sealed, potted or filled, where necessary, in accordance with applicable process specification Completed |
Evidence:
|
Component assemblies, including test pieces, requiring further or special treatment are made ready for the appropriate processes Completed |
Evidence:
|
Required maintenance documentation is accurately completed and correctly processed Completed |
Evidence:
|
Completed assemblies are tagged, sealed or packaged, as required Completed |
Evidence:
|
Repair/modify components using cold cure
|
|
Lay-up of materials is checked to confirm that components meet required specifications Completed |
Evidence:
|
Curing cycle is regularly monitored to ensure required specifications are met Completed |
Evidence:
|
Components are checked for blemishes or delamination in accordance with quality procedures Completed |
Evidence:
|
Component assemblies requiring further or special treatment are made ready for the appropriate processes Completed |
Evidence:
|
Required maintenance documentation is completed and processed in accordance with standard enterprise procedures Completed |
Evidence:
|
Completed assemblies are tagged, sealed or packaged, as required Completed |
Evidence:
|