The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Conduct pre-operational checks
|
|
The start-up procedure is conducted according to standard operating procedures. Completed |
Evidence:
|
If necessary, the shot size is adjusted. Completed |
Evidence:
|
If applicable, nitrogen and/or vacuum systems are checked Completed |
Evidence:
|
If applicable, a functional check is made of the picking robot, and the component gripper is adjusted if necessary. Completed |
Evidence:
|
Die spray nozzles are adjusted as necessary. Completed |
Evidence:
|
Planning is carried out which ensures efficient flow of finished product i.e. breaking of runners, stacking baskets, bins, conveyors. Completed |
Evidence:
|
Operate all functions on machine control panel
|
|
Appropriate knowledge of die casting process is applied to the operation, adjustment and monitoring of machine functions. Completed |
Evidence:
|
Operate machine to produce castings
|
|
The die casting machine is operated to standard operating procedures, including maintenance of liquid metal and die operating conditions. Completed |
Evidence:
|
Runners are broken off correctly. Completed |
Evidence:
|
Castings are visually inspected for porosity, cracks, tears, splits, sinks, cold shuts, tinning and die surface crazing according to standard operating procedures. Completed |
Evidence:
|
Castings are handled in a manner that minimises risk of damage to the casting and injury to personnel. Completed |
Evidence:
|
First-off castings are produced, visually inspected and submitted for checking against specifications. Completed |
Evidence:
|
Monitor furnace
|
|
The furnace is maintained at optimum operating condition to standard operating procedures. Completed |
Evidence:
|