NTISthis.com

Evidence Guide: MEAMEC0055 - Shot-peen aircraft components

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MEAMEC0055 - Shot-peen aircraft components

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for shot-peening task

  1. Obtain and interpret process documentation requirements
  2. Prepare shot-peening equipment in accordance with the applicable process
Obtain and interpret process documentation requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare shot-peening equipment in accordance with the applicable process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply shot-peening process to Almen strip

  1. Select and fit the correct Almen strip and set up equipment with the correct stand-off distance and regulated air pressure or spindle speed in accordance with the process documentation
  2. Implement applicable work health and safety (WHS) provisions, including the use of material safety data sheets (MSDSs) and personal protective equipment (PPE)
  3. Apply the process to the Almen strip
  4. Measure the Almen strip distortion to ensure that it is within the specified tolerance
  5. Adjust equipment settings and repeat the Almen strip test when required
  6. Record settings that produce specified Almen strip distortion and present the test strip for inspection
Select and fit the correct Almen strip and set up equipment with the correct stand-off distance and regulated air pressure or spindle speed in accordance with the process documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement applicable work health and safety (WHS) provisions, including the use of material safety data sheets (MSDSs) and personal protective equipment (PPE)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply the process to the Almen strip

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure the Almen strip distortion to ensure that it is within the specified tolerance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust equipment settings and repeat the Almen strip test when required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record settings that produce specified Almen strip distortion and present the test strip for inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply shot-peening process to component

  1. Clean and mask the component in accordance with process documentation
  2. Apply shot-peening in accordance with the process documentation using equipment settings derived from Almen test strip and while observing all WHS requirements, including use of MSDSs and PPE
  3. Check the shot peened surface for required density and coverage and re-peen, when required
  4. Check the shot-peened component for cleanliness to ensure that all contaminants have been removed in accordance with the process documentation
Clean and mask the component in accordance with process documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply shot-peening in accordance with the process documentation using equipment settings derived from Almen test strip and while observing all WHS requirements, including use of MSDSs and PPE

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the shot peened surface for required density and coverage and re-peen, when required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the shot-peened component for cleanliness to ensure that all contaminants have been removed in accordance with the process documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete shot-peening task

  1. Record task completion in accordance with standard enterprise procedures
  2. Present shot-peened component for inspection, along with Almen test strip and completed documentation
  3. Tag, seal and pack the component, where applicable and in accordance with specified procedures
  4. Dispose of waste shot peening media in accordance with procedures
Record task completion in accordance with standard enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Present shot-peened component for inspection, along with Almen test strip and completed documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tag, seal and pack the component, where applicable and in accordance with specified procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dispose of waste shot peening media in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge