NTISthis.com

Evidence Guide: MEM10008B - Undertake commissioning procedures for plant and/or equipment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MEM10008B - Undertake commissioning procedures for plant and/or equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Plan commissioning procedure

  1. Commissioning procedure is undertaken and approvals are obtained in accordance with standard operating procedures.
Commissioning procedure is undertaken and approvals are obtained in accordance with standard operating procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess system performance

  1. Correct measuring/test devices are used.
  2. All necessary measurements/readings are taken at appropriate points.
  3. All variances from specifications are recorded to standard operating procedures.
Correct measuring/test devices are used.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All necessary measurements/readings are taken at appropriate points.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All variances from specifications are recorded to standard operating procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust plant

  1. Plant/system performance is adjusted to design and operational specifications utilising appropriate and correct techniques.
  2. Technical difficulties are resolved in consultation with appropriate technical advisers.
Plant/system performance is adjusted to design and operational specifications utilising appropriate and correct techniques.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Technical difficulties are resolved in consultation with appropriate technical advisers.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make reports

  1. Report/logs are produced on completed system/plant/machinery/status/performance as required in accordance with standard operating procedures.
Report/logs are produced on completed system/plant/machinery/status/performance as required in accordance with standard operating procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

A person who demonstrates competency in this unit must be able to undertake commissioning procedures for plant and/or equipment. Competency in this unit cannot be claimed until all prerequisites have been satisfied.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts.

Context of and specific resources for assessment

This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.

This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with undertaking commissioning procedures for plant and/or equipment or other units requiring the exercise of the skills and knowledge covered by this unit.

Method of assessment

Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.

Guidance information for assessment

Required Skills and Knowledge

Required skills

Look for evidence that confirms skills in:

obtaining work approvals and permits

selecting measuring/testing devices

safely taking measurements/readings

recording variations in machine/plant performance from specification

making appropriate adjustments to machine/plant

completing short reports using relevant technical terminology

reading, interpreting and following information on written job instructions, specifications, manufacturer documents, commissioning procedures, charts, lists, drawings and other applicable reference documents

planning and sequencing operations

checking and clarifying task related information

entering information onto standard workplace forms and reports

checking for conformance to specifications

using precision measurement equipment

undertaking numerical operations and calculations/formulae within the scope of this unit

Required knowledge

Look for evidence that confirms knowledge of:

the sequence of events in the commissioning of the machine/plant

performance tests appropriate to the machine/plant to be commissioned

measurements required to ensure conformance to specifications and correct points at which measurements are to be taken

appropriate adjustments to bring the machine/plant into line with operational specifications based on engineering principles or appropriate technical advice

reporting requirements relevant to the machine/plant being commissioned

use and application of personal protective equipment

safe work practices and procedures

relevant hazards and control measures related to the competency

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Plant/system

Rotating equipment and machinery, production equipment, plant and machinery, process equipment, and machine tools etc.