The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan work
|
|
Load transfer authorisation is obtained, including lift time and load destination Completed |
Evidence:
|
Potential hazards for load lift and transfer are identified Completed |
Evidence:
|
Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment Completed |
Evidence:
|
Weight (mass) of the load is estimated in consultation with associated personnel Completed |
Evidence:
|
Appropriate paths for the movement of loads in the work area are determined Completed |
Evidence:
|
Crane capacity is checked as appropriate to the load Completed |
Evidence:
|
Appropriate communication methods are identified with associated personnel Completed |
Evidence:
|
Conduct routine checks
|
|
Appropriate hazard prevention/control measures are applied to the work area according to procedures Completed |
Evidence:
|
Crane is accessed in a safe manner Completed |
Evidence:
|
Crane is visually checked for any damage or defects Completed |
Evidence:
|
All signage and labels are visible and legible according to the appropriate standard Completed |
Evidence:
|
Routine pre-operational crane checks are carried out according to procedures Completed |
Evidence:
|
All controls are located and identified Completed |
Evidence:
|
Crane service logbook is checked for compliance Completed |
Evidence:
|
Crane is started according to procedures and checked for any abnormalities Completed |
Evidence:
|
Crane safety devices are tested according to procedures Completed |
Evidence:
|
Post-start operational checks are carried out according to procedures Completed |
Evidence:
|
All communication equipment is checked for serviceability Completed |
Evidence:
|
All damage and defects are reported and recorded according to procedures, and appropriate action is taken Completed |
Evidence:
|
Transfer loads
|
|
Hoist block is positioned over load following directions from associated personnel Completed |
Evidence:
|
Test lift is carried out according to procedures Completed |
Evidence:
|
Loads are transferred along planned path Completed |
Evidence:
|
All crane movements are according to procedures and the appropriate standard Completed |
Evidence:
|
Communication signals are interpreted correctly according to procedures and the appropriate standard Completed |
Evidence:
|
Crane is operated according to procedures Completed |
Evidence:
|
Load movements are monitored constantly ensuring safety to personnel and load, and structural stability Completed |
Evidence:
|
Unplanned and/or unsafe situations are responded to in line with procedures Completed |
Evidence:
|
Shut down and secure crane
|
|
Crane is parked according to procedures Completed |
Evidence:
|
Crane and equipment are stowed and secured according to procedures and the appropriate standard Completed |
Evidence:
|
All relevant motion locks and brakes are applied, where applicable Completed |
Evidence:
|
Crane is shut down according to procedures Completed |
Evidence:
|
Routine post-operational crane checks are carried out according to procedures Completed |
Evidence:
|
Hazard prevention/control measures are removed, where applicable Completed |
Evidence:
|
All damage and defects are reported and recorded according to procedures, and appropriate action is taken Completed |
Evidence:
|