The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine job requirements
|
|
Drawings, instructions and specifications are interpreted and understood. Completed |
Evidence:
|
Appropriate material is selected to meet specifications. Completed |
Evidence:
|
Layout model
|
|
Finished model design is conceptualised and planned with reference to customer's specifications (written or verbal) for finish, quality and form, using applicable processes. Completed |
Evidence:
|
Contractions allowances, clearances, tapers etc. are calculated to establish model parameters. Completed |
Evidence:
|
Datum boards, jigs and fixtures are designed and manufactured as required. Completed |
Evidence:
|
Manufacture model
|
|
Sequence of manufacture, including build-up on datum board, establishing datum's mark out of model and areas to be NC/CNC machined, are determined. Completed |
Evidence:
|
Appropriate machines and machining processes are selected to shape/produce model to specifications. Completed |
Evidence:
|
A range of hand and hand held power tools is selected and used utilising acceptable techniques and procedures to fashion/manufacture model to fine tolerances according to specifications, ensuring that surface finish is appropriate to the type of model. Completed |
Evidence:
|
Appropriate measurement/calculations are undertaken to check specifications, including coordinate measuring and machine checking as required. Completed |
Evidence:
|
Where necessary, all deviations or modifications to original tooling design, prints or plans, are recorded and reported consistent with standard operating procedures. Completed |
Evidence:
|